Text
" A(.'CES>IQN NBR
FACIL'0-400
AUTH. N*XE
ERDTi A. R.
REC IP. NANE
UTLEYiE. E.
REGULATORY INFORl'lATION DISTRIBUTION SYSTEN (RIDS)
8706150230
DOC. DATE: 87/05/14
NOTARIZED:
NO
Shearon
Hart is Nuclear
Power Planti Unit ii Carolina
AUTHOR AFFIf IATION
Region
2i
Qffice of Director
REC IP IENT AFFILIATION
Car olina
PoUJer
Sc Light Co.
DOCKET
@
05000400
SUBJECT:
Foreards
Insp Rept 50-400/87-16
on 870406-10.
No violations
noted.
DISTRIBUTlON CODE:
IE01D
COPIES
RECEIVED: LTR
ENCL
SIZE:
,TITLE: General
(50 Dkt)-Insp Rept/Notice
of Violation Response
NOTES: Application for permit renewal filed.
05000400
RECIPIENT
ID CODE/NANE
PD2-1
LA
BUCKLEY'S B
INTERNAL:
DEDRO
NRR ROE'. L
NRR/DREP/EPB
NRR/DR IS DIR
OGC/HDS1
DEPY GI
TERNAL:
LPDR
COPIES
LTTR ENCL
1
0
2
2
2,
2
1
1
1
1
1
1
1
1
1
RECIPIENT,
ID CODE/NAME
PD2-1
ENF LIEBERNAN
NRR/DOEA DlR
NRR/DREP/RPB
R&bRNA
ILRB
REG FILE
R
FILE
01
NRC
COPIES
LTTR ENCL
1
1
1
2
2
1
1
1
1
1
TOTAL NUMBER QF
CQP IES
REQUIRED:
LTTR
23
ENCL
22
Docket No. 50-400
License
No.
NPF-53'ro'lina
Power
and Light Company
ATTN:
Mr. E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NO. 50-400/87-16
This refers
to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
P. T. Burnett
on April 6-10,
1987.
The inspection
included
a review of
activities authorized
for your Harris facility.
At the conclusion of the
inspection,
the
findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews
with personnel,
and
observation
of
activities in progress.
Within the
scope
of the
inspection,
no violations
or deviations
were
identified.
In accordance
with Section
2.790 of the
NRC's
"Ru'ies of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have any questions
concerning this letter,
please
contact us.
Sincerely,
Enclosure:
(See
page
2)
Alan R. Herdt, Chief
Engineering
Branch
Division of Reactor Safety
gDOQ~ 8
5~4
8706i502
OCR 05000400
MAY 1 4 188T
Carolina
Power and Light Company
Enclosure:
NRC Inspection
Report
c w/encl:
. A. Watson,
Vice President
Harris Nuclear Project
D. L. Tibbitts, Director of Regulatory
ompliance
. L. Willis, Plant General
Manager
c w/encl:
C~arth,
~ Moore,
RC Resident
Inspector
Document Control
Desk
State of South Carolina
RI I
1
Plurne t:er
Q/(( /8
RI I
FJa
e
RI I~g~
PFyedrickson
0f/]~/87