ML18005A799
| ML18005A799 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/01/1989 |
| From: | Decker T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18005A800 | List: |
| References | |
| NUDOCS 8903140051 | |
| Download: ML18005A799 (4) | |
See also: IR 05000400/1989005
Text
p,g Cg~ W'TED
D]PTRIBU73 ON
DE M04 iTRATl04
SYs IEM
f
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8903140051
DOC.DATE: 89/03/01
NOTARIZED: NO
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina
AUTH.NAME
AUTHOR AFFILIATION
DECKER,T.R.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power
& Light Co..
DOCKET
05000400
NOTES:Application for permit renewal filed.
05000400
SUBJECT: Forwards Insp Rept 50-400/89-05
on 890206-10.No violations
or deviations
noted.'ISTRIBUTION
CODE:
IE06D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: Environ
& Radiological
(50 DKT)-Insp Rept/Notice of Violation Respons
D
l
RECIPIENT
ID CODE/NAME
PD2-1 LA
BECKER,D
'NTERNAL'CRS
NMSS/LLOB
5E4
NRR/DLPQ/PEB ll
NRR/DREP/EPB
10
NRR/PMAS/ILRB12
OGC/HDS 1
RGN2
FILE
01
RGN4 MURRAY,B
EXTERNAL
EG&G S IMPSON i F
NRC PDR
COPIES
LTTR ENCL
1
0
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
1
1
RECIPIENT
ID CODE/NAME
PD2-1
AEOD/DSP
NMSS/SGDB
4E4
NRR/DOEA/EAB 11
NRR/DREP/RPB
10
NUDOCS-ABSTRACT
EG FI3>E~~
GN2
DRSS/RPB
RGN2 COLLINS,D
LPDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
2
2
1
1
1
1
2
2
1
1
1
1
1
1
D
S
R
I
D
S
A
NIXIE 'IO ALL "RIDS" RECIPIENIS:
PLEASE HELP US '10 RECCE WASTE!
CONI'ACT 'IHE DOCUMER1'DN'IDOL DESK
ROCN Pl-37
(EZI'. 20079) K) ELIMINATEKSR NAME FR% DIBTICBVTION
LISTS FOR DOCUMENIS YOU DON'T NEED)
D
S
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
28
ENCL
27
Docket No. 50-400
License
No.
Carolina
Power
and Light Company
ATTN:
Nr.
E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
NRC INSPECTION
REPORT 50-400/89-05
This refers to the Nuclear Regulatory
Commission
(NRC) inspe'ction
conducted
by
C.
H. Bassett
on February
6-10,
1989.
The inspection
included
a review of
activities authorized for your Shearon
Harris facility.
At the conclusion of
the inspection,
the findings were discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Within the
scope
of the
inspection,
no violations
or deviations
were
identified.
In accordance
with Section 2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning
this letter, please
contact us.
Sincerely,
Enclosure:
(See
page
2)
Thomas
R. Decker, Acting Chief
Emergency
Preparedness
and
Radiological Protection
Branch
Division of Radiation Safety
and Safeguards
Carolina
Power
and Light Company
Enclosure:
NRC Inspection
Report
cc w/encl:
R. A. Watson,
Vice President
Harris Nuclear Project
D. L. Tibbitts, Director of Regulatory
Compliance
C.
S. Hinnant, Plant General
Hanager
State of North Carolina
bcc w/encl:
C. Barth,
NRC Resident
Inspector
A. Upchurch,
Chairman, Triangle J
Council of Governments
DRS Technical Assistant
Document Control
Desk
RII
RII
RII
CBassett
JPo<ter
HDance
2/~89
2/W/89
2/g89