Text

~

..~cczmmT44, Mgf..k~&ggg ~. p~>>

SION NBR:8809140289 88/

cS'CC DOC.DATE: NOTARIZED: NO DOCKET FAC,IL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION HALP, M. Carolina Power 6 Light Co.

WATSON,R.A. Carolina Power a Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operati t for Aug 1988 for Harris Nuclear Power Plant Unit 1. /88090 ltr.

DISTRIBUTION CODE: IE24D OPIES RECEIVED:LTR ( ENCL / SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

D NOTES:Application for permit renewal filed. 05000400 RECIPIENT ID CODE/NAME COPIES LTTR ENCL RECIPIENT ID CODE/NAME COPIES LTTR ENCL

/

PD2-1 LA 1 0 PD2-1 PD 5 5 h

BUCKLEY,B 1 0 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPQ/PEB 11 1 1 NRR/DOEA/EAB 11 1 1 EP RPB 10 1 1 NUDOCS-ABSTRACT 1 1 REPTILE Ol 1 1 RGN2 1 1 EXTERNAL EGStG WILLIAMSg S 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 h

D TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 29

DOCKET NO.: 050-400 UNIT: Harris Unit 1 DATE: August 1988 COMPLETED BY: Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a 0.0 percent Availability Factor for the month of August with a -1.66 percent capacity factor. There was one continued offline refueling outage, the refueling outage is in progress. Details are provided on the Unit Shutdowns and Power Reduction Sheet.

I There are 157 fuel assemblies and 52 new fuel assemblies in the Harris Unit 1 spent fuel pool and 0 assemblies in the new fuel pool.

Fuel insert shuffle completed and fuel reload is in progress. 157 fuel assemblies will be reloaded into the reactor and 52 assemblies will remain in the Harris Unit 1 spent fuel pool for storage.

8809i40289 88083i PDR ADOCK 050004DO

, R PNU MEM/DATAREPa/1/OS1

V 1

I k, 1 I

IL g I ff C

CF'6L CO F'LANT F'ERFQRMANCE DATA SYSTEM PAGE

" 09/06/88 OF'ERAT ING DATA REF'ORT RPD36-000 RUN DA'fE RUN TIME 08: 43: 33 HARRIS UNIT DOCKET HO. 050-400 COMF'LETED BY MARK M. HALE OF'ERAT IHG STATUS TELEF'HOHE (919)362-2944 UNIT NAME: I.IARRIS UNIT I NOTES I l

REF'ORT ING F'ER OD: AUGUST 88 I Fuel insert shuffle completed and

3. LICENSED THERMAL F'OWER (MMT): 2775 4 HAMEF'LATE RATING (GROSS MWE): 950.9 <<el <<l-d in p<<S<<ss.

I

~

ELECTRICAL RAT IN( ( HET MWE ) 9QQ Q~

I assemblies will be reloaded into 6.

4 MAX DEF'ENDABLE CAF'ACITY (GROSS MME): 920.0 I I

t"e ~~~~t~~ and ~2 will remain I

7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF Cl-IAHGES OCCUR ZN CAF'ACITY RATINGS ( ITEMS 3 THRU 7) SINCE LAST REF'ORT, GIVE REASONS:

N/A F'OWER LEYEL TO Wl IICI I RESTRICTED IF ANY ( NET MWE ): None

18. REASONS FOR RESTRICTION IF ANY:

N/A Tl-IIS YR TO CUMUL MONTH DATE ATIVE HOURS IH REPORTING PERIOD 744.00 5855.00 33732.88 NUMBER OF I-IQURS REACTOR CRITICAL .08 4877.65 9327.54

33. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE .00 4865.05 9188.65
15. UNIT RESERYE SHUTDOWN HOURS .00 .00 .80 f6. GROSS Tl-IERMAL ENERGY GEH. (MWH) .00 33106387 AD )6 24256532.52
17. GROSS ELEC. ENERGY GEN. (MWH) .00 4396889.00 8862(87.88 f8. HET ELEC. ENERGY GENERATED (MMH) -18689.88 4184219.88 7483048.00 UNIT SERYICE FACTOR .00 83.09 78.46

.l Q UNIT AVAILABILITYFACTOR .08 83.09 78.46 UNIT CAP. FACTOR (USING MDC NET) -3 .66 81.5$ 74. 2'9 4 4 J UNIT CAF'. FACTOR (USING DER HET) -1.58 77.89 70.99 23m UNIT FORCED OUTAGE RATE .00 3.98 7. 33 SHUTDOWHS SCI-IED. OYER NEXT 6 MONTHS (TYF'E, DATE, AND DURATION QF EACH):

None

25. IF SHUTDOWN AT END OF REF'ORT F'ERIOD, ESTIMATED DATE OF START UP: 10/03/SS UNITS lN TEST STATUS (F'RIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MEN/DATAREPa/2/OSl

)C CPKL. CO' PLANT F'ERFORHAHCF DATA SYSTEH F'AGE RL~H DATE 09/OE)/88 APF'EHD I X B AVERAGE DAILY POWER LEVEL RPD39-006 RUH TIHE 08:44:12 I-IARR I S l3N IT DOCKET NO. e5e-4ee COHF'I ETED BY HARK W. HALL=.

TELEPHONE (919)362-2944 AUGU, T 1988 DAY A VG. DAILY F'OWER LEVEL DAY AVG. DAILY F'OWER LEVEL (HWE-NET) (HWE-HET) l)9

-30

-18

')5 30

.)7 28 1.16 8 MEM/DATAREPa/3/OS1

i(

~

t

UNIT SHUTDOWNS AND POWER REDUCTION DOCKET NO,: 050-400 UNIT NAME: Harris DATE: 9/6/88 COMPLETED BY: M. W. Hale TELEPHONE: (919) 362-2944 REPORT MONTH: AUGUST 1988 R Method No, Date Duration of Licensee System Component Cause II, Corrective (Hours) Shutting Event Code 4 Code 5 Action to Down Report /f Prevent Recurrence Reactor 88-017 880730 744,00 88-018 ZZ ZZZZZZ Unit ramped down to off line for refueling outage During the ramp down the running mainfeed Pump (1B) tripped on low flow due to a recirc valve failing to open on load decrease, As a result, both motor driven AFW pumps started as required'he cause of the mainfeed pump (IB) trip was determined to be a low setpoint on the recirculation flow s~itch. The flow switch had drifted out of calibrations Corrective action includes:

recalibration and a more frequent calibration frequency to prevent recurrence, F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161 )

E-Operator Training 4 License Examination 5-Reduced Load F-Administrative 6-Other G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

" Corrective action to prevent recurrence as per the License Event Report

V l

1

CRQE Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0. Box 165 New Hill, North Carolina 27562 SEP Q 8 )988 File Number,'SHF/10-15505 Letter Number.'O-880184 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO ~ 1 DOCKET NO. 50-400 LICENSE NO. NPF"63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of August 1988.

Yours very truly, R. A. Watson Vice President Harris Nuclear Project MWH'tbb Enclosure cc'Dr. J. Nelson Grace (NRC)

Messrs. J. M. Taylor (NRC)

G. F. Maxwell (NRC-SHNPP)

R. G. Oehl (DOE)

MEM/MoOperRep/1/OS1