ML18005A997
| ML18005A997 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/30/1989 |
| From: | Hale M, Richey R CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| HO-893036-(O), NUDOCS 8907180503 | |
| Download: ML18005A997 (10) | |
Text
ZC m TEo D1sTR1SvzoN DKMONsTz~TIoN sYrrzx t
~
REGULATORY XNFORMATION DISTRXBUTION SYSTEM (RXDS)
~ 'I'>>
ACCESSION NBR:8907180503 DOC.DATE: 89704~$ 0 NOTARIZED: NO FACIL:50-400,Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.
Carolina Power
& Light. Co.
RICHEY,R.B.
Carolina Power 6 Light, Co.
RECIP.NAME RECXPIENT AFFILIATXON DOCKET 05000400
SUBJECT:
Monthly operating re Power Plant, Unit 1
/890711 DISTRIBUTION CODE:
IE24D COP
-E TITLE:... Month1y-.Operating Report (per I
V NOTES:Application for permit renewal ne 1989 for Harris Nuclear l r ~
IVED:LTR ENCL SIZE:
Tech Specs) filed.
05000400 h
RECXPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10 N
RPB 10 EG LE 01 EXTERNAL EGGG S IMPSON g F NRC PDR COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1.
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA XRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT
~
RGN2 LPDR NSIC COPIES LTTR ENCL 1
1 1
1 2
2 1"1 1
1 1
1 1
1 1
R I
9 S
h NOXK XO ALL '%IZG" RECIPXXZIS:
HZASE HELP US K) REDUCE %RHR!
CONj~ 'ZHE DOCXMWZ CONI.'HOL DESK RXN P1-37 (EXT~ 20079) m 12i062KLTB YMR NME PS'ISTRIBUTION IZSTS MR DOCUMENTS YOU DGH~T NEEDf TOTAL NUMBER OF COPIES REQUIRED:
LTTR 29 ENCL 29 D
S
/+ M C
'I
~ ~
- I
~ 'I A
'f t I
V a
CSQD Carolina Power 8 Light Company JUl 11
~9S9 HARRIS NUCLEAR PROJECT P.
O. Box 165 New Hill, North Carolina 27562 File Number'.
SHF/10-15505 Letter Number:
HO-893036 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power
& Light Company herewith submits the report of operation statistics and shutdown experience for the month of June 1989.
Yours very truly, MWH:dtp Enclosure R.
B. Richey Manager Harris Nuclear Project cc:
Messrs.
W. H. Bradford (NRC-SHNPP)
S.
D. Ebneter (NRC-RII)
R.
G. Oehl (DOE) 8907180503 890630 PDR ADQCK 05000400 R
'DC MEM/DATAREPa/1/OS4
<rPW
DOCKET NO '50-400
,UNIT:
Harris Unit 1
DATE:
June 1989 COMPLETED BY:
Mark Hale OPERATIONS
SUMMARY
Harris Unit 1 operated at a 100.00 percent Availability Factor for the month of June with a 97.22 percent capacity factor.
There is one load reduction.
Details are provided on the Unit Shutdowns and Power Reduction=Sheet.
There are 157 fuel assemblies in the reactor vessel and 52 spent fuel assemblies in the Harris Unit 1 spent fuel pool and 0 assemblies in the new fuel pool.
MEM/DATAREPa/1/OS4
i
~
~
4 ~+'f'P4
CPbL CO RUN DATE 07/07/89 RUN TIME 18:3i:22 P
NT PERFORHANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 3
PAGE RPD36-060 OPERATING, STATUS DOCKET NO. 050-460 COHPLETED BY HARK W.
HALE TELEPHONE (919)362-2944 UNIT NAME:
HARRIS UNIT 1
I'NOTES There are 157 fuel I
2.
REPORTING PERIOD:
JUNE '9 I assemblies in the reactor 3.
LICENSED THERMAL POWER (HWT): 2775 I and 52 spent ass'emblies in I
.4.
NAMEPLATE RATING (GROSS WE): 950.'9 I the spent fuel pool.
~
I 5.
DESIGN ELECTRICAL RATING <NET MWE): 900.0 I
I 6.
HAX DEPENDABLE CAPACITY (GROSS HWE): 920.0 I
7.
HAX DEPENDABLE CAPACITY <NET HWE): 860.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS
( ITEHS 3 THRU 7)
SINCE LAST REPORT, GIVE REASONS:
N/A POWER LEVEL TO WHICH RESTRICTED IF ANY (NET HWE):None.
38.
REASONS FOR RESTRICTION IF ANY: N/A TH1S MONTH YR TO DATE CUHUL ATIVE HOURS IN REPORTING PERIOD 720.00 4343.00 32.
NUMBER OF HOURS REACTOR CRITICAL 720.00 4263.26
$ 3.
REACTOR RESERVE SHUTDOWN HRS
.00'00
<4.
HOURS GENERATOR ON LINE 720.00 4222.65 f5. UNIT RESERVE SHUTDOWN HOURS
.00
.00 16.
GROSS THERMAL ENERGY GEN.
(HWH) 1958239.82 11291916.78 37.
GROSS ELEC.
ENERGY,GEN.
<MWH) 642458.08 3756965.00 38.
NET ELEC.
ENERGY GENERATED (HWH) 683964.06 3514149.66 19.
UNI'J SERVICE FACTOR 108.88 97.23 20.
UNIT AVAILABILITYFACTOR 366.66 97.23 23.
UNIT CAP.
FACTOR (USING HDC NET) 97.22 94.09 22.
UNIT CAP.
FACTOR (USING DER NET) 92.90 89.91 23.
UNIT FORCED OUTAGE RATE
.00 2.77 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS (TYPE,
- DATE, AND DURATION Refueling Outage, October 21,
- 1989, 7 weeks.
38984.88
)5296.26
.08 15866.88
.08 39540579.84 13157472.88 12226465.66 79.05 79.05, 74.85 73.52 5.7f Ol= EACH):
25 IF SHUTDOWN AT END OF REPORT PERIOD
~
ESTIHATED DATE OF START UP
'6.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION f.16 - 9 HEN/DATAREPa/2/084
4 CI II
'4
i 44j co NT PERFORMANCE DATA SYSTEM RON DACE 07/07'/89'PPENDIX B AVERAGE DAILY POWER LEVEL RUN TIME 18: 33: 20 HARRIS UNIT PAGE RPD39-000 JUNE DAY AVG. DAILY POWER LEVEL (MWE-NET) 803 DOCKET NO ~ 050-400 COMPLETED BY MARK W ~,HALE TELEPHONE (9i9)362-2944 DAY AVG. DAILY POWER LEVEL (MWE-NET) h 7
772 2
893 812 802 20 855 855 857 853 850 843 26 856 846 857 852 27 28 30 848 856 MEM/DATAREPal3/OS4 6-8
. ~
g w J
~
~
A 7g
%,~%a~
U k
r.
n
-mes-=,
4
~
~
O.
II
'I +p)~l). "))I~
~ a'f A t+tt&
1
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
JUNE 1989 DOCKET NO.:
050-400 UNIT NAME:
Harris DATE:
7/6/89 COMPLETED BY:
M. W. Hale TELEPHONE:
(919) 362-2944 Nc.
Date Duration (Hours)
R Method of Shutting Down Reactor Licensee Event Report S
System Code 4
Component Code 5
Cause 8 Corrective Action to Prevent Recurrence I
-~18 890616 00 N/A HTEXCH Load reduced to 85$ to return DEH to automatic and to inspect the partition plate in Feedwater Heater 5B for bypass leakage.
The Feedwater Heater could not be isolated for the inspection.
The unit was restored to full load.
F:
Forced S:
Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit I - Same Source MEM/DATAREPa/4/OS4