ML18005A728
| ML18005A728 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/30/1988 |
| From: | Hale M, Watson R CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8812200117 | |
| Download: ML18005A728 (8) | |
Text
AC'CELE RATED DISTI+3UTION DEMONSTRA'N SYSI'EM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 8812200117 DOC. DATE: 88/11/30 NOTARIZED-NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.W.
Carolina Power
& Light Co.
WATSON,R.A.
Carolina Power
& Light Co.
, RECIP.NAME RECIPIENT AFFILIATION DOCKET g
05000400
SUBJECT:
Monthly operating rept for Nov 1988 for Harris Nuclear Proj Dept Unit 1.W/881215 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Spec
)
NOTES:Application for permit renewal filed.
8 05000400 RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY,B INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 1 1 NRR/D 10 E
EXTERNAL: EG&G SIMPSON, F LPDR NSIC COPIES LTTR ENCL 1
0 1
0 10, 10 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA ARM TECH ADV NRR/DOEA/EAB ll NUDOCS-ABSTRACT RGN2 EG&G WILLIAMS,S NRC PDR COPIES LTTR ENCL 5
1 1
2 2
1 1
1 1
1 1
1 1
1 1
R I
h NOTE LO ALL "RIDS" RECIPIEtGS'IZASE HELP US TO REIXICE WASTE CXRVACT IHE
'XÃHVLDESKi ROOM Pl-37 (EXT. 20079)
TO EIZKENATE YOUR NAME FMM DISTBIK7ZIGN LISTS H)R DOCKMWIS YOU DGNiT NEEDt TOTAL NUMBER OF COPIES REQUIRED:
LTTR 32 ENCL 30
CF'i.L CO RUH D*TE f2/06/88 RUN TIHF i3:ip:08
'LANT F'ERFGRHANCE D*TA SYS A
~
~
OPERATIHG DATA REF'ORT I-IARRI S IJt< IT F'AGE RF'D36-000 GF'ERATXHG STATlJS DOCI< ET t<O.
O50-400 CONF'LETED BY HARV. M.
HALE TELEF'HONF (5"i 5') 362-2944
- k 5
6.
7.
8.
UNIT NAHE:
HARRIS UHIT REPORTING F'ERXOD:
NOVEMBER 88 LICENSED THERYiAL F'OWER
( HWT): 2775 tIAHEPLATE RATING (GROSS AWE): 5'50.'9 DESIGH ELECTRICAL RATING (HET IRME): 5'00. 0 YiAX DEF'EHDABLE CAF'ACITY
( GROSS HWE): 920. 0 YiAX DEF'EHDABLE CAF'ACITY
( HET HWE): 860. 0 IF CHAHGES OCCUR 1H CAF'ACITY RATXHGS
( ITEHS GIVE REASONS: N/A I
NOTES I
I There are 157 fuel assemblies in I
I the reactor and 52 spent fuel I
I assemblies in the spent fuel pool.I I
I I
I 3
Tl-IRU 7)
BIHCE LAST REPORT, 9.
ie.
F'OWER LEVEL TO WHICH RESTRICTED IF AHY (HET tIME):
NONE REASONS FOR RESTRICTION IF At<Y:
N/A THIS YiOt<TIH YR TG DATE CUPFUL ATIVE k
$ 3.
i4.
i5.
16.
17.
i8.
f9.
.>0 2 i 4
~
4 23.
I-IOURS 1H REF'ORTIHG F'ER IGD HUHBER OF I-IOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOMH I-IRS HOURS GENERATOR OH LIHE UNIT RESERVE Sl-IUTDOMH HOURS GROSS THERHAL EHERGY GEH
( HWIH )
GROSS ELEC.
EHERGY GEH.
(HMH)
HET ELEC.
ENERGY GENERATED (HMH)
UNIT SERVICE FACTOR UHIT AVAILABIL1TYFACTOR UNIT CAF'.
FACTOR (USING t1DC HET )
UHIT CAF'.
FACTOR (UBIHG DER HET)
UNIT FORCED OUTAGE RATE SHUTDOWNS SCHED.
OVER HEXT 6 tlGNTHS Maintenance, 12/14/88, 4~g days 720.00 720.00
.00 706.68
.00
$ 904147.28 642l79.00 601949.00 5'8. i 5 5'8. f5 5'7. 2$
5'2. 89 1.85 (TYPE,
- DATE, 8040.00 5939.34
.00 5823.73
.00 15375688.92 5351503.00 4783190.00 72.43 72.43 69.$ 8 66.le 4.68 AHD DURATIGH f 385'7. 00 18389.23
.00
)0347.33
.00 26525834.28 88)6735'.00 8362019.00 73.82 73.02 68.
25'5.26 7
~ k 2 OF EACH):
25 4 IF BHUTDGMH AT EHD OF REF'GRT F'ERXOD, ESTIMATED DATE OF START UF':12/19/88 UH1TS IH TEST STATUS (F'RIOR TQ COHHERCXAL OF'ERAT1QH):
FORECAST ACHIEVED IHITIAL CRITICALITY INITIAL ELECTRICITY COYitIERCIAL GF'ERAT.OH 88i2200ii7 83ii30.
PDR ADOCK 0>000400 PDC HEN/DATAREPa/2/081
P4 V
C, p
1"l
,'PhL OO AHT F'ERFORHANCE DATA SYS RUH DATE 32/06/88 APPEHDlX B
AVERAGE DAILY F'OWER LEVEL RUH TINE
<3: 30:07 HARRIS UNIT F'AGE RPD39-000 NOVEMBER 1988 DOCKET HO ~ 050-400 COMPLETED BY HARK W.
HALE TELEPHONE (939)362-2944 DAY AVE DAILY POWER LEVEL (HWE-NET)
DAY AVG. DAILY F'OWER LEVEL (HWE-HET) 17 625 38 20 889 869 882 881 867 880
.)7 886 890 889 883
".)9 30 870 MEM/DATAREPa/3/OSl
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
NOVEMBER 1988 DOCKET NO,:
050-400 UNIT NAME.
Harris DATE:
12/6/88 COMPLETED BY:
M, W. Hale TELEPHONE:
(919) 362-2944 No.
Date Duration (Hours)
R Method of Shutting Down Reactor Licensee Event Report f System Code 4
Component Code 5
Cause II, Corrective "
Action to Prevent Recurrence 88-025 881030 13,32 88-032 HH PumpXX Manual reactor trip from 98$ power due to loss of normal feedwater caused by the loss of IB heater drain pump.
The loss of the heater drain pump caused a
turbine runback to 50'oad, While the reacTor power was being reduced to match turbine load, IB condensate booster pump tripped followed by a loss of both main feed pumps.
The loss of the IB heater drain pump was caused by debris in the 3A feedwater heater (left by previous maintenance activities).
The debris was removed and ihe unit was returned to service F:
Forced S:
Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit I - Same Source
" Corrective action to prevent recurrence as per the License Event Report
Carolina Power 8 Light Company HARRIS NUCLEAR PROJECT P.
O. Box 165 New Hill, North Carolina 27562 iOEC ig)999 File Number'.
SHF/10-15505 Letter Number.
HO-880244 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, D.C.
20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT Dear Sirs'.
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power
& Light Company herewith submits the report of operation statistics and shutdown experience for the month of November 1988.
Yours very truly, MWH:dj Enclosure R. A. Watson Vice President Harris Nuclear Project cc:
Messrs.
W. H. Bradford (NRC-SHNPP)
M. L. Ernst (NRC-RII)
R.
G. Oehl (DOE)
J.
M. Taylor (NRC)
MEM/MoOperRep/1/OS1
~ '
A r,
'E
'P I
DOCKET NO 050-400 UNIT:
Harris Unit 1
DATE:
November 1988 COMPLETED BY:
Mark Hale OPERATIONS
SUMMARY
Harris Unit 1 operated at a 98.15 percent Availability Factor for the month of November with a 97.21 percent capacity factor.
There was 1 continued off-line outage.
Details are provided on the Unit Shutdowns and Power Reduction Sheet.
There are 157 fuel assemblies in the reactor vessel and 52 spent fuel assemblies in the Harris Unit 1 spent fuel pool and 0 assemblies in the new fuel pool.
MEM/DATAREPa/1/OS1