Proposed Tech Specs Re Gross Radioactivity Determination of Reactor Coolant Specific Activity
ML18005A903
Person / Time
Site: Harris 
Issue date: 05/05/1989
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18005A902 List:
References
NUDOCS 8905120195
Download: ML18005A903 (5)


Text

ENCLOSURE 4 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT REACTOR COOLANT SYSTEM SPECIFIC ACTIVITY TECHNICAL SPECIFICATION PAGES 8905120195 S90505 PDR ADOCK 05000400 P

PDC

TABLE 4.4-4 REACSOR COOLAHT SPECiriC ACT IVIIY SAHPLE AHFKIKYS15 PBOOBAH TYPE OF HEASUBEHEHT AHD AHALYSIS 1.

Dross Radioactivity De terminal i o~

2.

Isotopic Analysis for DOSE E(UIVA-LEHT 1-131 Concent,ration 3.

Rarliochemica) for E Determination 4.

Isotopic Analysis for Iorline including 1-131, 1-133, and 1-135 SAHPLE AHD AHAI.YSIS ERE UEHCY.

ht least once per 72 l>orrrs.

1 per 14 days.

1 per 6 mont.hs""

a.

Once per 4 Irorrrs, whenever tire specific activity exceerls I

IrCi/!Iram DOSE E(UIVALEHf 1-131 or 100/K irCI/gram of gross radioaclivily, and b.

One sample between 2

and 6 horrrs folinwirirj a TIIERHAL POWER change exceeding 15X of the BATED TIII:BIIAL POWER within a I-Irorrr peri orl.

DIODES 1H WIIICII SAMPLE

~h%g

<<L',

2, 3, 4

1 1N, 2N, 3N, 4N, 5N 1,2,3

~

g ~

TABLE 4. 4-4 Continued TABLE NOTATIONS le I

V C

I

~

4

~ ~

VV VV I

""Sample to be taken after a minimum of 2 EFPO and 20 have elapsed since reactor was last subcritical for

.-.Un il'he specific ac.ivity of the Reactor Coolant within >ts limits.

days of POMER OPERATION 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or longer.

System is restored SHEARON HARRIS - UNIT I 3/4 4-32