Forwards Insp Rept 50-400/87-19 on 870420-0520.No Violations or Deviations Noted
ML18004B858
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/16/1987
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18004B859 List:
References
NUDOCS 8706250326
Download: ML18004B858 (3)


See also: IR 05000400/1987019

Text

ACCESSION

NBR:

l

FACIL: 50-400

AUTH. NAME

RRELLIi D. M.

EC IP. NAME

UTLEY. E. E.

REGUl ATQRY INFORMATION 9 lSTR IBUTION SYSTEM

(R IDS )

8706250326

DQC. DATE: 87/06/16

NOTARIZED:

NO

Shearon Harris Nuclear

Power Planti Unit ii Carolina

AUTHOP, AFFILIATiON

Peg ion 2i

0","fice of Director

RECIPIENT AFFiLIATiON

Carolina

Poeer

Zc Light Co.

DOCKET

05000400

05000400

SUBJECT:

Fo7 cards

Insp

Rep t 50-400/87-1'P

on 870420-0520.

No violat ions

or deviations

noted.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED: LTRi ENCL

~

SIZE:

TITLE: General

(50 Dkt)-Insp Pept/Notice

of Violation Response

h

'

NOTES: Application for permit reneeal filed.

REC IP IENT

ID CODE/NAME

PD2-1

PD

COP IES

LTTR ENCL

1

REC IP IENT

ID CODE/NAME

BUCKLEYIB

CQP IFS

LTTR ENCL

2

2

INTERNAL:

ACRS

DEDRO

NRR ROE'. L

NRR/DREP/EPB

NRR/DRIS DIR

QGC/HDS1

RES

DEPY GI

RNAL:

LPDR

NSIC

2

2

1

1

1

1

1

1

1

1

1

1

1

AEQD

ENF LIEBERMAN

NRR/DOEA DIR

NRR/DREP/RPB

NRR/PMAS/ ILRB

G F L

FILE

01

NRC

PDR

1

1

1

2

2

1

1

1

1

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

22

ENCL

22

Oocket No. 50-400

License

No.

NPF-53

JUN 16

$55

Carolina

Power

and Light Company

ATTN

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NO. 50-400/87-19

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

G.

F. Maxwell

on April 20 - May 20,

1987.

The inspection

included

a review of

activities

authorized

for your Harris facility.

At the

conclusion

of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

I

Within the

scope

of the inspection,

no violations or deviations

were identi-

fied.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part

2,

Title 10,

Code of Federal

Regulations,

a copy of this letter. and its enclosure

will be placed in the

NRC Public Oocument

Room.

Should you have

any questions

concerning this letter, please

contact

us.

Sincerely,

os~'avid

M. Verrelli, Chief

Reactor Projects

Branch

1

Oivision of Reactor Projects

Enclosure:

NRC Inspe'ction

Report

cc w/encl:

(See

page

2)

BP0625032b

87>000400

PDP

/DOCK 0

Q

Carolina

Power

and Light Company

cc w/encl:

R.. A. Watson,

Vice President

Harris Nuclear Project

.

. D. L. Tibbitts, Director of Regulatory

Compliance

. J ~L. Willis, Plant General

Manager

bcc w/encl:

Cc'.Barth,

OGC

'RC

Resident

Inspector

Document Control

Desk

St:ate of North Carolina