Forwards Insp Rept 50-400/88-26 on 880808-12.No Violations or Deviations Noted
ML18005A598
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/14/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18005A599 List:
References
NUDOCS 8809260250
Download: ML18005A598 (5)


See also: IR 05000400/1988026

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8809260250

DOC.DATE: 88/09/14

NOTARIZED: NO

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina

AUTH.NAME

AUTHOR AFFILIATION

HERDT,A.R.

Region 2,, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina

Power

& Light Co.

DOCKET

g

05000400

SUBJECT:

Forwards Insp Rept 50-400/88-26

on 880808-12.No violations

or deviations noted.

.R

DISTRIBUTION CODE:

IEOSD

COPIES

RECEIVED:LTR

I

ENCL J

SIZE:

<+ f7

TITLE: Environ

& Radiological

(50 DKT)-Insp Rept/Notice of Violation, Respons

NOTES:Application for permit renewal filed.

05000400 ~

S

RECIPIENT

ID CODE/NAME

PD2-1

LA

BUCKLEY,B

INTERNAL: ACRS

AEOD/DSP

NMSS/SGOB

4E4

NRR/DOEA/EAB 11

NRR/DREP/RPB

10

S-

STRACT

REG

02

SIR

DEPY

RGN2/DRSS/EPRPB

EXTERNAL: LPDR

NSIC

COPIES

'TTR ENCL

1

0

1

'

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

PD2-1

PD

AEOD/DOA

NMSS/LLOB

5E4

NRR/DLPQ/PEB 11

NRR/DREP/EPB

10

NRR/PMAS/ILRB12

OGC/HDS1

RES

RGN2

FILE

01

RGN4 MURRAY,B

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

'

1

1

1

1

1

1

1

1

1

1

A

D

D

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

26

ENCL

25

SEP 14 1888

Docket

No. 50-400

License

No.

NPF-63

Carolina

Power

and Light Company

ATTN:

Nr.

E.

E. Utley

Senior Executive Vice President

Power Supply

and Engineering

and Construction

P.

O.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NO. 50-400/88-26

This refers

to

the Nuclear

Regulatory

Commission

(NRC) inspection

conducted

by J.

L. Coley,

on

August 8-12,

1988.

The

inspection

included

a review of

activities

authorized

for your Harris facility.

At the

conclusion

of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within

the

scope

of

the

inspection,

no violations

or

deviation's

were

identified..

In accordance

with Section

2.790

of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sin erely,

Bj

Alan R. Herdt, Chief

Engineering

Branch

Division of Reactor Safety

Enclosure:

NRC Inspection

Report

cc:

(See

page

2)

po~0~2602~%0

Se 0g,1 ~

ADOCK 05000400

PDC:

SEP 14 1%3

Carolina

Power

and Light Company

cc w/encl:

R.

A. Matson,

Vice President

Harris Nuclear Project

D. L. Tibbitts, Director of Regulatory

Compliance

C.

S. Hinnant, Plant General

Manager

bcc w/encl:

C. Barth,

OGC

NRC Resident

Inspector

A. Upchurch,

Chairman,

Triangle J

Council of Governmen.s

DRS, Technical Assistant

Document Control

Desk

State of North Carolina

RI I

~Q C.

JLLo1 ey: es

V/r/88

RII~

GA allstro

0/7 /88

lake

/~ W88

RII

) '3l

redri ckson

8/)~8