Forwards Insp Rept 50-400/88-01 on 880111-15 & Notice of Violation
ML18005A278
Person / Time
Site: Harris 
Issue date: 02/04/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18005A279 List:
References
NUDOCS 8802090597
Download: ML18005A278 (3)


See also: IR 05000400/1988001

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION PIBR: 8802090597

DOC. DATE: 88/02/04

NOTARIZED:

NO

'OCKET ¹

FAC IL:50-400 Shearon

Harris.. Nuclear

Power PlantB Unit

1B Carolina

05000400

~

~

AUTH. NAME

AUTHOR AFFILIATION

HERDTT A. R.

Reg ion 2i

Ofc of the Dir'ec tor

RECIP. NAME

RECIPIENT AFFILIATION

UTLEYIE. E.

Carolina Poeer

h Light Co.

SUBJECT:

Foreards

Insp Rept 50-400/88-01

on 880111-15

5 notice of

violation.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED: LTRi ENCLj SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:Application for permit reneeal filed.

05000400'

RECIPIENT

ID CODE/NAME

PD2-1

PD

INTERNAL: AEOD

NRR

MOR ISSEAUI D

NRR/DOEA DIR

NRR/DREP/RPB

NRR/PMAS/ILRB

OGC/HDS1

RES/DRPS

DlR

EXTERNAL:

LPDR

NSIC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BUCKLEY'S B

DEDRO

NRR/DLPG/PEB

NRR/DREP/EPB

NRR/DRIS DIR

0

BERMANiJ

RGN2

FILE

01

NRC

PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

TOTAL NUMBER OF

COP IES REQUIRED:

LTTR

21

ENCL

. 21

Docket No.

50-.400

License

No.

NPF-63

FEg 0

4. 1988

Carolina

Power and Light Company

ATTN:

Mr,

E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering,

and Construction

P.

0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION

REPORT

NO. 50-400/88-01)

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

J.

R. Harris

on

January

11-15,

1988.

The

inspection

included

a review of

activities authorized for your Shearon

Harris facility.

At the conclusion of

the inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report,

b/ithin

these

areas,

the inspection

consisted

of selective

examinations of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

The inspection

findings indicate that certain activities

appeared

to violate

NRC requirements.

The violations,

references

to pertinent

requirements,

and

elements

to

be included in your response

are described

in the enclosed

Notice

of Violation.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

wi 11

be placed in the

NRC Public Document

Room.

The responses

directed by this letter and its enclosures

are not subject to the

clearance

procedures

of the Office of Management

and Budget as required

by the

Paperwork Reduction Act of 1980,

Pub.

L.

No.96-511.

8802090597

880204

PDR

ADOC)( 05000400

6

PDR

Carolina

Power and Light Company

6

FEB 0

4.1988

Should you have any questions

concerning this letter, please

contact us.

Sincerely,

~e~

a Bl~

~AIen R. Herdt, Chief

Engineering

Branch

Division of Reactor Safety

Enclosures:

1.

Notice of Vio'1ation

2.

NRC Inspection Report

cc w/encls:

W A. Watson,

Vice President

H~rris Nuclear Project

8. L. Tibbitts, Director of Regulatory

Compliance

. Willis, Plant General

Manager,

,bcg w/encls:

. Barth,

OGC

SAC Resident

Inspector

~pchurch,

Chairman, Triangle J

Council of Governments

DRS Technical Assistant

Document Control

Desk

State of North Carolina

RII 'II

JR

rris:tm

T onion

OP/j>, /88

//J /88

PF

drickson