Monthly Operating Rept for May 1989 for Shearon Harris Unit 1
ML18005A947
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/31/1989
From: Hale M, Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-893025-(O), NUDOCS 8906200354
Download: ML18005A947 (11)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8906200354 DOC.DATE: 89/06/14 NOTARIZED: NO

'ACXL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.

Carolina Power

& Light Co.

RICHEY,R.B.

Carolina, Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthly operating rept for May 1989 for Shearon Harris Unit 1.W/890614 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:Application for permit renewal filed.

8 05000400 RECXPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10 NRR/DREP R

0 0

EXTERNAL EG&G S IMPSON I F NRC PDR COPIES LTTR ENCL 4

1 1

10 10 1

1 1

1 1

1

, 1 1

1 1

1 1

RECIPXENT ID CODE/NAME PD2-1 PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2.

LPDR NSIC COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1,

1 D

D NOTE 'IO ALL "RIDS" RZCXPIENIS:

PIZASE HELP US TO REDUCE KQHZ~

CGNI'ACT 'IHE DOQ3MENI'GNIBDL DESKI ROOM Pl-37 (EXT. 20079)

KO ELIKCNATZ YOUR NME FROM DIPHUBUTION LISTS POR DOCUKWIS YOU DON'T NEEDf TOTAL NUMBER OF COPIES REQUIRED:

LTTR 30 ENCL 30

CREST Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0. Box 165 New Hill, North Carolina 27562 JUNZ g itj8g.

File Number:

SHF/10-15505 Letter Number'HO-893025 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO+

1 DOCKET NO ~ 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1989.

Yours very truly, MWH:dj Enclosure R.

B. Richey Manager Harris Nuclear Project cc.'Messrs.

W. H. Bradford (NRC-SHNPP)

S.

D. Ebneter (NRC-RII)

R.

G. Oehl (DOE) 8906200035+ +90~/

PDR ADOCK 05000400 R

PDC MEM/DATAREPa/1/OS4

>pf

S

~

I e~

g

DOCKET NO 050-400 UNIT:

Harris Unit 1

DATE:

May 1989 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a 100.00 percent Availability Factor for the month of May with a

98.96 percent capacity factor.

There were four load reductions.

Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor vessel and 52 spent fuel assemblies in the Harris Unit 1 spent fuel pool and 0 assemblies in the new fuel pool.

MEM/DATAREPa/1/OS4

~,

CPl!ca CO I<Uih Dr".T'. 06/06/SI RUH TIME 5 ~: 33 '~

P.

T PERFORMAHCE DATA SYSTEM OPEIlATENG DATA Rr" PGt'T HARRIS-UNIT 5

PAGE RPD36-000 OPERATiHG STATUS DOCKET HO. 858-488 COMPLETED BY MARI( M.

HALE TELEPIfONE (959)362-25'44 UNIT NAME:

HARRIS UNIT 5

I 2.

REI ORTIHG PERIOD:

MAY 89 I

I JCEHSED TH RMAL POWFR (MMT): 2775 4.

NAMEPLATE RATING (GROSS MME): 958.9 I

5.

DESIGN ELL'CTRICAL RATIHG (HET MWE): 980.0 I

6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 I

7.

MAX DEPENDABLE CAPACITY (NET MME): 860.0

8. IF CHANGES OCCUR IH CAPACiTY RATINGS (ITEMS GIVE REASONS: N/A NOTES There are 157 fuel I

assemblies in the reactor and 52 spent assemblies in the spent fuel pool.

I I

I 3

THRU 7)

SINCE 'I AST REPORT, POMER LEVEL TG WHICH RESTRICTED IF AHY (HET MME)'one.

58.

REASONS FOR RESTRICTION IF ANY:

N/A THIS MrOHTH YR TO DATE CUMUL ATiVE 5 5; kIOURS IH REPGRTIHG PERIOD 52.

NUMBER OF HOURS REACTOR CRITICAL 53.

REACTOR RESERVi BHUTDOWH IIRB 54.

kIOUk(S GENERATOR OH LINE 55.

UNIT RESERVE SHUTDOWN HOURS 56.

GROSS THERIfAL EHERGY GEH.

(MMH) 57.

GROSS ELEC.

ENERGY GEH.

<MWH) 58.

HET ELEC.

EHERGY GiHERATED (MMH) f9. UNIT SERVJCE FACTOR 20.

UNIT AVAiLABILITYFACTOR 25.

UNIT CAP.

FACTOR (USING MDC HET) 22.

UNIT CAP.

FACTOR (USIHG DER HET) 23.

UNIT FORCED OUTAGE RATi 24.

SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS 744.08 744.00

.08 744.00

.80 2034683.28 6745'88.00 633589.08 500.88 508.80 5'8. 96 94.56

.80

<TYPE,

DATE, 3623.80 3545.20

.00 3582.65

.80 9333696.96 3554507.88 29525S5.08 96.68 5'6. 68 5'3. 47 Sc'7 5

.3.32 AHD DURATION 58264.00 54576.28

.00 542S6.S8

.00 37582360.82 52555054.00 55658585.80 78,22 7S.22 73.97 70.68 5.98 GF EACH):

  • Refueling Outage, November 11 th, 7 weeks.
25. IF SHUTDOWN AT EHD OF REPORT
PERIOD, ESTIMATED DATE OF START UP:

".6.

UHITS IH TEST STATUS (PRIOR TO COMMERCIAL OPiRATIOH):

FORECAST ACHIEVED IHITIAL CRiTICALITY IHITiAL ELECTRICITY CGMMEFCIAL OPERATION

  • NOTE:

CP&L Management will meet in the near future to discuss a new

'cheduled start date of October 21, 1989.

The outcome of the meeting will be reported in the June Report.

5

~ 56-

'9 MEM/DATAREPa/2/OS4

Cl"hlCO P'WT PERFORl'iANCE DATA SYSTEH-

~

RUQ DATE 06/06/89 APPEN~~~

B - AVERAGE DAILY POWER LEVEL~

RUN TME 12:33:00 HARRIS UNIT PAGE RPD39-000 HAY

<989 DOCKET NO. 050-400 COHPLETED BY NARIS W.

HALE TEI EPHONE (939)362-2944 DAY AVG. DAILY POWER I EVEL (MWE-NET)

DAY AVG. DAILY POWER LEVEL (AWE-NET) 866 18 860 865 882 20 22 24 857 851 812 720 822

$ 0

?5 852 f2 879 877 875 870 865 29 30 850 771 825

<.f6 - 8 MEM/DATAREPa/3/OS4

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

MAY 1989 DOCKET NO.:

050-400 UNIT NAME:

Harris DATE:

6/6/89 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944 No.

Date Tl y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report S

System Code 4

Component Code 5

Cause II, Corrective Action to Prevent Recurrence 89-014 890522 00 N/A MOTORX Turbine runback to 86$ power due to the loss of Heater Drain Pump "IA".

Investigation revealed the heater drain pump motor was shorted to ground on the "A" phase.

The motor was replaced and unit was returned to full load.

F:

Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training II, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Same Source MEM/DATAREPa/4/OS4

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

MAY 1989 DOCKET NO.:

050-400 UNIT NAME:

Harris DATE:

6/6/89 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944 No.

Date Tl y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report d System Code 4

Component Code 5

Cause 8 Corrective Action to Prevent Recurrence 89-015 890527 N/A PA Load reduced to 705 to isolate Electrical Bus ID2 due to a breaker failure on 1B Instrument Air Compressor.

The breaker was repaired and unit was restored to full load.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 4 License Examination F-Administrative G-Operational Error (Explain)

Hither (Explain)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 Same Source MEM/DATAREPa/5/OS4

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

MAY 1989 DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

050-400 Harris 6/6/89 M. W. Hale (919) 362-2944 U

[

~

~

No.

Date Tl y

P e

Duration (Hours)

R2 Method of Shutting Down Reactor3 Licensee Event Report S

System Code 4

Component Code 5

Cause 8, Corrective Action to Prevent Recurrence 89-016 890528 N/A VALVEX Load reduced to 70$ to perform turbine valve testing.

The required tests were completed and unit was returned to full power.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling 0-Regulatory Restriction E-Operator Training II, License Examination F-Administrative G&perational Error (Explain)

H-Other (Explain)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6&ther Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Source MEM/DATAREPa/6/OS4

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

MAY 1989 DOCKET NO.:

050-400 UNIT NAME:

Harris DATE:

6/6/89 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944

) 4 c

No.

Date Tl Y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report-f System Code 4

Component Code 5

Cause 8, Corrective Action to Prevent Recurrence 89-017 890531 00 N/A Load reduced to 855 to isolate Electrical Bus ID2 due to a breaker failure on 1B Instrument Air Compressor.

The breaker was replaced and unit was restored to full load.

The failed breaker will be sent to the vendor for evaluation and repair.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-OI61)

Exhibit I - Same Source MEM/DATAREPa/7/OS4