Text
ACCELERATED DI TRJBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)
ACCESSXON NBR:9003200134 DOC.DATE: 90/02/28 NOTARXZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATXON HALE,M.
Carolina Power 6 Light Co.
RICHEY,R.B.
Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400 R
SUBJECT:
Monthly op Plant,Uni 1.W/900313 lt Feb 1990 for Harris Nuclear Power D
DISTRIBUTION CODE: IE S RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Spec NOTES:Application for permit renewal filed.
ENCL SIZE:
)
05000400
/
RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/LPEB10 NRR/DREP/PRPB11 REGM33K~~ 01 EXTERNAL: EGGG SIMPSON,F NRC PDR COPXES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA IBM TECH ADV NRR/DOEA/OEAB11 NUDOCS-ABSTRACT RGN2 LPDR NSIC COPXES LTTR ENCL 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 29 ENCL 29
Carolina Power & Light Company P. O. Box 165 ~ New Hill~ N. C. 27562 R. B. RICHEY Manager Hards Nuclear Project MAR T 5 3990 File Number.'HF/10-15505 Letter Number'HO-903009 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO>>
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of February 1990.
Yours very truly, R.
B. Richey Manager Harris Nuclear Project MWH:kdl Enclosure cc.'Messrs.
S.
D. Ebneter (NRC-RII)
R.
G. Oehl (DOE)
J.
E. Tedrow (NRC-SHNPP) 9003200134 900228 PDR ADOCK 05000400 R
PDC MEM/DATAREPa/1/Oo4
l"
~ w
% ~
lt
' I C
DOCKET NO.:
050-400 UNIT:
Harris Unit 1
DATE:
February 1990 COMPLETED BY:
Mark Hale OPERATIONS
SUMMARY
Harris Unit 1 operated at a 100.00 percent Availability Factor for the month of February with a
97.80 percent Capacity Factor.
There was one load reduction.
Details are provided on the Unit Shutdowns and Power Reduction Sheet.
There are 157 fuel assemblies in the reactor vessel and 194 spent fuel assemblies in Spent Fuel Pool B.
90 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.
MEM/DATAREPa/1/OS4
CF'b I CQ PLAHT PERFORMANCE DATA ~~~TEM
.I~uN.,DASE 83Z85r98 M
OPERATING DATA aEPQ~
RUg TXMF 11:19:86 HARRIS UNIT PAGE RPD36-888 OPERATIHG STATUS DOCI(ET HQ. 858-488 COMPLETED BY MARI( M.
I-IALE TELEPI-IGNE (919)362-2944 3*
4.
5 46.7.
8.
UHXT NAME:
I-IARRXS UNIT REPORTING PERIOD:
I=EBRUARY 98 LICENSED Tl-IERMAL F'OWER (MWT): 2775 HAMEPLATE RATING (GROSS MME>: 950.9 DEBXGN ELECTRICAL RATING (NET MWE): 988.8 MAX DEPENDABLE CAPACITY (GROSS MWE): 928.8 MAX DEF'EHDABLE CAPACITY (HET MWE): 860.8 XF CHAHGEB OCCUR XN CAPACITY RATINGS (ITEMS GIVE REASONS:
N/A NOTES There are 157 fuel I assemblies in the reactor, 194 I spent fuel assemblies in Spent I Fuel Pool B, 90 of the spent I fuel assemblies are BWR and were I shipped from Brunswick.
3 THRU 7)
SIHCE LAST IEEPORT, 18.
POWER LEVEL TQ WHXCH RESTRXCTLD Xl"- AHY (HFT MWE>: None.
REASONS FQR RESTRXCTXON XF ANY: N/A THXS MQNTI-I YR TO DATE CUMUL ATlVE 31*
2 4 13.
14.
15*
16.
17 ~
18.
19 ~
.>0 r) t )
k A
k 23.
I')4 I-IQURS 1H REPQRTXNG PERIOD NUMBER Ol= HOURS RI=ACTOR CR1T ICAL REACTOR RESERVF
.I-IUSDQWN HRS I.IOURS GENERATOR QN L1HE UHXT RESERVE Sl-IUTDGWH I-IGURB GROSS THLRMAI ENERGY GEH.
( MWI-I>
GROSS ELEC.
ENERGY GEH.
(MMI-I)
NET LLEC ~
EHI-"IRGY GENERATED (MWI-I>
UHIT SERVICE FACTOR UNIT AVAILABXLXTYI=ACTOR UNIT CAP.
FACTOR (USING MDC NET)
UHIT CAP.
I=ACTOI'( (UB1NG DER Nl T)
UNXT FORCED OUTAGE f<A1'E Bl-IUTDOWNS BCHED.
OVER NEXT 6 MONTHS 672.88 672.00
.88 672.80
.08 1787277.68 603486.00 565226.88 188.88
'l00.08 97.80 93.46
.08 (TYPE,
- DATE, 3 416*88
$ 436.88
.88 1436.08
.88 3746609.64 1269483.88
<<8853<.88 300.88 300.08 97.60 93.26
.00 AND DURATIGH 24817.88 19433.57
.08
<9875 '5
.00 58288288.04
$ 6719665.88 155 6699 88 76.86 76.86 72.75 69.52 4.68 Ol= LACH):
25 4
.)6 IF sHUTDQMH AT EHD OF REPORT
- PERIOD, EsTIMArr:D DATE QF sTART Ur":
UNITS XH TEST STATUS (I RIOR TO COMMERCIAL OPERAT1OH):
FORECAST ACHIEVED IHITXAL CRITXCALITY 1H1TIAl ELI=CTI'<I CITY COMMERCIAI QPERATIOH MEf/DATAREPa/2/OS4
0
'l t
r 'l lt
CPbL CO
~
PLANT PERFORHANCE DA'I'A
~~ ')I'EH
.RUN,, DATL.
83/05/90
~~ENDXX B AVERAI E DAXLY ~El'EVLL RI'IA-TXHd
<<:2e:2~
HARRX8UNX1'AGE IEPD39-880 FEBRUARY DAY AVG. DAlLY POWER LEVEL (HWE-NET)
DOCI(ET NO.
eSO-4eO COHPLETED BY HARI< W.
I-IALE TELEPI IGNI.
(91 9) 362-2944 DAY AVG.
DAXLY POWER LEVEL (HWE-NET) 882 347 887 890 12
.) 8 877 MEM/DATAREPa/3/OS4
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
FEBRUARY 1990 DOCKET NO:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
050-400 Harris 3/5/90 M, W. Hale (919) 362-2944 Date Tl Y
p e
Duration (Hours)
R e
Method of Shutting Down Reactor Licensee Event Report f System Code 4
Component Code 5
Cause 8, Corrective Action to Prevent Recurrence 90&02 900202 0,0 N/A HC Load reduced to 38'o Inspect and clean condenser waterboxes and perform miscellaneous maintence, The waterboxes were cleaned and approximately 50 lbs.
of debris was removed from each side, Additional maintenance included:
the repair of a ISO-Phase Bus Duct Fan, leak repairs on A and B Heater Drain Pumps and Turbine Valve testing.
The Unit was returned to full load.
1 F:
Forced S:
Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training II, License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit I Same Source MEM/DATAREPa/4/OS4
t 0
\\
S, 4 '