ML18005A503

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/88-11 on 880420-0520 & Notice of Violation
ML18005A503
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/22/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18005A505 List:
References
NUDOCS 8807130317
Download: ML18005A503 (3)


See also: IR 05000400/1988011

Text

ACCELERA7ED

3)ISTRIBUTION

DEMONSTRATION

BYE'Zg

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8807130317

DOC.DATE: 88/06/22

NOTARIZED:

NO

DOCKET

>ACZL:50-400 Shearon Harris Nuclear

Power Plant, Unit 1, Carolina,

05000400

AUTH.NAME

AUTHOR AFFILIATION

GRACEiJ.N.

Region

2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

.

Carolina

Power

a Light Co.

SUBJECT:

Forwards

Insp Repts

50-400/88-11

on 880420-0520.Violations

noted.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:Application for permit renewal filed.

D

05000400

S

RECIPIENT

ID CODE/NAME

PD2-1

PD

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB

11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OE LIEBE

NgJ

EG

ILE

02

R

FILE

01

EXTERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

'

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BUCKLEY,B

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC 15-B-18

RES/DRPS

DEPY

NRC

PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

h

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25

JUN 2 2 jSS8

Docket No. 50-400

License

No.

NPF-63

Carolina

Power

and Light Company

/RAN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(INSPECTION

REPORT

NO. 50-400/88-11)

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

G.

F. Maxwell on April 20 - May 20,

1988.

The inspection

included

a review of

activities

authorized

for your Harris facility.

At the

conclusion

of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

The inspection

findings indicate that certain activities

appeared

to violate

NRC requirements.

The violation concerns

the control of plant safety

systems

while testing

the solid state

protection

system.

Accordingly, references

to

pertinent

requirements,

and

elements

to

be

included

in your

response

are

described

in the enclosed

Notice of Violation.

Mhile

the

identification

of

the

indicated

violation

by your staff is

commendable,

the length of time the

problem existed .is not.

Accordingly, in

addition to the

need

for corrective

action

regarding

the specific

matters

identified in the

enclosed

Notice,

we are

concerned

about

the

implementation

of your configuration

control

procedures

that

permitted this situation

to

develop.

Consequently,

your response

should describe

those particular actions

taken or planned to improve the effectiveness

of your program.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part

2,

Title 10,

Code of Federal

Regulations,'a

copy of thi s letter

and its enclosures

wi 11

be placed in the

NRC Public Document

Room.

The

responses

directed

by this letter

and its enclosures

are

not subject to

the clearance

procedures

of the Office of Management

and Budget as required

by

the Paperwork Reduction Act of 1980,

PL 96-511.

'807130317

880622

PDR

ADOCN, 05000400

6

PNU

ZEo (

Carolina

Power

and Light Company

0

JUN 22

19Bg

Should you have

any questions

concerning this letter,

please

contact us.

Sincerely,

[)lidulCil Jig'/gy

J.

Nelson

Grace

Regional Administrator

Enclosures:

1.

Notice of Violation

2.

Inspection

Report

cc w/encls:

. A. Watson,

Vice President

Harris Nuclear Project

M L. Tibbitts, Director of Regulatory

Compliance

J. L. Harness,

Plant General

Manager

bcc w/encls:

~ Barth,

OGC

~ Resident

Inspector

LA. Upchurch,

Chairman, Triangle J

Council of Governments

DRS, Technical Assistant

Document Control

Desk

State of North Carolina

RII

RII

RII

RCer oil:ht

MFre ricksoe

DNVerrelli

6/I5/88

6/ Ij/88

6/ I b/88

RI

LA

yes

RII

6/W/88