t t
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 CAROLINA POWER 5 LIGHT COMPANY et al.
DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 17 License No.
NPF-63 The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Carolina Power 8 Light Company, (the licensee),
dated May 5, 1989, as supplemented May 25,
- 1989, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph
- 2. C.(2) of Facility Operating License No.
NPF-63 is hereby amended to read as follows:
900517007i 900509 PDR ADOCK 05000400 P
PDO
l I
l (2)
Technical S ecifications and Environmental Protection Plan The Technical Specifications contained. in Appendix A, and the Environmental Protection Plan contained in Appendix B, both of which are attached
- hereto, as revised through Amendment No.
17, are hereby incorporated into this license.
Carolina Power 8 Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
May 9, 1990 Elinor G. Adensa, Director Project Directorate 11-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation OFC
.: LA:
'NAME:P nd
~
~ 4 DATE :4/ (/90 RPR: PM: PD21: DRPR:
- D: P:DRPR:
R
.se: J, Qs~sm:
EAdensam 4/lu9O:4/099O: /
/9O OFFICIAL RECORD COPY
t I
4
ATTACHMENT TO LICENSE AMENDMENT NO. 17 FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO. 50-400 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.
The revised areas are indicated by marginal lines.
Remove Pa es 3/4 4-31 3/4 4-32 Insert Pa es 3/4 4-31 3/4 4-32
TABLE 4.4-4 TYPE OF MEASUREMENT AND ANALYSIS REACTOR COOLANT SPECIFIC ACTIVITY SAMPLE AND ANALYSIS PROGRAM SAMPLE AND ANALYSIS FRE UENCY MODES IN WHICH SAMPLE AND ANALYS1S RE UIRED 1.
Gross Radioactivity Determination At least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
1,2,3,4 2.
Isotopic Analysis for DOSE EQUIVA-LENT I-131 Concentration 1 per 14 days.
3.
Radiochemical for E Determination 4.
Isotopic Analysis for Iodine Including I-131, I-133, and I-135 1 per 6 months**
a.
Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, whenever the specific activity exceeds 1
pCi/gram DOSE EQUIVALENT I-131 or 100/E pCi/gram of gross radioactivity, and 14, 28, M, 48, 5P b.
One sample between 2
and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> following a THERMAL POWER change exceeding 15X of the RATED THERMAL POWER within a 1-hour period.
1,2,3
TABLE 4.4-4 (Continued)
TABLE NOTATIONS
~Sample to be taken after a minimum of 2 EFPD and 20 days of POWER OPERATION have elapsed since reactor was last subcritical for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or longer.
$Until the specific activity of the Reactor Cool'ant System is restored within its limits'HEARON HARRIS - UNIT 1 3/4 4-32 Amendment No.