ML18004B858
| ML18004B858 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/16/1987 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18004B859 | List: |
| References | |
| NUDOCS 8706250326 | |
| Download: ML18004B858 (3) | |
See also: IR 05000400/1987019
Text
ACCESSION
NBR:
l
FACIL: 50-400
AUTH. NAME
RRELLIi D. M.
EC IP. NAME
UTLEY. E. E.
REGUl ATQRY INFORMATION 9 lSTR IBUTION SYSTEM
(R IDS )
8706250326
DQC. DATE: 87/06/16
NOTARIZED:
NO
Shearon Harris Nuclear
Power Planti Unit ii Carolina
AUTHOP, AFFILIATiON
Peg ion 2i
0","fice of Director
RECIPIENT AFFiLIATiON
Carolina
Poeer
Zc Light Co.
DOCKET
05000400
05000400
SUBJECT:
Fo7 cards
Insp
Rep t 50-400/87-1'P
on 870420-0520.
No violat ions
or deviations
noted.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED: LTRi ENCL
~
SIZE:
TITLE: General
(50 Dkt)-Insp Pept/Notice
of Violation Response
h
'
NOTES: Application for permit reneeal filed.
REC IP IENT
ID CODE/NAME
PD2-1
COP IES
LTTR ENCL
1
REC IP IENT
ID CODE/NAME
BUCKLEYIB
CQP IFS
LTTR ENCL
2
2
INTERNAL:
DEDRO
NRR ROE'. L
NRR/DREP/EPB
NRR/DRIS DIR
QGC/HDS1
DEPY GI
RNAL:
LPDR
2
2
1
1
1
1
1
1
1
1
1
1
1
AEQD
ENF LIEBERMAN
NRR/DOEA DIR
NRR/DREP/RPB
NRR/PMAS/ ILRB
G F L
FILE
01
NRC
1
1
1
2
2
1
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
22
ENCL
22
Oocket No. 50-400
License
No.
JUN 16
$55
Carolina
Power
and Light Company
ATTN
Mr. E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
NRC INSPECTION
REPORT
NO. 50-400/87-19
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
G.
F. Maxwell
on April 20 - May 20,
1987.
The inspection
included
a review of
activities
authorized
for your Harris facility.
At the
conclusion
of the
inspection,
the
findings
were
discussed
with those
members
of your staff
- identified in the enclosed
inspection report.
Areas
examined
during
the
inspection
are
identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
I
Within the
scope
of the inspection,
no violations or deviations
were identi-
fied.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part
2,
Title 10,
Code of Federal
Regulations,
a copy of this letter. and its enclosure
will be placed in the
NRC Public Oocument
Room.
Should you have
any questions
concerning this letter, please
contact
us.
Sincerely,
os~'avid
M. Verrelli, Chief
Reactor Projects
Branch
1
Oivision of Reactor Projects
Enclosure:
NRC Inspe'ction
Report
cc w/encl:
(See
page
2)
BP0625032b
87>000400
PDP
/DOCK 0
Q
Carolina
Power
and Light Company
cc w/encl:
R.. A. Watson,
Vice President
Harris Nuclear Project
.
. D. L. Tibbitts, Director of Regulatory
Compliance
. J ~L. Willis, Plant General
Manager