ENCLOSURE 1 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 RETYPED TECHNICAL SPECIFICATION PAGES REACTOR COOLANT SYSTEM PRESSURE-TEMPERATURE LIMITS 2
9002140248 90020i PDR
. ADOCK 05000400 P
~
.REACTOR COOLANT SYSTEM COOLDOV/N LIMITATIONS APPLICABLE UP TO 3
EFPY 2800 2600 MATERIAL PROPERTY BASES'ontrolling Material Copper Content Nickel Content Regulatory Guide RTNpT Initial RTNpT at 1/4 T RTNpT at 3/4 T
Error Margin
= Plate B4197-2
= 0.10%
= 0.50%
= 1.99, Rev.
2
= 86'F 167'F
= 152'F 10'F and 60 psig 2400 2200 2000 1800 1600 c
1400 ~
1200 ~
50'R 1000 ~I-O 800 z
5'R 10'/HR 20/ HR 600 400 200 100 140 180 220 260 300 340 380 420 INDICATED TEMPERATURE DEGREES 'F FIGURE 3.4-2 REACTOR COOLANT SYSTEM COOLDOWN LIMITATIONS APPLICABLE UP TO 3
EFPY SHEARON HARRIS UNIT 1
3/4 4 Amendment No.
REACTOR COOLANT TEM HEATUP LIMITATIONS APPLICABLE UP TO 3 EFPY MATERIAL PROPERTY BASES:
LEAK &
HYPROTEST LIMIT 2800 2600 Controlling Material Copper Content Nickel Content Regulato~
Guide RTNpT Initial RTNpT at 1/4 T RTNpT at 3/4 T Error Margin
= Plate B4197-2
~ 0.10%
~ 0.50%
=. 1.99, Rev. 2 86'F 167'F 152 F 10'F and 60 psig 100'/H 2400 2200 2000 1800 cn 30'/HR 20'R iJ'0'/HR 1600 I
1400 ~
1200 CI IJJ 1000 ~
C)z 800 600 10/ HR 400 200 100 140 180 220 260 300 340 380 420 INDICATED TEMPERATURE DEGREES F
FIGURE 3.4-3 REACTOR COOLANT SYSTEM HEATUP LIMITATIONS APPLICABLE UP TO 3
EFPY A
SHEARON HARRIS UNIT 1
3/4 4-36 Amendment No.
1020
>0 9
8 7
6 1019
)
9 8
7 8
bJOZ 2
LxJ O
10'8
~
CL 9
8 bJ 7
8 1 017 10 15 20 25 OP E:RATING TltvlE (E'FPY) 30 FIGURE B 3/4.4-1 FAST NEUTRON FLUENCE (E)1MeV) AS A FUNCTION OF FULL POWER SERVICE LIFE SHEARON HARRIS UNIT 1
B 3/4 4-9 Amendment No.