Monthly Operating Rept for June 1988 for Harris Nuclear Project,Unit 1
ML18005A522
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/30/1988
From: Hale M, Watson R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
HO-880138-(O), NUDOCS 8807180372
Download: ML18005A522 (7)


Text

ACCEiZRLTED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)

/ /~

ACCESSION NBR:8807180372 DOC.DATE: 88/85/~

NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.W.

Carolina Power

& Light Co.

WATSON,R.A.

Carolina Power

& Light Co.

RECIP.NAME RECXPIENT AFFXLIATION DOCKET 05000400

SUBJECT:

Monthly operating rept for June 1988 for Harris Nuclear Project Unit 1.W/880713 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR 2 ENCL 2 SIZE:.

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed.

D 05000400 RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY,B INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR/DQE2/RPB 10 XLE 01 EXTERNAL: EG&G WILLIAMS,S NRC PDR COPIES LTTR ENCL 1

0

~

1 0

10 10 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT XD CODE/NAME PD2-1 PD AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 LPDR NSIC COPIES LTTR ENCL 5

5 1

1 2

2 1

1 1

1 1

1 1

1 1

1 lA R

I D

8 A

D TOTAL NUMBER OF COPIES REQUIRED:

LTTR 31 ENCL 29

DOCKET NO.:

050-400 UNIT:

Harris Unit 1

DATE:

June 1988 COMPLETED BY:

Nark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a

100 percent Availability Factor for the month of June with a 96.94 percent capacity factor.

There was one load reduction.

Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor and 0 spent fuel bundles in the Harris Unit 1 spent fuel pool and 52 new fuel assemblies in the new fuel pool.

8807180372 880630 PDR ADOCK 05000400 R

PDC MEM/DATAREPa/1/OS1 g(H ~

CF'lL C6 RUH D'ATI=07/01/88 RUH '

IME' 1: 06: 35

'LANT I ERFQRMAHCE DATA SYS'rEM OPERATING DAT* REPORT HARRIS UNlT PAGE

'I RF'D36-008 OPERATING STATUS DOCKET HO. 050-400 COMPLETED BY MARK W.

HALE TELEF'HQHE (919)36..944 1.

h 4

%5 k 4 ~

5.

6.

7.

8.

UNIT NAME:

HARRIS UNIT REPORTING F'ER IOD:

JUNE 88 LICENSED THERMAL F'OWER (MWT):

775 HAMEF'LATE RATING (GROSS MME): 958.9 DESIGN ELECTRICAL RATING (NET MWE): 900.0 MAX DEPENDABLE C*F'ACITY (GROSS MWE): 928.0 MAX DEPENDABLE CAPACITY (NET MWE): 868.8 IF CHAHGES OCCUR IH CAF'ACITY RAT1HGS (ITEMS GIVE REASONS:

HOTES I

I There are 157 fuel elements n thel I Reactor

Vessel, 0 elements in the I

I Spent Fuel Pools and 52 new fuel I

assemblies in the new fuel pool.

I I

I 3

THRU 7)

SIHCE LAST REF'QRT, 10.

F'OWER LEVEL TO WHICH RESTRICTED IF AHY (HET MWE): None REASONS FOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUMUL.

ATIVE 14.

15.

16.

17.

18.

19.

".l0 j

HOURS IH REF'ORT IHG PERIOD NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HRS HOURS GENERATOR OH LIHE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL, EHERGY GEH.

(MWH>

GROSS ELEC.

ENERGY GEN.

(MMH)

HET ELEC.

ENERGY GEHERATED (MWH)

UNIT SERV ICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAI-'.

FACTOR

( USING MDC HET )

UNIT CAP.

FACTOR (USING DER HET)

UNIT FORCED OUTAGL RATE SHUTDOWNS SCHED.

OYER NEXT 6 MONTHS 720.00 720.00

.00 728.00

.00 1928729.34 640245.08 600233.00 100.00 100.00 96.94 92.63

.88 (TYPE,

DATE, 4367.00 4177.22

.00 4165.42

.00 11396805.12 3835392.80 3593772.00 95.38 95.38 95.69 91.44 4.62 AND DURATION 10224.00 8627.11

.00 8489.02

.00 546958.4e 7500610.00 6972601.00 83.03 e3.83 79.30 75.78 7.67 OF EACH>:

25

~

26.

Refueling Outage July.16, 1988 8 weeks.

IF SHUTDOWN AT EHD OF REF'ORT F'ERIOD, ESTlMATED DATE OF START UP:

UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATIOH):

FORECAST ACHIEYED INITIAL CRITICAI lTY INITIAL ELECTRICITY COMMERCIAL OPERATION IIE';1/DATAREP a

/2/OS 1 1.16 9

CPbL CO PLANT F'ERFORH*NCE DATA SYSTEH RUN DATE 07/e3 /88 Al NDIX B AVERAGE DAILY P LEVEL RUN TIRE 1 f:06: 34 HARRIS UNIT F'AGE RPD39-806 3988 DAY AVG. DAILY F'OWER LEVEL (HWE-NET)

DOCKET NO. 050-480 COHPLETED BY HARK W.

HAI E TELEPHONE (919)362-2944 DAY AVG. DAILY POWER LEVEL (HWE-NET) 888

$75 20

$57 854 859

.)3 10 724

'77 858 870 30 868 1.16 8

~iZH/DATAREPa/3/OS 1

UNIT SHUTDOWNS AND POWER REDUCTION REPORT HONTH:

JUNE 1988 C

~

~

C

~

0 DOCKET NO.:

050-400 UNIT NAME:

Harris DATE:

7/1/88 COMPLETED OY: H.

WE Hale TELEPHONE:

(919) 362-2944 No; Date Tl y

p e

OIjrat ion (Hours )

R Hethod of Shutting Down Reactor Licensee Event Report l System Code 4

Component Code 5

Cause 8, Corrective Action to Prevent Recurrence 88-012 880610 00 N/A HC HTEXCH Load reduced to 305 due to secondary chemistry parameters indication of a

condenser tube leak.

During the down power, greater than 60 AFO penalty points were accumulated.

The action required by the AFD Tech Spec could not be satisfied due to an unrelated, earlier failure of an OTAT channels To satisfy Tech Specs, reactor power was further reduced to l4g, One tube was plugged and one tube was rolled in the west waterbox, Repairs Mere completed and the unit Mas returned to full power.

F:

Forced S:

Scheduled MEM/OATAREPa/4/OSI Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Hethod:

I-Hanua I 2-Hanual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I Same Source

CSM

'0 Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0.

Box 165 New Hill, North Carolina 27562 JUL G 1988 File Number'.

SHF/10-15505 Letter Number'HO-880138 (0)

Document Control Desk United States Nuclear Regulatory Commission Mashington, D.C.

20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specifications 6.9.1.-5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of June 1988.

Yours very truly, MWH:tbb Enclosure R. A. Watson Vice President Harris Nuclear Project cc'.

Dr. J. Nelson Grace (NRC)

Messrs.

J.

M. Taylor (NRC)

G. F. Maxwell (NRC-SHNPP)

R. G. Oehl (DOE)

MEM/MoOperRep/1/OS1