ACCELERATED D1+glBU'EON DEMONSTJ+TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8909270016 DOC.DATE:M~~h-NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.

Carolina Power 6 Light Co.

RICHEY,R.B.

Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

NOTES:Application for permit renewal.filed.

perating rept for Aug 1989 for Harris Unit l.

091 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs S

05000400 RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10 N

/JERE&/W 10 EG FILE EXTERNAL: EG&G SIMPSON, F NRC PDR COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 S

NaTE IO ALL RIDS" RZCZPIEtGS'IZASE HELP US TO REDUCE %RHR!

QMHKT 'IHE DOCUMEÃZ CXNHKL DESK, RXN Pl-37 (EXT. 20079) I ELXKMGR KN3R NAME FSQM DIBTRIHTTIGN TOTAL NUMBER 188 %8FP SP %%%

ENCL 29

/)

~

~ p

~

CME Carolina Power 8 Light Company HARRIS NUCLEAR PROJECT P. 0 ~ Box 165 New Hill, North Carolina 27562 SEPZ 5>BSe File Number:

SHF/10-15505 Letter Number:

HO-893048 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO ~

1 DOCKET NO. 50-400 LICENSE NOe NPF-63 MONTHLY OPERATIONS REPORT Dear Sirs'.

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power ir Light Company herewith submits the report of operation statistics and shutdown experience for the month of August 1989.

Yours very truly, MWH:dj Enclosure R. B. Richey Manager Harris Nuclear Project cc.'essrs.

W. H. Bradford (NRC-SHNPP)

S.

D. Ebneter (NRC-RII)

R.

G. Oehl (DOE) 8909270016 89083$

PDR ADOCK 0g000400 R

FDc MEM/DATAREPa/1/OS4

DOCKET NO.:

050-400 UNIT:

Harris Unit 1

DATE:

August 1989 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a 100.00 percent Availability Factor for the month of August with a

97.71 percent capacity factor.

There was one load reduction.

Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor vessel and 106 spent fuel assemblies in the Harris Unit 1 spent fuel pool.

54 of the 106 spent fuel assemblies were shipped to Harris from CP&Ls Brunswick Plant.

There are 0

assemblies in the new fuel pool.

MEM/DATAREPa/1/OS4

0 0

~l~

4' I

1 I

O~

CP6L'CO

~ RUN DATE 09/08/89

c. RUN TIHE 88: 45:

3 8

,ii T PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 3

PAGE RPD36-080 OPERATING STATUS DOCKET NO. 058-400 COMPLETED BY MARK W.

HALE TELEPHONE (919)362-2944 k

2 k 3 4 5.

6.

7.

8.

UNIT NAME:

HARRIS UNIT 1

There are 157 fuel REPORTING PERIOD:

AUGUST 89 I

assemblies in the reactor LICENSED THERMAL POWER

<HMT): 2775 I

and 106 spent assemblies in I

NAMEPLATE RATING (GROSS MWE>: 950.9 I

the spent fuel pool.

I DESIGN ELECTRICAL RATING (NET HME): 900 0

I 54 of the spent assemblies I

HAX DEPENDABLE CAPACITY (GROSS HME)'28 0

I were shipped to Harris from I

MAX DEPENDABLE CAPACITY (NET MWE): 860.8 gm7~s WrunswicTc Plant.

IF CHANGES OCCUR IN CAPACITY RATINGS <ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS'/A 9.

18.

I OWER LEVEL TO WHICH RESTRICTED IF ANY (NET HWE): None, REASONS FOR RESTRICTION IF ANY: N/A THIS HONTH YR TO DATE CUHUL ATIVE 31.

f2.

33.

14.

15.

16.

17.

18.

39.

v 20.

21.

22.

23.

24.

HOURS IN REPORTING PERIOD 744.88 NUMBER OF HOURS REACTOR CRITICAL 744.00 REACTOR RESERVE SHUTDOWN I-IRS

.80 HOURS GENERATOR ON LINE 744.80 UNIT RESERVE SHUTDOMN HOURS

.08 GROSS THERHAL ENERGY GEN.

(HWH) 2843)88.38 GROSS ELEC.

ENERGY GEN.

(HWH) 667418.88 NET ELEC.

ENERGY GENERATED

<HMH) 625193.88 UNIT SERVICE FACTOR 3 88. 88 UNIT AVAILABILITYFACTOR

<ee.ee UNIT CAP.

FACTOR (USING HDC NET) 97.71 UNIT CAP.

FACTOR (USING DER NET>

93.37 UNIT FORCED OUTAGE RATE

.08 SHUTDOWNS SCHED.

OVER NEXT 6 HONTHB (TYPE,

DATE, Refueling Outage, October 21,
1989, 583).88 5749.20

.00 57i0.65

.00 15374836.44 5898639.88 4763230.80 97.94 97.94 94.99 90.76 2.06 AND DURATION 3 weeks.

28472.00 16784.28

.08 16494.88

.88 43623499.58 14493126.88 13469546.88 88.57 80.57 76.5<

73.1 3

5.23 OF EACH):

25.

26.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED 1NITIAI CRIT1CALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MEM/DATAREPa/2/OS4

~

V CPSL'CO PLANT PERFORMANCE DATA SYSTEM

~ RUN DATE 09/08/89 APPENDIX B AVERAGE DAILY POWER LEVEL

'UN TIME 08'45:08 HARRIS UNIT 1

PAGE RPD39-000 AUGUST 1989 DAY AVG. DAILY POWER LEVEL (MWE-NET) 848 DOCKET NO. 050-400 COMPLETED BY MARK W.

HALE TELEPHONE (919)362-2944 DAY AVG. DAILY POWER LEVEL (MWE-NET) 20 849 858 855 l

860 851 847 23 30 828 8<4 846 851 838 720 823 838 1.16 - 8 MEM/DATAREFa/3/OS4

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

AUGUST 1989 DOCKET NO.:

050"400 UNIT NAME:

Harris DATE:

9/8/89 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944 No.

Date Tl y

P e

Duration (Hours)

R Method of Shutting Down Reactor3 Licensee Event Report S

System Code 4

Component Code 5

Cause 8, Corrective Action to Prevent Recurrence 89-021 890826 00 N/A HA VALVEX Load reduced to 70$ to perform turbine valve testing.

The required tests were completed and the unit was returned to full load.

I F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G&perational Error (Explain)

Hither (Explain)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I Same Source MEM/DATAREPa/4/OS4

~

~