Requests Addl Info Re 890603 Amend Application to Revise Tech Specs 3.4.9.1 & 3.4.9.2 Re Heatup & Cooldown Limits for RCS & Associated Low Temp Overpressure Protection Sys Setpoints,Respectively
ML18009A404
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/16/1990
From: Becker R
Office of Nuclear Reactor Regulation
To: Eury L
CAROLINA POWER & LIGHT CO.
References
TAC-71500, NUDOCS 9003220097
Download: ML18009A404 (7)


Text

~ 'Pg March 16, 1990 OOU j'A Docket No. 50-400 Mr. Lynn N. Eury Executive Vice President Power Supply Carolina Power 8 Light Cor(pany P.

0.

Box 1551

Raleigh, N.

C.

27602

Dear Mr. Eury:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR REACTOR COOLANT SYSTEM PRESSURE-TEMPERATURE LIMITS AMENDMENT REQUEST -

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 (TAC NO. 71500)

By letter dated June 3,

1989, you submitted an application to revise numerous Shearon Harris Nuclear Power Plant, Unit 1, (Harris) Technical Specifications including 3.4.9.1 and 3.4.9.2, REACTOR COOLANT SYSTEM PRESSURE/TEMPERATURE LIMITS.

This proposed amendnent will revise the heatup and cooldcwn limits for the reactor coolant system and the associated Low Temperature Overpressure Protection (LTOP) system setpoints.

In our review of this all.ndment application, we find that we need the information requested in the enclosure to cooylete our review.

Please respond to this request within 30 days of receipt of this letter.

The reporting and/or recordkeeping requireoants contained in this letter affect fewer than ten respondents:

therefore, OMB clearance is not required under P.

L.96-511 Sincerely, Ngoc B. Le/for wOQ NO OH jN iYi0OQ (jh,QQ cc:

See next page DISTR IBUTION p

Richard A. Becker, Project Manager Project Directorate II-1 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation OFC: LA:

NAME:PAn DATE 3/I 9/90'PM:Pc r:sw

3/)6/90

~ Do PAd nsam W

WO

3/((E90

&WAS W

OFFICIAL RECORD COPY Document Name:

LTR EURY 71500 Z Fp(

(I (

4 I

'1 1'

/

'"1 I

H 1l I

ll f

l g

q g y sr a'1

~c I

. ~

II

+

II h

Ig,=g

.f I ill "I

'L...

Q

~ )

II lk 1

~

gg p>

8

()1 4'tw 4

'~

J ~

'h

~

~ I

Mr. L. W. Eury Carolina Power 5 Light Company CC:

Shearon Harris Mr. R. E. Jones, General Counsel Carolina Power 8 Light Company P. 0.

Box 1551 Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U. S. Nuclear Regulatory Commission Route 1, Box 315B New Hill, North Carolina 27562 Mr. R. B. Richey, Manager Harris Nuclear Project Harris Nuclear Plant P. 0.

Box 165 New Hill, North Carolina 27562 Mr. H. A. Cole Special Deputy Attorney General State of North Carolina P. 0.

Box 629

Raleigh, North Carolina 27602 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30323 Mr. C. S. Hinnant Plant General Manager Harris Nuclear Plant P. 0.

Box 165 New Hill, North Carolina 27562 Mr. Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environmental, Commerce 5 Natural Resources P. 0. Box 27687

Raleigh, North Carolina 27611-7687

REQUEST FOR ADDITIONAL INFORMATION AMENDtlEHT RE UEST FOR REACTOR COOLANT SYSTEH PRESSURE-TEMPERATURE LIf1ITS Describe the thermal-hydraulic analysis performed in the power operated relief valve (PORY) setpoint study to prevent a potential violation of allowable pressure-temperature (P/T) limits during plant heatup and cooldown.

Including the following:

I'.

Major assumptions used in the current analysis as well as the analysis presented in the Final Safety Analysis Report.

b.

Brief discussion of the method/computer code used in the analysis.

c.

Transient Reactor Coolant System (RCS) pressure at various PORV setpoints.

d.

Comparison of the peak RCS transient pressure with the allowable P/T limits to confirm that the Appendix G P/T limits will not be v io lated.

~sI

DISTRIBUTION

'Do cket=Fi-le NRC PDR Local PDR S.

Varga G. Lainas E.

Adensam P.

Anderson R. Becker OGC (For inform. Only)

E. Jordan ACRS (10)

Harris File 14-E-4 14-H-3 14-B-20 14-B-20 14-B-20 15-B-18 MNBB-3302 P-315

l'.dS, l

P ~

n Al f

4 ll sl l

l iv

~

I, I

m el )

>s>

i,

~

"'1 o

~ I I

/$

l II Id

~

,Zl l l lp Il

~,~

~ I Jl II l 'l