., ACCELERATED DJ~BU'nON DEMONSTRQON SYSTEM REGULATORY INFORMATION DIPTQIBUTION SYSTEM (RIDS)

Z/rz/A'ACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.W.

Carolina Power

& Light Co.

RICHEY,R.B.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

M y

crating rept for July 1989 for Harris NPP Unit 1.

890811 tr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR g ENCL Q SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed.

S 05000400 RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10 G FILE 01 EXTERNAL: EG&G SIMPSON, F NRC PDR COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1.

1 1'

1 1

1 1

R NOPE 'IO ALL "RIDS"

-RECIPIENIS'LEASE HELP US 'IO REDUCE HASTE!

CXNI'ACT THE DXXNEPI,'ONGEAL DESK ROCN Pl-37 (EXT. 20079)

IO EIiBGHATR KKR NAME HKH DI8TRIBUXION LISTS FOR DOCK%&IS YOU DCÃ~T NEEDt TOTAL NUMBER OF COPIES REQUIRED:

LTTR 29 ENCL 29 D

D

0

~C'.

r't l

4 IP

CSEE Carolina Power 8 Light Company HARRIS NUCLEAR PROJECT P. 0.

Box 165 New Hill, North Carolina 27562 AUGl 1 198g File Number:

SHF/10-15505 Letter Number:

HO-893038 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63

- MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of July 1989.

Yours very truly, MWH:dtp Enclosure R. B. Richey Manager Harris Nuclear Project cc'Messrs.

W. H. Bradford (NRC-SHNPP)

S.

D. Ebneter (NRC-RII)

R.

G. Oehl (DOE) f SPOSgw03gg R

ADOCK pgpppgp PDC MEM/DATAREPa/1/OS4

4

DOCKET NO.:

050-400 UNIT:

Harris Unit 1

DATE:

July 1989 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a 100..00 percent Availability Factor for the month of July with a

97.51 percent capacity factor.

There were two load reductions.

Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor vessel and 70 spent fuel assesemblies in the Harris Unit 1

spent fuel pool.

18 of the 70 spent fuel 0

assemblies were shipped to Harris from CP6Ls Brunswick Plant.

There are assemblies in the new fuel pool.

MEM/DATAREPa/1/OS4

1 ~

~ r I

~

I.'(f'hL CO RUN~DATE 08/04/89

~,RUN TIME 19:15:57 P~)T PERFORMANCE DATA SYSTEM

~OPERATING DATA REPORT HARRIS UNIT 1

PAGE RPD36-000 OPERATING STATUS DOCKET NO. 050-400 COMPLETED BY MARK W.

HALE TELEPHONE

('919)362-2944 k

~lVa 4 ~

5.

6.

7 4 Q.

UNIT NAME:

HARRIS UNIT 3

NOTES There are 157 fuel l)EPORTIHG PERIOD:

JULY 89, assemblies in the reactor I

LICENSED THERMAL POWER (MWT): 2775 and 70 spent assemblies inl NAMEI'LATE RATING (GROSS MWE): 950.9 the spent fuel pool.

DESIGN ELECTRICAL RATING <HET MWE): 909.9 I

18 of the spent assembliesl MAX DEPENDABLE CAPACITY (GROSS MWF): 929.9 I

were shipped to Harris MAX DEPENDABLE CAPACITY (HET MWE): 860.'0

--fromm-SPAT '-sSr~~-@lant IF CHANGES OCCUI'N CAPACITY RATIHGS (1TEMS 3 THRU 7)

SIHCE LAST REPORT, GIVE REASONS: N/A 9

39.

IOWLR LEVEL TO WHICH RESTRICTED IF AHY (HET MWE) 'one RFABOHS FOR RESTRICTION IF At<Y: N/A TIIIS thOt<TH YR TO DATE CUMUL ATIVE Q,

f3.

(4.

'I 5 ~

16.

17 18.

19.

20.

21.

k

~

~

23 ~

24, I-IOURS IN REPORTIHG PERIOD 744.90 5987.00 39728.99 NUMBER OF HOURS REACTOR CRITICAL 744.00 5005.20 f6949.29 REACTOR RESERVE SHUTDOWt<

I.IRB

.90

.90

.09 IIOURS GENERATOR ON LINE 744.00 4966.65 15759.88 UHIT RESERVE SHUTDOWN HOURS

.99

.00

.00 GROSS THERMAL ENERGY GEH.

(MWH) 293973$.56

$ 3335648.34 4358933k.49 GROSS ELEC.

Et]ERGY GEN.

(MWH) 666236.09 442329$.99

$ 3823798.99 NET ELEC.

ENERGY GENERATED (MWH) 623888.00 4138937.99 12844353.99 UNIT SERVICE FACTOR f99.99 97.63

79. 84 UNIT AVAILABILITYFACTOR 199.99 97.63
79. 84 UNIT CAP.

FACTOR (USIt(G MDC HET) 97.53 94.59 75.73 UNIT CAP.

FACTOR (USIHG DER HET)

93. l 7 90.38 72.34 UNIT FORCED OUTAGE RATE

.90 2.37 5.46 SHUTDOWNS SCHED.

OVER HEXT 6 MONTHS (TYPE,

DATE, AND DURATION OF EACH):

Refueling Outage, October 21,

1989, 7 weeks.
25. IF SHUTDOWN AT Et~D OF REPORT
PERIOD, ESTIMATED DATE OF START UP:

UNITS IN TEST STATUS

<PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRiiICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

<.t6 - 9 MEM/DATAREPa/2/OS4

C~Q CO P~T PERFORHANCE DATA SYSTEH RUN DATE 98/94/89 APPENDIX B - AVERAGE DAILY POWER LEVEL~

"RUN VIVa HARRIS UNIT f PAGE RPD39-000 JULY 3989 DOCKET NO. 050-400 COHPLETED BY HARK W.

HALE TELEPHONE (939)362-2944 DAY AVG. DAILY POWER LEVEL (HWE-NET)

DAY AVG. DAILY POWER LEVEL (HWE-NET) 825 858 847 20 856 849 24 845 845 847 30 840 848 851 849 824 743 845 1.16 8

MEM/DATAREPa/3/OS4

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

JULY 1989 DOCKET NO.:

050-400 UNIT NAME:

Harris DATE:

8/8/89 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944 No.

Date Ti Y

p e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report S

System Code 4

Component Code 5

Cause 6 Corrective Action to Prevent Recurrence 89-019 890701 N/A HA VALVEX Load reduced to 70$ to perform turbine valve testing.

The required tests were completed and the unit was returned to full load.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training II License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6&ther 4

Exhibit G-Instructions for Preparation of Data

'ntry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I Same Source MEM/DATAREPa/4/OS4

h

~

~a

~

~

a I

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

JULY 1989 DOCKET NO.:

050-400 UNIT NAME:

Harris DATE:

8/8/89 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944

~

e

~

~

No.

Date Ti Y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report S

System Code 4

Component Code 5

Cause 6 Corrective Action to Prevent Recurrence 89-020 890729 00 N/A VALVEX Load reduced to 70$'to perform turbine testing and to remove damaged damper debris from the Isolation Phase Bus Duct.

The testing was completed and the debris was removed.

The unit was returned to full load.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6&ther 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Same Source MEM/DATAREPa/5/OS4