Forwards Insp Rept 50-400/88-15 on 880520-0611.No Violations or Deviations Noted
ML18005A485
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/23/1988
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18005A487 List:
References
NUDOCS 8807120506
Download: ML18005A485 (5)


See also: IR 05000400/1988015

Text

ACCELHMTED

DISTRIBUTION

DEMONSTRATION

SYSTEM

q

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

0

ACCESSION NBR:8807120506

DOC.DATE: 88/06/23

NOTARIZED: NO

DOCKET

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit-l, Carolina

05000400

AUTH.NAME

=

AUTHOR AFFILIATION

VERRELLI,D.M.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENTAFFILIATION

UTLEY,E.E.

Carolina

Power

& Light Co.

SUBJECT:

Forwards Insp Rept 50-400/88-15

on 880520-0611.No violations

or deviations noted.

DISTRIBUTION CODE: IEOID

COPIES

RECEIVED:LTR Q ENCL J

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:Application for permit renewal filed.

05000400

S

RECIPIENT

ID CODE/NAME

PD2-1

PD

RGN2

EXTERNAL: LPDR

NSIC

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB 11

NRR/DOEA DIR 1 1

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OE~IBBB

N,J

G FIL

02

FILE

01

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

2

2

1

'1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BUCKLEY,B

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC 15-B-18

RES/DRPS

DEPY

NRC

PDR

COPIES

LTTR ENCL"'

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

A

A

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25

JL~N 2.>

19IIKI

Docket No. 50-400

License

No. NPF-63

Carolina

Power

and Light Company

ATTN:

Nr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NO. 50-400/88-15

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

G.

F. Maxwell on Hay 20 - June

11,

1988.

The inspection

included

a review of

activities

authorized

for your Harris facility.

At the conclusion of the

inspection,

the findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

r

Areas

examined

during

the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of

activities in progress.

Within the

scope

of the inspection,

no violations or deviations

were identi-

fied.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact us.

Sincerely,

David tl. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosure:

NRC Inspection

Report

cc w/encl:

R.

A. Watson,

Vice President

Harris Nuclear Project

D. L. Tibbitts, Director of Regulatory

Compliance

J. L. Harness,

Plant General

Manager

bcc w/encl:

(See

page

2)

8807120506

880623

PDR

ADOCK 05000400

0

PDC

Carolina

Power and Light Company

2

bcc w/encl:

C. Barth,

OGC

NRC Resident

Inspector

A. Upchurch,

Chairman, Triangle J

Council of Governments

DRS, Techni.cal Assistant

Document Control

Desk

State of North Carolina

RII

RCarr ll:sh

06/+/88

RII

PFre'8rickson

06/~) /88