Monthly Operating Rept for Oct 1988 for Harris Unit 1. W/881115 Ltr
ML18005A703
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/31/1988
From: Hale M, Watson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
HO-880231-(O), NUDOCS 8811210321
Download: ML18005A703 (19)


Text

. '.CCE1ZRAYED D1 BU'EON DEMON STR TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8811210321 DOC.DATE: 8~8 NOTARIZED: NO DOCKET g FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION HALE,M.W. Carolina Power & Light.Co.

WATSON,W.A. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

M o crating rept for Oct 1988 for Harris Unit 1.

/881115 tr.

DISTRIBUTI N C~O: IE24D COPIES RECEIVED:LTR Q ENCL TITLE: Monthly Operating Report (per Tech Specs) g SIZE:

8 NOTES:Application for permit renewal filed.

05000400'ECIPIENT p

COPIES RECIPIENT COPIES ID CODE/NAME 'LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1, 0 PD2-1 PD 5 5 BUCKLEY,B 1 0 XNTERNAL: ACRS 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 ARM TECH ADV 2 2 NRR/DLPQ/PEB 1'1 1 NRR/DOEA/EAB 11 , 1 1 NRR/DREP/RPB 10 1 NUDOCS-ABSTRACT 1 1 RE Xb 01 1 RGN2 1 1 EXTERNAL: EG&G SIMPSON,F .1 1 EG&G WILLIAMS,S 1 1 LPDR 1 1, NRC PDR 1 1 NSIC 1 1 1/

h D

NOTE TO ALL "RIDS" RECIPZERIS'IEASE S

HELP US 'Io REHJCE WASTE.'ONZACZ 'IHE DOCUMEPZ CONSOL DESK, ROOM Pl-37 (EXT. 20079) KO EZJMH%QK WAR NME FRM DISTEGHUTIQN LISTS POR DOCEGWZS YOU DGN~T NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 32 ENCL 30 HR

Cf"'ll, CQ PLANT PERFORMANCE DATA S iEM PAGE RUN DATE 11/83/88 OPERATING DATA REPORT RPD36-880 RUH TIME 16:19:44 HARRIS UNIT 1 DOCKET HG. 050-400 COMPLETED BY MARK W. H*LE OPERATING STATUS TELEPHONE <919)362-2944 UNIT NAME: HARR1S UNIT I NOTES I 2 k REPORT IHG PERIOD: OCTOBER 88 POWER ASCENSION TESTS IN PROGRESS 3 4 LICENSED THERMAL POWER <MMT): 2775 I WITH 157 FUEL ASSEMBLIES IN THE I 4, HAMEPLATE RATING (GROSS MME): 958.9 I REACTOR AND 52 SPENT FUEL ."  :

54 DESIGN ELECTRICAL RATING (NET MWE): 980.0 I ASSEMBLIES IN THE SPENT FUEL POOL.I

6. MAX DEPENDABLE CAPACITY (GROSS MME): 920.0 I I
7. MAX DEPENDABLE CAPACITY <NET MWE): 860.8 8~ IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 Tl-IRU 7> S1HCE LAST REPORT, GIVE REASONS: N/A PQWER LEVEL TO WHlCH RESTRICTED IF AHY (HET MWE >: NONE
10. REASONS FGR RESTRICTION IF ANY: N/A THlS YR TO CUMUL MONTH D*TE ATIVE I.IQURS IN REPORTlNG F'ERIOD 745.08 7328.80 13177.08 HUMBER OF I-IOURS REACTOR CRITICAL 341.69 5219.34 9669.23
13. REACTOR RESERVE SHUTDOMH HRS .00 .00 .00
14. HOURS GENERATOR OH LINE 252.00 5117.05 9440.65
15. UNIT RESERVE SHUTDQWN HOURS .00 .00 .00
16. GROSS THERMAL EHERGY GEH. (MWH) 365154.48 13471541.64 24621687.80
17. GROSS ELEC. ENERGY GEN. (MWH) 112433.ee 4589322.88 8174540.00
18. HET ELEC. EHERGY GENERATED (MMH) 84486.00 4181241.00 7560870.00
19. UNIT SERVICE FACTOR 33.83 69.91 71.64

.>0 UHlT AVAILABIIITY FACTOR 33.83 69.91 71.64 21, UNIT CAP. FACTOR USIHG MDC NET)

< 13.19 66.42 66.71 UNIT CAP. FACTOR (USIHG DER HET) 12.68 63.47 63.75 23 UNIT FORCED OUTAGE RATE 21.94 5.05 7.59

'14 Sl-IUTDOWNS SCI-IED. OVER NEXT 6 MGHTHS (TYPE, DATE, AND DURATION OF EACH>:

IF SHUTDOWN *T EHD GF REPORT PERIOD, ESTIMATFD DATE OF ST*RT UP: 11/1/88

26. UHITB IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY IN lTIAL ELECTRICITY COMMERCIAL OPERATION 88ii2i032i SSi03i ADOCK 05000400 PDR R PDC MEM/DATAREPa/2/OS1

s i ~

t

~

N i 1

"r

CPKL CO PLANT PERFORMANCE DATA S EM PAGE RUN DATE 11/03/88 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN HARRIS UNIT DOCKET NO. 050-400 COMPLETED BY MARK W. HALE TELEPHONE (939)362-2944 OCTOBER 1988 DAY AVG. DAII Y POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 172 127 23 .) 4 146 30

-38 708 30 637 16 1.36 8 MEM/DATAREPa/3/OS 1

  • ~ r 2

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: Harris DATE: 11/4/88 ~

COMPLETED BY: M W. Hale TELEPHONE: (919) 362-2944 a

REPORT MONTH: OCTOBER 1988 Tl R Method No. Date y Duration of Licensee System Component Cause 8, Corrective "

P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report f Prevent Recurrence Reactor 88"017 880730 00 N/A ZZ ZZZZZZ Refueling outage completed and unit In preparation for fuel cycle P2 Power Ascension Testing.

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training II, License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

" Corrective action to prevent recurrence as per the License Event Report

h

  • "I a e

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO: 050-400 UNIT NAME: Harris DATE: 11/4/88 COMPLETED BY: M. W. Hale TELEPHONE: (919)

REPORT MONTH: OCTOBER 1988 362-2944'o.

Ti R Method Duration of Licensee System Component Cause E, Corrective Date y P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report /f Prevent Recurrence Reactor 88"018 881014 00 N/A ZZ ZZZZZZ Unit operating at'educed load to perform reactor physics and low power tests.

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E&perator Training 8, License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit 1

- Same Source H-Other (Explain )

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: Harris DATE: 11/4/88 COMPLETED BY: M. W. Hale TELEPHONE: (919) 362-2944 REPORT MONTH: OCTOBER 1988 T' R Method No, Date Duration of Licensee System Component Cause II, Corrective "

P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report P Prevent Recurrence Reactor 88-019 881014 41,38 88-028 HH INSTRU Manual reactor trip from 14/ power due to loss of normal feedwater, The operating IB Condensate pump tripped on low discharge pressure due to low level in the condenser hot well and caused an automatic trip of the IB condensate booster pump. The low hot well was due to a discrepancy between the main control board indicated level and the actual level. The discrepancy was corrected and the unit was returned to service.

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training 4 License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

" Corrective action to prevent recurrence as per the License Event Report

I UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: Harris DATE: 11/4/88 COMPLETED BY: M. W. Hale TELEPHONE: (919) 362-2944 REPORT MONTH: OCTOBER 1988 Tl R Method No. Date Duration of Licensee System Component Cause 8, Corrective y

P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report S Prevent Recurrence Reactor 88-020 881016 00 N/A ZZ ZZZZZZ Unit operating at reduced load for fuel cycle 2 power ascension testing.

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NVREG-0161)

E-Operator Training I License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit 1 Same Source H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: Harris DATE: 11/4/88 COMPLETED BY: M. W. Hale TELEPHONE: (919)

REPORT MONTH: OCTOBER 1988 362-2944'o.

Tl R Method Date Duration of Licensee System Component Cause II, Corrective y

P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report f Prevent Recurrence Reactor 88-021 881018 N/A ZZ ZZZZZZ Unit off-line due to performance of turbine mechanical overspeed trip test. The required test was performed satisfactorily. Unit was returned to service.

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment'ailure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161 )

E-Operator Training II, License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO '50-400 UNIT NAME: Harris DATE: 11/4/88 COMPLETED BY: M. W. Hale TELEPHONE: (919) 362-2944 REPORT MONTH: OCTOBER 1988 R Method No. Date Duration of Licensee System Component Cause 4 Corrective (Hours) Shutting Event Code 4 Code 5 Action to Down Report l Prevent Recurrence Reactor 88-022 881019 00 N/A ZZ ZZZZZZ Unit operating at-reduced load for fuel cycle 2 power ascension testing.

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training 6, License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit I Same Source H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: Harris DATE: 11/4/88 COMPLETED BY: M, W. Hale TELEPHONE: (919) 362-2944 REPORT MONTH: OCTOBER 1988 Tl R Method No. Date Duration of Licensee System Component Cause & Corrective y

P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report S Prevent Recurrence Reactor 88-023 881020 00 N/A HA VALVEX Unit removed from service to replace main turbine governor valves fl & f2 due to valves binding during stroke testing, Inspection of the valves after removal indicated that the valves binding was due to pressure seal ring clearances.

Governor valves fi & P2 were replaced with new refurbished valves, The unit was returned to service.

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit I Same Source H-Other (Explain )

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO : 050-400 UNIT NAME: Harris ~

DATE: 11/4/88 COMPLETED BY: M. W. Hale TELEPHONE: (919)

REPORT MONTH: OCTOBER 1988 362-2944'o, Tl R Method Date Duration of Licensee System Component Cause 8, Corrective y

p (Hours) Shutting Event Code 4 Code 5 Action to e Down Report f Prevent Recurrence Reactor 88-024 881024 00 N/A ZZ ZZZZZZ Unit operating at reduced load for fuel cycle 2 power ascension testing, F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training 8, License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit 1

- Same Source H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO : 050-400 UNIT NAME: Harris DATE: 11/4/88 COMPLETED BYi M W Hale TELEPHONE: (919) 362-2944 REPORT MONTH: OCTOBER 1988 Tl R Method No, Date y Duration of Licensee System Component Cause 8, Corrective "

P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report S Prevent Recurrence Reactor 88-025 881030 29,45 88-032 HH PUMPXX Manual reactor trip from 98$ power due to loss of normal feedwater caused by the loss of IB heater drain pump, The loss of the heater drain pump caused a turbine runback to 50$

load. While the reactor power was being reduced to match turbine load, IB condensate booster pump tripped followed by a loss of both main feed puf!ipse The loss of the 1B heater drain pump was caused by debris in the 3A feedwater heater (left by previous maintenance activities), The debris was removed and the unit was returned to service.

F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training II License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit I Same Source H-Other (Explain)

" Corrective action to prevent recurrence as per the License Event Report

DOCKET NO.: 050-400 UNIT: Harris Unit 1 DATE: October 1988 COMPLETED BY: Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a 33.83 percent Availability Factor for the month of October with a 13.19 percent capacity factor. There was 1 continued off-line outage, 4 reduced load events, 2 manual reactor trips and 2 off-line events.

Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor vessel and 52 spent fuel assemblies in the Harris Unit 1 spent fuel pool and 0 assemblies in the new fuel pool.

Fuel reload is completed and 52 assemblies will remain in the Harris Unit 1 spent fuel pool for storage.

MEM/DATAREPa/1/OS1

?

4I ~

' t CSKIN Carolina Power & Light Company

~ ~

NOV 15 1988 HARRIS NUCLEAR PROJECT P. O. Box 165 New Hill, North Carolina 27562 File Number'. SHF/10-15505 Letter Number'HO-880231 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of October 1988.

Yours very truly, R. A. Watson Vice President Harris Nuclear Project MWH:crc Enclosure cc: Messrs. W. H. Bradford (NRC-SHNPP)

M. L. Ernst (NRC-RII)

R. G. Oehl (DOE)

J. M. Taylor (NRC)

MEM/MoOperRep/1/OS1