ML18009A571

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1990 for Harris Nuclear Power Plant Unit 1
ML18009A571
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/31/1990
From: Hale M, Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-903017-(O), NUDOCS 9006190070
Download: ML18009A571 (10)


Text

ACCELERATED D+TRJBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.W.

Carolina Power 6 Light Co.

RICHEY,R.B.

Carolina Power 6 Light: Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET g

05000400

SUBJECT:

Monthly ing rept for May 1990 for Harris Nuclear Power Plant

/90061 ltr.

DISTRIBUTION COD 24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

D NOTES:Application for permit renewal filed.

o5ooo4oo

/

RECIPIENT ID CODE/NAME PD2-1 LA BECKER, D INTERNAL: ACRS AEOD/DSP/TPAB QDXrBQ+4P 10 REG FIL 01 EXTERNAL EG&G STUARTi V A NRC PDR COPIES

, LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEABll RGN2 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 27 ENCL 27

Carolina Power & Light Company JUN 1 4 1990 File Number'SHF/10-15505 Letter Number.

HO-903017 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1990.

Yours very truly, CS R. B. Richey Manager Harris Nuclear Project MWH:mcj Enclosure cc.'Messrs.

S.

D. Ebneter (NRC-RII)

R.

G. Oehl (DOE)

J.

E. Tedrow (NRC-SHNPP) 9006190070 900531 FOR IDOL-,K 0S000400 R

PDC MEN/DATAREPa/1/OS4

DOCKET NO.:

050-400 UNIT:

Harris Unit 1

DATE:

May 1990 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

Harris Unit 1

operated at a 61.73 percent Availability Factor for the referenced month and a

57.05 percent Capacity Factor.

There was one maintenance and one forced outage.

Unit is currently being returned to service.

Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor vessel and 230 spent fuel assemblies in Spent Fuel Pool B.

126 of the spent fuel assemblies are BWR and were shipped to Harris from CPGL's Brunswick Plant.

MEM/DATAREPa/1/OS4

.CPbL CO RUN DATE 06/04/98 RUN TXHE 15:18:35 PLANT PERFQRHANCE DA'I'A SYSTEH QI>>ELATING DATA REPORr'ARRIS UNIT PAGE RPD36-088 QPEf<ATXNG STATLIB DOCI(ET NQ. 050-408 COHPLETED K<Y HAfLI< M.

I-IALF I LLEPI-)ONE

( Y$ 9) 86. 944 I')

A

  • 3 A 4.

5.

6.

7.

8.

LINIT NAHE:

I IARRXS UNIT Rl=l'QRTING PI="'l4:I:QD:

HAY

'i'8 LICENSED 'I'HERHAL POWER (HW1')'775 NAHEPLATE RATING (GROSS HME>: 958.9 DESXGN ELECI'fAXCAL RATING (NET HME): '988.8 HAX DEPLNDABLI:- CAI AClTY (GROSS HME>: 920.8 HAX DEI'ENDAI<LE CAPACI1'Y (NET HME): 860.0 Xl= CI.IANGLB OCCUR IN CAPACITY RAT1NGB (XTEHS GIVE REASONS:

N/A NOTES There are 157 fuel I

assemblies in the reactor, 230 spent fuel assemblies in Spent

( Fuel Pool B, 126 of the spent fuel assemblies are BWR and were shipped from Brunswick.

I 3

TI.IRU 7>

SINCE LAST REPORT, 9*

38.

I'OWER LEVEI TO WHICH RESTRICTED IF ANY (NI=..T HWE):None ~

REASONS FOR RESTRICTION XF ANY:N/A

'T'I-II8 HONTI-I YR TG 1)ATE CUHUL ATIVE 11 A

  • 13.

14.

15.

16.

$ 7.

18.

1 'i'.

A 0 A HOURS XN REPORTING PERIOD NUHDEIR OF I-IOURS RLACTGR CRITXCAI REACTOfk RESERVE BI.IUTDQMN I-IRB IIOURB GENERATOR ON LINE UNX'I'ESFRVF Bl-IUTDOMN HGUf<S GROSS TIIERHAL ENLRGY GEN ~

(HWH)

Gf<OSB ELEC.

ENERGY GEN.

(HMI-I)

Nl=l'LEC. ENI=RL Y GENI:-'IRATED (HWH)

UNIT BEf(VICE FACTOR UNIT AVAILABILITYI=ACTOR LJNIT CAf". FACTOR (USXNG HDC NET)

+ J4 UNIT FGICCED GU'T'AGE fkATE SHUTDOWNS SCHI'=D.

OVER NEXT 6 HONTHS 22.

UNIT CAI".

I. AC'1'GR

( USING DER NET )

744.88 476.97

.88 459.28

.80

<289<89.68 399291.88 365842.00 61.73 61.73 57.85 54.52 22,37

( TYI'E, DATL=',

3623.00 3355A97

.88 3338.28

.88 8668656.08 2988866.08 2712563

~ 88 92.34 92 '4 87.86 83.19 3.83 AND Dur<A1ION 27824.00 23353

~ 54

.00

"'0997 63

.08 55218334.48 18359128.88 17858731.88 77.70 77.70 73.37 70.3 1

4.77 QF EACII):

25.

'76 IF Bl IUTDQMN hT END OF REPOR1'ERIOD, ESTXHA1'ED DATE QF START UP:

UNlTB IN TEST STATUS (PRlOR TO COHHERClAI OPERATlQN):

I='QRECABT ACHIEVED XNITlhL CRITXCALII'Y XNXTXAL I:-'I I=CTRlCXTY CGHHERCXAL OPERATXON MEM/DATARZPa/2/PS(,

1.16 9

~CPbL CQ RUN DATE RUN T1HI:

86/84/98 14:45:46 PLANT PEIRI-'OIRHANCE DATA SYSTEM APPENDIX K< AVERAGE DALI Y POWER LEVEL I-IARR1 8 UNIT PAGL=

RPD39-888 HAY DAY AVG. DAXLY POWER LL'Vl:-L

<iNME-NET)

DOCI(LT NO. 058-488 CONPLETED 9Y HAI<K W.

I-IALE TEI I=I IHONI:- (919) 362-2944 DAY AVG. DAlLY I"OWER LI:-'VEL CHME-NET) 854 28 876 878 10 872 871 26 28 38

-34 MEM/DATAREPa/3/OS4

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

MAY 1990 DOCKET NO.:

050-400 UNIT NAME:

Harris DATE:

6/4/90 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944 No.

Date Tl Y

P e

Duration (Hours)

R Method of Shutting Down Reactor3 Licensee Event Report II'ystem Code 4

Component Code 5

Cause II, Corrective Action to Prevent Recurrence 90-007 900519 152.35 N/A VALVE Unit removed from service for maintenance on valve IFW-232, a level transmitter root Isolation valve on Steam Generator "IC".

The valve was replaced.

A leaking condenser tube in the East waterbox of the condenser was also plugged.

The work items were completed at the scheduled outage end time/date.

A problem identified during the outage with the emergency sequencer forced the unit to remain off-line.

Reference Event $90-008 for details.

F:

Forced S:

Scheduled Reason:

A-. Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I Same Source MEM/DATAREPa/4/OS4

0

%%Sf E

/i

,J I

~'

II

~

~

II I

I I

I

~

~ 'I

~ ~ I I

~

~

~

I ~

~

~

~

~

~

~

~ ~

~ ~

~

~

I

~

~ ~

~

~

~

~

~ '

~

~

~

~

~

~

~ ~

~

~

~

~

~

~

~

~

~

~

~

~

I ~ ~

~

~

~ ~

~

~

~

~

~

~

~

~

~

~

~

~

i

~

~

~

~

I I ~

I

~

~

I

~

~

~

~

~

~

~

~

~

~

~

~

I

~'

a li Pe e~ e

~ I

~

~

~ ~

~ I I

~

~

~ ~

~

~

~

~

I ~

~ ~

0 '

I

~

~ II

~

~

~

~

I..

~

~ ~

~

~

~

~

~

~

I ~

~

~

~

~

~

~

~

I

~

~

1

~

I I

e

~

Is

~

~

~

~

I ~

I

~

~