Monthly Operating Rept for Mar 1989 for Shearon Harris Unit 1
ML18005A863
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/31/1989
From: Hale M, Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-893008-(O), NUDOCS 8904250221
Download: ML18005A863 (12)


Text

. ACCELERATED I)ISTRIBUTION 'EMONSTRATION SYSTEM

.,REGULATORINFORMATION DISTRIBUTION +ITEM (RIDE) 4A'4'/3V

%&08ffh.:

N FACIL':50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION HALE,M.W.

Carolina Power

& Light Co.

RICHEY,R.B.

Carolina Power S Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

nth operating rept for Mar 1989 for Harris Unit 1.W/

89041 tr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR I ENCL /

SIZE:

7 TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed.

05000400 RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 R~

PB 10 REG FILE 01 EXTERNAL: EGSG SIMPSONFF LPDR NSIC COPIES LTTR ENCL 4

4 1

1 10 10 1

1 1

1 1

1 1

1 1

1l,l 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 EGGG WILLIAMSFS NRC PDR COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 D

R S

NOXE 'IO ALL "RIDS" RECIPZERIS:

PIZASE HELP US TO REDUCE HASTE!

CGNI'ACI'IHE DOCUMENT CXWZEKL DESK, RDCN Pl-37 (EXT. 20079)

KO ELXMZNAXR YOUR MME HKM DISTRIBUTION LISTS H3R DOCUMENIS YOU DGNFT NEEDf D

S TOTAL NUMBER OF COPIES REQUIRED:

LTTR 31 ENCL 31

v +

1 t'

Carolina Power & Light Company

'APR 141989 HARRIS NUCLEAR PROJECT P.

O.

Box 165 New Hill, North Carolina 27562 File Number:

SHF/10-15505 Letter Number.'O-893008 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NOe 50-400

-,LICENSE NO. NPF-63 MONTHLY'OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of March 1989.

Yours very truly, MWH:dj Enclosure R. B. Richey Manager Harris Nuclear Project cc:

Messrs.

W. H. Bradford (NRC-SHNPP)

- S.

D. Ebneter (NRC-RII)

R.

G. Oehl (DOE)

MEM/DATAREPa/1/OS4 I

1 0

r il r r-

~

l 4

'I

DOCKET NO ~ :

050-400 UNIT:

Harris Unit 1

DATE:

March 1989 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a 97.27 percent Availability Factor for the month of March with a 95.18 percent capacity factor.

There was one reactor trip, and two load reductions.

Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor vessel and 52 spent fuel assemblies in the Harris Unit 1 spent fuel pool and 0 assemblies in the new fuel pool.

tpoppg0221 8

pygmy mossy pgR ADOCK G pgg a

MEM/DATAREPa/2/OS4 (p~(

gF'b I.

CO

'DUN, DA'TE 84/01/89 RUN TIHE 18:17:29 Pl AHT PFRFGRHAHCE DATA 8~EH OPERATING DATA REI>>ORM I-IARR IS UNlT 1

PAGE RPD36-00(

OPERATING STATUS I

DGCI<ET HG. 058-400 CQHF'LETED BY HARI<

W ~

I-IALE TEL.EF'I-)ONE

< 91 9) 362-2944 UHIT NAHE:

IHARRXB LJNTT 1

2.

REPORTIHG PERIOD:

HARCI-I 89 3

LICEHBED TI.IERHAL POWER (HWT): 277 4.

HAHEPI ATE RATXNG (GROSS HWE>: 950.9 5.

DESTGN ELECTRICAL RATING (NET HWE): 908.8 6.

HAX DEPENDABLE CAPACTTY (GROSS HME): 928.0 7.

HAX DEPEHDABI E CAF'ACITY <NET HWE): 860.0 8.

XF CHANGES OCCUR IN CAPACITY RATINGS

( ITEHB GXVE REASQHS:

N/A NOTES I

IThere are 157 fuel assemblies in lthe reactor and 52 spent fuel I

lassemblies in the spent fuel pool.

I I

I I

3 THOU 7 >

SINCE LAST REPORT, I GWEI'4 L.EVEL TO WIHXCIH RESTRICTED XF ANY (NET HWE): None 10.

REASGHS FOR RESTRICTION XF ANY:

N/p, THIS HQNTI-I Yl'< TQ DATE CLJHUL ATIVE 11.

2

  • 13.

14.

I >*

16.

17.

18.

19.

28.

21 *

.l':>

A k

  • 23.

Ij4 IIOURS IN REPORTIHG PERIOD HLJHBER OF HOURS REACTOR CRITICAL REACTOR RES>ERVE Sl-IUTDOWN I-IRS IIQURS GENERATOR ON LlNE IJNIT RESERVE Bl-IUTDOMN I-IOURS GROSS TIHERHAL ENERGY GEH.

( HWIS )

GROSS ELEC.

ENERGY GEN.

(HWI-I)

NI=T El EC.

ENERGY GENERATED (HMH)

LJN:I:T SERVICE FACTOR UNXT AVAlLABlLITYFACTOR IJNIT CAP.

FACTOR (USING" HDC NET)

LJNIT CAP.

FACTOR (USING DER NET>

UNIT FORCED OUTAGE RATE Sl-IIJTDQWHS BCI-II='D. OVER NEXT 6 H()HTHS 744.88 727.08

.80 723 k 72

.00 1948216.50 651039.00 688978.00 97.27 97.27 95.18 90.95 2.73 (TYPE,

DATE, 2160.00 2078.20

.80 2039.65

.e0 5360087.88 179 766.ee 1672493.00 94.43 94.43 90.04 86.03 5 *.>7 AHD DURATION 16881.00 13113.20

.08 12823.88

.ee 33688750.94 11193273.08 18378889.08 76.33 76.33 71.83 68.64 6.62 OF EACI-I):

25.

IF SHUTDOWN AT END QF REPORT F'ERIOD, EBTIHATED DATE OF START UF':

'>6.

UNITS IN TEST STATUS (PRIOR TQ COHHI=RCIAL OPERATION ):

FORECAST ACHIEVED lNITIAL CRITICALITY INITIAL El ECTRlCITY COHHERCI AI OPERATION MEM/DATAREPa/3/OS4 1.16 9

d

.r.PXL CO

~ PLANT PERFORHANCE DATA 8~EH

'UN DA'TE 04/O'I /89 4%ENDIX B AVERAGE DAII Y P&R LEVEL RUN TIME 10: 17: 28 I-IARRXS UNXT PAGE RPDS9-ee<

HARCI.I DAY AVG. DAILY POWER LEVEI

<HWE-NET)

DOCI<ET NO. 050-400 COMPLETED BY HARI< W.

I-IAL-TELEPHONE (939)362-2944 DAY AVG. DALI.Y POWER LEVEI (HWF-NET).

88287'80 888

.)7 867.

8se 857 851 MEM/DATAREPa/4/OS4

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

MARCH 1989 DOCKET NO.:

050-400 UNIT NAME:

Harris DATE:

4/6/89 COMPLETED BY M

W Hale TELEPHONE:

(919) 362-2944 Date Tl y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report if System Code 4

Component Code 5

Cause 8, Corrective

~

Action to Prevent Recurrence 89~9 890314 20.28 89-006 AB PUMPXX Reactor Trip from full power due to Low-Low Steam Generator Level caused by the loss of IB Main Feed pump.

The Main Feed pump tripped due to being accidentally sprayed with fire deluge water after Fire Protection System test restoration.

The unit was returned to 505 using A

Feedwater Train and repairs were implemented.

I F:

Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling 0-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6&ther 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I Same Source

" Corrective action to prevent recurrence per the Licensee Event Report.