Text
=Docket No. 50-400 Mr'.
E.
E.
U ey Senior Vice President Power Supply and Engineering and Construction Carolina Power 8 Light Company P.
0.
Box 1551
- Raleigh, North Carolina 27602
Dear Mr. Utley:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING PHYSICAL SECURITY PLAN -
SHEARON HARRIS UNIT 1 (TAC 865420)
This is to acknowledge receipt of the Carolina Power and Light Company letters dated September 26 and November 26, 1986, which transmitted a
proposed amendment to the Shearon Harris Nuclear Power Plant, Unit 1, Physical Security Plan in response to the Miscellaneous Amendments and Search Requirements.
The submitted documents have been reviewed and we have determined that additional information and revisions to the plan are required prior to our approvals The enclosed comments are based upon pertinent NRC regu-lations and published guidance describing
- methods, acceptable to the NRC staff, for implementing specific parts of those regulations.
It is requested that you provide your response to these comments within 30 days from receipt of this letter.
The reporting and/or record keeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Should you have any questions concerning the enclosed
- comments, please contact the reviewer, Jane Gibson, at (301) 492-8457.
Sincerely,
Enclosure:
Physical Security Plan Comments cc w/enclosure:
See next page 8708280027 8708i8 jt POR ADEI F
- SEE PREVIOUS CONCURRENCE PAGE Bartholomew C. Buckley, Project Manager Project Directorate II-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation DISTRIBUTION M/ENCLOSURES:
RSGB rf Sec rf" JGibson CBuracker (2)
Region II PAnderson BBuckley
~Docket Fige 50-400 Case Fi 1 e NRC PDR
, RErickson w/o encl Local PDR LBush w/o encl OFC
- RSGB
- RSGB
- RSGB
- RSGB
- PD II-1
- PD NAME:JGibson/an: CBuracker: LBush
- RErickson: PAnderson: BBuckl ey DATE:8/12/87: 8/12/87: 8/12/87: 8/12/87 ":8/14/87,: 8/I(/87
(a I
t P
1 I \\
II H
l 1
I'
0 ygO Mr. E.
E. Utley
.Carolina Power 5 Light Company CC:
Thomas A. Baxter,
- Esq, Shaw, Pittman, Potts 5 Trowbridge 2300 N Street, NW Washington, DC 20037 Mr. D. E. Hollar Associate General Council Carolina Power 5 Light Company P.O.
Box 1551 Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission Route 1, Box 315B New Hill, North Carolina 27562 Mr. R. A. Watson Vice President Harris Nuclear Plant P.O.
Box 165 New Hill, North Carolina 27562 Shearon Harris Ms. Carol Love 100 Park Drive P.O.
Box 12276 Research Triangle Park, NC 27709 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30303 Mr. J. L. Willis Plant General Manager Harris Nuclear Plant P.O.
Box 165 New Hill North Carolina 27562 Mr. Dayne H. Brown, Chief Radiation Protection Section Division of Facility Services N.C. Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008
Docket No. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT COMMENTS ON PHYSICAL SECURITY PLAN CHANGES (MISCELLANEOUS AMENDMENTS AND SEARCH REQUIREMENTS)
Provide a schedule for implementing the amended safeguards requirements within 180 days after Commission approval of the proposed security plan.
Reference 10 CFR 73.55.
State that vital area access controls will not be dropped for life threatening situations not involving public health and safety.
Reference 10 CFR 50.54(x) and (y) and Generic Letter 87-08 (Q&A ¹3).
Provide a commitment that the search re uirements will be implemented within 60 days after Commission approval of the proposed revisions.
Reference 10 CFR 73 55(d)(1).
Provide a commitment that if security force members leave the protected area to perform official duties subsequent to their initial entry and search, they will be searched prior to re-entry into the protected area if they have not been under direct observation or accompanied by another member of the security force.
Reference 10 CFR 73.55(d)(1) and Generic Letter 87"08 (Q8A ¹11).
Expand your commitment to ensure prompt access to vital equipment to accommodate the potential need for rapid ingress or egress of individuals during emergency conditions or situations.
Indicate how this rom t access will be ensured e.
b issuin override ke s to a ro riate o erators and securit force members at the start of each shift or b
other acce table means Reference 10 CFR 73.55 d
7 ii and Generic Letter 87-08 8A ¹6 Expand your commitment to periodically (annually) review physical security and contingency plans and procedures to evaluate their otential im act on lant and ersonnel safet Reference 10 CFR 73.55(d)(7)(ii)(B) and Regulatory Guide 5.65, paragraph
- 6. 1.
Indicate what components of the secondary power supply system will be protected as vital.
Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q8A ¹18).
Provide a commitment to maintain a log indicating name, badge
- number, time of
- entry, and time of exit of all individuals granted access to a vital area except those individuals entering or exiting the reactor control room.
Reference 10 CFR 73.70(d) and Regulatory Guide 5.65, paragraph 3.2.