ML18005A703

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1988 for Harris Unit 1
ML18005A703
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/31/1988
From: Hale M, Watson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
HO-880231-(O), NUDOCS 8811210321
Download: ML18005A703 (19)


Text

. '.CCE1ZRAYED D1 BU'EON DEMONSTR TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8811210321 DOC.DATE:

8~8 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.W.

Carolina Power

& Light.Co.

WATSON,W.A.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET g

05000400

SUBJECT:

M o crating rept for Oct 1988 for Harris Unit 1.

/881115 tr.

DISTRIBUTI N C~O:

IE24D COPIES RECEIVED:LTR Q ENCL g SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed.

8 05000400'ECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY,B XNTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 1'1 NRR/DREP/RPB 10 RE Xb 01 EXTERNAL: EG&G SIMPSON,F LPDR NSIC COPIES

'LTTR ENCL 1,

0 1

0 10 1

1 1

1

.1 1

1 1,

1 1

RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 EG&G WILLIAMS,S NRC PDR p

COPIES LTTR ENCL 5

5 1

1 2

2

, 1 1

1 1

1 1

1 1

1 1

1/

h NOTE TO ALL "RIDS" RECIPZERIS'IEASE HELP US 'Io REHJCE WASTE.'ONZACZ 'IHE DOCUMEPZ CONSOL DESK, ROOM Pl-37 (EXT. 20079)

KO EZJMH%QK WAR NME FRM DISTEGHUTIQN LISTS POR DOCEGWZS YOU DGN~T NEED)

D S

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 32 ENCL 30 HR

Cf"'ll, CQ RUN DATE 11/83/88 RUH TIME 16:19:44 PLANT PERFORMANCE DATA S iEM OPERATING DATA REPORT HARRIS UNIT 1

PAGE RPD36-880 OPERATING STATUS DOCKET HG. 050-400 COMPLETED BY MARK W.

H*LE TELEPHONE

<919)362-2944 2 k 3 4 4,

5 4 6.

7.

8 ~

UNIT NAME:

HARR1S UNIT REPORT IHG PERIOD:

OCTOBER 88 LICENSED THERMAL POWER

<MMT): 2775 HAMEPLATE RATING (GROSS MME): 958.9 DESIGN ELECTRICAL RATING (NET MWE): 980.0 MAX DEPENDABLE CAPACITY (GROSS MME): 920.0 MAX DEPENDABLE CAPACITY <NET MWE): 860.8 IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS GIVE REASONS:

N/A I

NOTES I

POWER ASCENSION TESTS IN PROGRESS I

WITH 157 FUEL ASSEMBLIES IN THE I

I REACTOR AND 52 SPENT FUEL."

I ASSEMBLIES IN THE SPENT FUEL POOL.I I

I 3

Tl-IRU 7>

S1HCE LAST REPORT, 10.

PQWER LEVEL TO WHlCH RESTRICTED IF AHY (HET MWE >:

NONE REASONS FGR RESTRICTION IF ANY: N/A THlS MONTH YR TO D*TE CUMUL ATIVE 13.

14.

15.

16.

17.

18.

19.

.>0 21, 23

'14 I.IQURS IN REPORTlNG F'ERIOD HUMBER OF I-IOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOMH HRS HOURS GENERATOR OH LINE UNIT RESERVE SHUTDQWN HOURS GROSS THERMAL EHERGY GEH.

(MWH)

GROSS ELEC.

ENERGY GEN.

(MWH)

HET ELEC.

EHERGY GENERATED (MMH)

UNIT SERVICE FACTOR UHlT AVAILABIIITY FACTOR UNIT CAP.

FACTOR

< USIHG MDC NET)

UNIT CAP.

FACTOR (USIHG DER HET)

UNIT FORCED OUTAGE RATE Sl-IUTDOWNS SCI-IED.

OVER NEXT 6 MGHTHS 745.08 341.69

.00 252.00

.00 365154.48 112433.ee 84486.00 33.83 33.83 13.19 12.68 21.94 (TYPE,

DATE, 7328.80 5219.34

.00 5117.05

.00 13471541.64 4589322.88 4181241.00 69.91 69.91 66.42 63.47 5.05 AND DURATION 13177.08 9669.23

.00 9440.65

.00 24621687.80 8174540.00 7560870.00 71.64 71.64 66.71 63.75 7.59 OF EACH>:

26.

IF SHUTDOWN *T EHD GF REPORT

PERIOD, ESTIMATFD DATE OF ST*RT UP:

11/1/88 UHITB IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INlTIAL ELECTRICITY COMMERCIAL OPERATION 88ii2i032i SSi03i PDR ADOCK 05000400 R

PDC MEM/DATAREPa/2/OS1

t s

~

i

~

N i

1 "r

CPKL CO PLANT PERFORMANCE DATA S EM RUN DATE 11/03/88 APPENDIX B AVERAGE DAILY POWER LEVEL RUN HARRIS UNIT PAGE RPD39-000 OCTOBER 1988 DAY AVG. DAII Y POWER LEVEL (MWE-NET)

DOCKET NO. 050-400 COMPLETED BY MARK W.

HALE TELEPHONE (939)362-2944 DAY AVG. DAILY POWER LEVEL (MWE-NET) 172 127 23

.)4 30

-38 146 30 708 637 16 1.36 8

MEM/DATAREPa/3/OS 1

~

r 2

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

OCTOBER 1988 DOCKET NO,:

050-400 UNIT NAME:

Harris DATE:

11/4/88

~

COMPLETED BY:

M W. Hale TELEPHONE:

(919) 362-2944 a

No.

Date Tl y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report f System Code 4

Component Code 5

Cause 8, Corrective "

Action to Prevent Recurrence 88"017 880730 00 N/A ZZ ZZZZZZ Refueling outage completed and unit In preparation for fuel cycle P2 Power Ascension Testing.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training II, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Source

" Corrective action to prevent recurrence as per the License Event Report

h "I a e

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

OCTOBER 1988 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

050-400 Harris 11/4/88 M. W. Hale (919) 362-2944'o.

Date Ti y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report /f System Code 4

Component Code 5

Cause E, Corrective Action to Prevent Recurrence 88"018 881014 00 N/A ZZ ZZZZZZ Unit operating at'educed load to perform reactor physics and low power tests.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training 8, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain )

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

OCTOBER 1988 DOCKET NO,:

050-400 UNIT NAME:

Harris DATE:

11/4/88 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944 No, Date T'

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report P

System Code 4

Component Code 5

Cause II, Corrective "

Action to Prevent Recurrence 88-019 881014 41,38 88-028 HH INSTRU Manual reactor trip from 14/ power due to loss of normal feedwater, The operating IB Condensate pump tripped on low discharge pressure due to low level in the condenser hot well and caused an automatic trip of the IB condensate booster pump.

The low hot well was due to a discrepancy between the main control board indicated level and the actual level.

The discrepancy was corrected and the unit was returned to service.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 4 License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Source

" Corrective action to prevent recurrence as per the License Event Report

I

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

OCTOBER 1988 DOCKET NO,:

050-400 UNIT NAME:

Harris DATE:

11/4/88 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944 No.

Date Tl y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report S

System Code 4

Component Code 5

Cause 8, Corrective Action to Prevent Recurrence 88-020 881016 00 N/A ZZ ZZZZZZ Unit operating at reduced load for fuel cycle 2 power ascension testing.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training I License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NVREG-0161)

Exhibit 1

Same Source

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

OCTOBER 1988 DOCKET NO,:

050-400 UNIT NAME:

Harris DATE:

11/4/88 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944'o.

Date Tl y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report f System Code 4

Component Code 5

Cause II, Corrective Action to Prevent Recurrence 88-021 881018 N/A ZZ ZZZZZZ Unit off-line due to performance of turbine mechanical overspeed trip test.

The required test was performed satisfactorily.

Unit was returned to service.

F:

Forced S:

Scheduled Reason:

A-Equipment'ailure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training II, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161 )

Exhibit I - Same Source

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

OCTOBER 1988 DOCKET NO '50-400 UNIT NAME:

Harris DATE:

11/4/88 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944 No.

Date Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report l System Code 4

Component Code 5

Cause 4 Corrective Action to Prevent Recurrence 88-022 881019 00 N/A ZZ ZZZZZZ Unit operating at-reduced load for fuel cycle 2 power ascension testing.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 6, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I Same Source

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

OCTOBER 1988 DOCKET NO,:

050-400 UNIT NAME:

Harris DATE:

11/4/88 COMPLETED BY:

M, W. Hale TELEPHONE:

(919) 362-2944 No.

Date Tl y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report S

System Code 4

Component Code 5

Cause

& Corrective Action to Prevent Recurrence 88-023 881020 00 N/A HA VALVEX Unit removed from service to replace main turbine governor valves fl & f2 due to valves binding during stroke

testing, Inspection of the valves after removal indicated that the valves binding was due to pressure seal ring clearances.

Governor valves fi & P2 were replaced with new refurbished valves, The unit was returned to service.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training

& License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain

)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I Same Source

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

OCTOBER 1988 DOCKET NO 050-400 UNIT NAME:

Harris

~

DATE:

11/4/88 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944'o, Date Tl y

p e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report f System Code 4

Component Code 5

Cause 8, Corrective Action to Prevent Recurrence 88-024 881024 00 N/A ZZ ZZZZZZ Unit operating at reduced load for fuel cycle 2 power ascension testing, F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

OCTOBER 1988 DOCKET NO 050-400 UNIT NAME:

Harris DATE:

11/4/88 COMPLETED BYi M

W Hale TELEPHONE:

(919) 362-2944 No, Date Tl y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report S

System Code 4

Component Code 5

Cause 8, Corrective "

Action to Prevent Recurrence 88-025 881030 29,45 88-032 HH PUMPXX Manual reactor trip from 98$ power due to loss of normal feedwater caused by the loss of IB heater drain

pump, The loss of the heater drain pump caused a turbine runback to 50$

load.

While the reactor power was being reduced to match turbine load, IB condensate booster pump tripped followed by a loss of both main feed puf!ipse The loss of the 1B heater drain pump was caused by debris in the 3A feedwater heater (left by previous maintenance activities),

The debris was removed and the unit was returned to service.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training II License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I Same Source

" Corrective action to prevent recurrence as per the License Event Report

DOCKET NO.:

050-400 UNIT:

Harris Unit 1

DATE:

October 1988 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a 33.83 percent Availability Factor for the month of October with a 13.19 percent capacity factor.

There was 1 continued off-line

outage, 4 reduced load events, 2 manual reactor trips and 2 off-line events.

Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor vessel and 52 spent fuel assemblies in the Harris Unit 1 spent fuel pool and 0 assemblies in the new fuel pool.

Fuel reload is completed and 52 assemblies will remain in the Harris Unit 1

spent fuel pool for storage.

MEM/DATAREPa/1/OS1

?

4I

~

t CSKIN Carolina Power & Light Company

~

~

NOV 15 1988 HARRIS NUCLEAR PROJECT P.

O. Box 165 New Hill, North Carolina 27562 File Number'.

SHF/10-15505 Letter Number'HO-880231 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, D.C.

20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of October 1988.

Yours very truly, R. A. Watson Vice President Harris Nuclear Project MWH:crc Enclosure cc:

Messrs.

W. H. Bradford (NRC-SHNPP)

M. L. Ernst (NRC-RII)

R.

G. Oehl (DOE)

J.

M. Taylor (NRC)

MEM/MoOperRep/1/OS1

0 1

r ii',,-8 -:f '798