ENCLOSURE 3 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400 OPERATING LICENSE NPF-63 REQUEST FOR LICENSE AMENDMENT BORON DILUTION/SLIDINGSHUTDOWN MARGIN R

ISED TECHNICAL SPECI C TION PAGES 8802110299 880208 PDR ADQCH, 05000400 p

jpDR

INCEX 3.0/4.0 LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4o 0 APPLICABILITYo~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

3/4 0-1 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1. 1 3/4.1. 2 BORATION CONTROL

~

Shutdown Margin-

~ ~ ~ ~ o ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~

PZ ax 2~9, Shutdown Margin-Moderator Temperature Coefficient........................

Minimum Temperature for Criticality......................

BORATION SYSTEMS 3/4 1-1 3/4 1-3 3/4 1-4 3/4 1-6 Flow Path - Shutdown.......,.............................

E Flow Paths - Operating...................................

Charging Pump - Shutdown.................................

Charging Pumps - Operating...........................,...

Borated Water Source - Shutdown..........................

3/4 1-7 3/4 1-8 3/4 1-9 3/4 1-10 3/4 1-11 Borated Water Sources - Operating........................

3/4 1-12 3/4.1.3 MOVABLE CONTROL ASSEMBLIES Control Rod,Insertion. Limits..............,.........

~El FIGURE~

ROD GROUP INSERTION LIMITS VERSUS THERMAL POWER THREE-LOOP OPERATION.................................

~

~ ~ ~

Group Hei gtito o

~ ~

~ ~ ~

~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ o

~ ~ ~ ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ o ~ ~ ~

~

TABLE 3.1-1 ACCIDENT ANALYSES RE(UIRING REEVALUATION IN THE EVENT OF AN INOPERABLE ROD...............................

Position Indication Systems - Operating..............

Position Indication System - Shutdown..............'..

R

~E

~

od Drop Time............................................

Shutdown Rod Insertion Limit.............................

3/4 1-14 3/4 1-16 3/4 1-17 3/4 1-18 3/4 1-19 3/4 1-20 3/4. 1 3/4 1-22

<<4<RE 8 I-I 84i+dasaoN. /pcaqlo. +revs RQK coro@....

+f I ace WN.CR.YL'ffMW44A.PP~~

+p Yg~~~o SHEARON HARRIS UNIT 1 iv

3/4.1 REACTIVITY CONTROL SYSTEMS 3/4. l. 1 BORATION CONTROL SHUTDOWN MARGIN-avo LIMITING CONDITION FOR OPERA7ION 3.1.1.1 The SHUTDOWN MARGIN shall be greater than or equal to 1770 pcm for 3-loop operation.

I IYY:

2222 IIt2 ACTION:

cz.nd With the SHUTDOWN MARGIN less than 1770 pcm, immediately initiate and continue boration at greater than or equal to 30 gpm of a solution containing greater than or equal. to 7000 ppm boron or equivalent until the required SHUTDOWN MARGIN is restored.

SURVEILLANCE RE UIREMENTS 4..1.1.1.1 The SHUTDOWN MARGIN shall be determined to be greater than or equal to 1770 pcm:

aO Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after detection of an inoperable control rod(s) and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter while the rod(s) is inoperable.

If the inoperable control rod is immovable or untrippable,.the above required SHUTDOWN MARGIN shall be verified acceptable with an increased allowance for the withdrawn worth of the immovable or untrippable control rod(s);

b.

When in MODE 1 or MODE-2 with-K-greater than or equal to 1 at eff least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that control bank withdrawal is within the limits of Specification 3.1.3.6; c.

Within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> prior to achieving reactor criticality by verifying that the predicted critical control rod position is within the limits of Specification 3.1.3.6; Y

d.

Prior to initial operation above 5X RATED THERMAL POWER after each belo~, with the control banks at the maximum inser tion limit of Specification. 3.1.3.6; and "See Special Test Exceptions Specification 3.10.1.

SHEARON HARRIS - UNIT 1 3/4 1-1

. REACTIVITY CONTROL SYSTEMS SURVEILLANCE REOUIREMENTS Continued 1)

Reactor Coolant System boron concentration, 2)

Control rod position, 3)

Reactor Coolant System average temperature, 4)

Fuel burnup based on gross thermal energy generation, 5)

Xenon concentration, and 6)

Samarium concentration.

4.1.1.1.2 The overall core reactivity balance shall be compared to predicted values to demonstrate agreement within &000 pcm at. least once per 31 Effective Full Power Oays (EFPO).

This comparison shall consider at least those factors stated in Specification

4. 1. 1. 1. 1e.,

above.

The predicted reactivity values shall be adjusted (normalized) to correspond to the actual core conditions prior to exceeding a fuel burnup of 60 EFPD after each fuel loading.

If later experience shows adjustment is desirable at approximately 60 EFPO, the adjustment is permissible.

SHEARON HARRIS - UNIT 1 3/4 1-2

REACTIVITY CONTROL SYSTEMS

~

g q SHUTDOWN MARGIN-av LIMITING CONDITION FOR OPERATION 3.1.1.2 The SHUTDOWN MARGIN shall be greater than or equal tof40@~e.

APPLICABILITY: Me&AS'A~~t II~~

ACTION:

'tea r-agcr ircal WQC.

With the SNUTOQWN MARGIN 1eaa than(RGS!1-oem'immediate1y initia'te and continue boration at greater than or equal to 30 gpm of a solution containing greater than or equal to 7000 ppm boron or equivalent until the required SHUTDOWN MARGIN is restored.

SURVEILLANCE REQUIREMENTS 4.1.3..2 The SHUTDOWN MARGIN shall be determined to be greater than or equal to 898~me. +km~+i~ ~cd%:

a.

Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after detection of an inoperable control rod(s) and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereaftet: while the rod(s) is inoperable.

If the inoperable control rod is immovable or untrippable, the SHUTDOWN MARGIN shall be verified acceptable with an increased allowance for the withdrawn worth of the immovable or untrippable control rod(s);

and b.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by consideration of the following factors:

1)

Reactor Coolant System boron concentration, 2)

Control rod position, 3)

Reactor Coolant System average temperature, 4)

Fuel burnup based on gross thermal energy generation, 5)

Xenon concentration, and 6)

Samarium concentration.

SHEARON HARRIS - UNIT 1 3/4 1-3

FlbuRE 3 <"~

SHUTooWN MAR~lnl VGRSus Rcs Bono~

Coccus TRAT1>N> Rob~

~, M,ANDS

'7ooo Q,zoo) cugfoo)

(pOOa 0-I OOOO 0

VJ OOOO oooo

'z 300 2ceo V) lo~

-MobES 8 At4D 0 MODE S (A/3 lotto) pO pooE 8 anH Aw Mh5T oNa RcP

<g of eaAnoH AqO lA4DG~

(LSoo, l'lid)

(gazoo, 2 Zga) 40o Soo

\\2.00 i4,oo 4000 2/00 REQulgGD BC'ogol4 got4~ENTRAt log (~~~5 (qua!4uP 06FeHt N

+ 5pp<ic,able

+o AocA.p 0

q +i+< or u~4kouA g.C.V's tw opcra+o~

REACTIVITY CONTROL SYSTEMS FLOW PATHS -.OPERATING LIMITING CONOITION FOR OPERATION 3.1.2.2 At least two of the following three boron injection flow paths shall be OPERABLE:

The flow path from the boric acid tank via a boric acid transfer pump and a charging/safety injection pump to the Reactor Coolant System (RCS),

and Two flow paths from the refueling water storage tank via charging/

safety injection pumps to the RCS.

APPI ICABILITY:

MODES 1, 2, and 3.

ACTION:

With only one of the above required boron injection flow paths to the RCS OPERABLE, restore at least two boron injection flow paths to the RCS to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANOBY and borated to a SHUTOOWN MARGIN at 200'F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore at least two flow paths to OPERABLE status within the next 7 days or be in COLO SHUTOOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

sac reguiraal Q F(soma zl-I SURVEILLANCE REOUIREMENTS 4.1.2.2 At least two of the above required flow paths shall be demonstrated OPERABLE:

a.

At least once per 7 days by verifying that the temperature. of the flow path between the boric acid tank and the charging/safety injec-tion pump suction header tank is greater than or equal to 65'F when a flow path from the boric acid tank is used; b.

At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path that is not locked,

sealed, or otherwise secured in position, is in its correct position; c.

At least once per 18 months during shutdown by verifying that each automatic valve.in the flow path actuates to its correct position on a safety injection test signal; and d.

At least once per 18 months by verifying that the flow path required

.by Specification

3. 1.2.2a.

delivers at least 30 gpm to the RCS.

SHEARON HARRIS - UNIT 1 3/4 1-8

REACTIVITY CONTROL SYSTEMS CHARGING PUMPS - OPERATING LIMITING CONDITION FOR OPERATION 3.1.2.4 At least two charging/safety injection pumps shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3.

ACTION:

With only one charging/safety injection pump OPERABLE, restore at least two charging/safety injection pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY and borated to a SHUTDOWN MARGIN QOQ~a at 200 F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore at least two charging/

safety injection pumps to OPERABLE status within th next 7 days or be in COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

saS reguirOC(Q Fichu TN.t.i-I SURVEILLANCE REQUIREMENTS

4. 1.2.4 At'east two charging/safety injection pumps shall be demonstrated OPERABLE by verifying, on recirculation flow or in service supplying flow to the Reactor Coolant System and reactor coolant pump seals, that a differential pressure across each pump of greater than or equal to 2446 psid is developed when tested pursuant to Specification 4. 0. 5.

rr

\\

r SHEARON HARRIS - UNIT 1 3/4 1-10

RE'ACTIVITY CONTROL SYSTEMS BORATED WATER SOURCE - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.2.5 As a minimum, one of the following borated water sources shall be OPERABLE:

A boric acid tank with:

Vl00 1.

A minimum contained borated water volume of 4988 gallons,.which is equivalent to 9% indicated.level,

[7+o 2.

A boron concentration of between 7000 and 7750 ppm, and 3.

A minimum solution temperature of 654F.

b.

The refueling water storage tank (RWST) with:

2.

fc+~ooo A minimum contained borated water volume of~46& gallons, which is equivalent to M indicated level, 4L4/a A boron concentration of between 2000 and 2200

ppm, and 3.

A minimum solution temperature of 40'F.

APPLICABILITY:

MODES 5 and 6.

ACTION:

With no borated water source OPERABLE, suspend all operations involving CORE ALTERATIONS or positive reactivity changes.

SURVEILLANCE REQUIREMENTS 4.1.2.5 The above required borated water source shall be demonstrated OPERABLE:

a0 At least once per 7 days by:

1.

Verifying the boron concentration of the water, 2.

Verifying the contained borated water volume, and 3.

Verifying the boric acid tank solution temperature when it is the source of borated water.

b.

At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the RWST temperature when it is the source of borated water and the outside air temperature is less than 40 F.

SHEARON HARRIS - UNIT 1 3/4 1-11

REACTIVITY CONTROL SYSTEMS BORATED WATER SOURCES - OPERATING LIMITING CONDITION FOR OPERATION

3. 1.2.6 As a minimum, the following borated water source(s) shall be OPERABLE as required by Specification 3.1.2.2:

a.

A boric acid tank with:

.2.

O.lipoid A minimum contained borated water volume of %6-,86$ gallons, which is equivalent to~ indicated level.

60'f4 A boron concentration of between 7000 and 7750

ppm, and b.

3.

A minimum solution temperature of 65'F.

The refueling water storage tank (RWST) with:

1.

A minimum contained borated water volume of 436,000 gallons, which is equivalent to 92,. indicated level.

2.

A 'boron concentration of between 2000 and 2290

ppm, 3.

A minimum solution temperature of 404F, and 4.

A maximum solution temperature of 1254F.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTION:

a.

b.

~~ regui~Q F ~ora > I-I With the boric acid tank inoperable and being used as one of the above requi red borated water sources, restore the boric acid tank to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and borated to a SHUTDOWN MARGIN at 200'F; restore the boric acid tank to OPERABLE status within the next 7 days or be in COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

With the RWST inoperable, restore the tank to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in at least HOT.STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLO SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SHEARON HARRIS - UNIT 1 3/4 1-12

REACTIVITY CONTROL SYSTEMS 3/4. 1. 3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONOITION FOR OPERATION 3.1.3.1 All shutdown and control rods shall be OPERABLE and positioned within e 12 steps (indicated position) of their group step counter demand position.

APPLICABILITY:

MODES 1" and 2".

ACTION:

a ~

b.

C.

d.

With one or more rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT STANOBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With more than one rod misaligned from the group step counter demand position by more than

+ 12 steps (indicated position),

be in HOT STANOBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With more than one rod inoperable, due to a rod control urgent failure alarm or obvious electrical problem in the rod control system existing for greater than 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, be in HOT STANOBY within the followi.ng 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With one rod trippable but inoperabl'e due to causes other than addressed by ACTION a.;

above, or misaligned from 'its group step counter demand height by more than ~ 12 steps (indicated position),

POWER OPERATION may continue provided that within 1 hour:

1.

The rod is restored to OPERABLE status within the above alignment requirements, or 2.

3.

The rod is declared inoperable and the remainder of the rods in the group with the inoperable rod are aligned to within i 12 steps of the inoperable rod while maintaining the rod sequence and insertion limits of Figure ~.

The THERMAL POWER level shall be restricted pursuant to Specification 3.1.3.6 during subsequent operation, or The rod is declared inoperable and the SHUTGOWN MARGIN requirement of Specification

3. 1. 1.1 is satisfied.

POWER OPERATION may then continue provided that:

a)

A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents "See Special Test Exceptions Specifications 3.10.2 and 3.10.3.

SHEARON HARRIS - UNIT 1 3/4 1-14

REACTIVITY CONTROL SYSTEMS CONTROL ROO INSERTION LIMITS LIMITING CONDITION FOR OPERATION 3.1.3.6 The control banks shall be limited in physical insertion as shown in Figure +;:M.

Col>> Ik APPLICABILITY:

MODES 1" and 2"

"".'CTION:

With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2:

a.

Restore the control banks to within the limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or b.

Reduce THERMAL POWER within 2 'hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank posi-tion using Figure M~, or Zof~Q, c.

Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REOUIREMENTS 4.1.3.6 The position of each control bank shall be determined to be within the insertion limits at least onca per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> except during time intervals when the rod insertion limit monitor is inoperable, then verify the individual rod positions at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

"See Special Test Exceptions Specifications 3.10. 2 and 3. 10.3.

~

""With K ff greater than or equal to 1.

eff SHEARON HARRIS.- UNIT 1 3/4 1-21

220

.538 228 c 180 D

S

~ 160

~~

co 140 CL

~ 120 C)~ 100 CA C)~

eo 0,

128 BANK BANK 186 C)

CO 40 20 0

0

.00

.10

.20

.30

,40

.50

.60

.70

.80

.90 1.0 FRAC>iO~ oF RA~Eo >~ERMAL PQNER RGURE MQ ROD GROUP INSERTlON LlMlTS VERSUS THERMAl. POWER THREE-LOOP OPERATION

se

~'/4. 1 REACTIVITY CONTROL SYSTEMS BASES Agg

~Si 3/4.l. 1 BORATION CONTROL 3/4.1.1.1 and 3/4.1.1.2 SHUTDOWN MARGIN A sufficient SHUTDOWN MARGIN ensures that:

(1) the reactor can be made sub-critical from all operating conditions, (2) the reactivity transients associated with postulated accident conditions are controllable within acceptable

limits, and (3) the reactor will be maintained sufficiently subcritical to preclude inadvertent criticality in the shutdown condition.

xwltoafag 4,M4 SHUTDOWN MARGIN requirements vary throughout core life as a function of fuel depletion, RCS boron concentration,'nd RCS T (he most restrictive condi-avg'ion occurs at EOL, with Tav at no load operating temperature, and is asso-ciated with a postulated steam line break accident and resulting uncontrolled RCS cooldown.

In the analysis of this accident, a minimum SHUTDOWN MARGIN of 1770 pcm is required to control the reactivity transient.

Accordingly, the SHUTDOWN MARGIN requirement is based upon this limiting condition and is consistent with FSAR safety analysis assumptions.

~

~

3/4.1. 1. 3 MODERATOR TEMPERATURE COEFFICIENT The limitations on moderator temperature coefficient (MTC) are provided to ensure that the value of this coefficient remains within the limiting condition assumed in the FSAR accident and transient analyses.

The MTC values of this specification are applicable to a specific set of plant

'ondi ions; i. e., the positive limit.'is based on core -anditions or all rods withdrawn, BOL, hot zero THERMAL POWER, and the negative limit is based on core conditions for all rods withdrawn,

EOL, RATE) THERMAL POWER.

Accordingly, veri-fication of MTC values at conditions other than those explicitly stated will require extrapolation to those conditions in order to permit an accurate comparison.

SHEARON HARRIS - UNIT 1 8 3/4 1-1

Insert A to Technical Specification page B 3/4 1-1 In MODES 3, 4, and 5, the most restrictive condition occurs at BOL, when the boron concentration is the greatest.

In these

modes, the required SHUTDOWN MARGIN is composed of a constant requirement and a variable requirement, which is a function of the RCS boron concentration, The constant SHUTDOWN MARGIN requirement is based on an uncontrolled RCS cooldown from a steamline break accident, as is the case for MODES 1 and 2.

The variable SHUTDOWN MARGIN. requirement is based on the results of boron dilution accident analyses, where the SHUTDOWN MARGIN is varied as a function of RCS boron concentration, to guarantee a minimum of 15 minutes for operator action prior to a loss of SHUTDOWN MARGIN.

Figure 3.1-1 must be used with a curve giving the required shutdown boron concentrations for various temperatures as a function of core burnup.

This cycle dependent relationship is provided for each cycle in the plant Curve Book.

From the Curve Book, a required boron concentration that will provide adequate SHUTDOWN MARGIN can be determined and this concentration may be used to enter Figure 3.1-1 to determine the specific required SHUTDOWN MARGIN for that condition.

The boron dilution analysis assumed a common RCS volume and dilution flow rate for MODES 3 and 4, which differed from the volume and flow rate assumed for MODE 5 analysis.

The MODE 5 conditions assumed limited mixing in the RCS and cooling with the RHR system only.

In MODES 3 and 4, it was assumed that at least one reactor coolant pump was operating.

If a least one reactor coolant pump is not operating in MODE 4, then the SHUTDOWN MARGIN requirements for MODE 5 shall apply, provided that the dilution flow rate assumed in the MODE 5 Boron Dilution analysis is not exceeded.

r REACTIYITY CONTROL SYSTEMS BASES MODERATOR TEMPERATURE COEFFICIENT Continued The most negative HTC, value equivalent to the most positive moderator density coefficient (MDC), was obtained by incrementally correcting the MDC used in the FSAR analyses to nominal operating condit'ions.

These corrections involved subtracting the incremental change in the MDC associated with a core condition of all rods inserted (most positive MDC) to an all rods withdrawn condition

and, a conversion for the rate of change of moderator density with temperature at RATED THERMAL POWER conditions.

This value of the HDC was then transformed into the limiting MTC value -42 pcm/ F.

The MTC value of -33 pcm/

F represents a conservative value (with corrections for burnup and soluble boron) at a core condition of 300 ppm equilibrium boron concentration and is obtained by makihg these corrections to the limiting HTC value of -42 pcm/oF.

The Surveillance Requirements for measurement of the MTC at the beginning and near the end of the fuel cycle are adequate to confirm that the HTC remains within its limits since this coefficient changes slowly due principally to the reduction in RCS boron concentration associated with fuel burnup.

3/4. 1. 1. 4 MINIMUM TEHPERATURE FOR CRITICALITY 0

~ ~

This specification ensures that the reactor will not be made critical with the Reactor Coolant System average temperature less than H1'F.

This limitation.

is required to ensure:

(1) the moderator temperature coefficient is within it analyzed temperature

range, (2) the trip instrumentation is within its normal

'+

operating

range, (3) the pressurizer is capable of being in an OPERABLE status with a steam bubble, and (4) the reactor vessel is above its minimum RTNDT temperature.

3/4.1.2 BORATION SYSTEHS The Boron Injection System ensures that negative reactivity control is available during each mode of facility operation.

The components requi0ed to perform this function include:

(1) borated water sources, (2) charging/safety injection

pumps, (3) separate flow paths, (4) boric acid transfer
pumps, arid (5) an emergency power supply from OPERABLE diesel generators.

g/ ~ rage i~

With the RCS average temperature above 350op, a minimum oi wo boron >njeotion flow paths are required to ensure single functiona1 capab'ty in the event an assumed failure renders one of the flow paths inoperabl The boration ca a-bility of either flow path is sufficient to.provide w HUTDOWN MARGIN after xenon decay and cooldown to QoL 200 F.

The maximum expected boration capability requirement occurs at~/from full power equilibrium xenon conditions and requires ~3$ > gallons of 7000 ppm borated water be maintained in the boric acid storage tanks or 436,000 ga1-lons of 2000-2200 ppm borated water be maintained in the refueling water storage tank (RMST).

Ql~+OO Mith the RCS temperature below 350'F, one boron injection flow path is accept-able without single failure consideration on the basis of the stable reactivity SHEARON HARRIS - UNIT 1 B 3/4 1-2

REACTIVITY CONTROL SYSTEMS BASES BORATION SYSTEMS Continued condition of the reactor and the additional restrictions prohibiting CORE ALTERATIONS and positive reactivity changes in the event the single boron injection flow path becomes inoperable.

The limitation for a maximum of one charging/safety injection pump (CSIP) to be OPERABLE and the Surveillance Requirement to verify all CSIPs except the required OPERABLE pump to be inoperable below 335 F provides assurance that a

mass addition pressure transient can be relieved by the operation of a single PORV.

. gd.A bg Spsfjfi~n@W i.

~4m, rgsi4 The boron capability required below 200 F is sufficient to provide~SHUTDOWN MARGIN after xenon decay and cooldown from 200OF to 140'F.

This condition requires either gallons of 7000 ppm borated water be maintained in the boric acid storage tanks or ~I88'allons of 2000-2200 ppm berated water be maintained in the RlfST.

"I,IM The gallons given above are the amounts that need to be maintained in the tank in'the various circumstances.

To get the specified value, each value had added to it an allowance for the unusable volume of water in the tank, allowances for other identified needs, and an allowance for possible instrument error.

In addition, for human factors purposes, the percent indicated levels were then raised to either the next whole percent or the next even percent and the gallon figures rounded off.

This makes the LCO values conservative to the analyzed values.

The specified percent level and gallons differ by less tha'n~

0.3g The limits on conta'ined water volume and boron concentration of the RWST also ensure a pH value of between 8.5 and 11.0 for the solution recirculated within containment after a LOCA.

This pH band minimizes the evolution of iodine and minimizes the effect of chloride and caustic stress corrosion on mechanical systems and components.

The BAT minimum temperature of 65'F ensures that boron solubility is maintained for concentrations of at least the 7750 ppm limit.

The RWST minimum temperature is consistent with the STS value and is based upon other considerations since solubility is not an issue at the specified concentration levels.

The RWST high temperature was selected to be consistent with analytical assumptions for containment heat load.

The OPERABILITY of one Boron Injection System during REFUELING ensures that this system is available for reactivity control while in MOOE 6.

3/4.1.3 MOVABLE CONTROL ASSEMBLIES The specifications of this section ensure that:

(1) acceptable power distri-bution limits are maintained, (2) the minimum SHUTOOWN MARGIN is maintained, and (3)'he potential effects of rod misalignment on associated accident analyses are limited.

OPERABILITY of the control rod position indfcators is required to determine control rod positions and thereby ensure compliance with the control rod alignment and insertion limits.

SHEARON HARRIS - UNIT 1 B 3/4 1-3