Forwards Preoperational Leak Test Results from Leak Reduction Program.Sys Included in Program Listed.Leak Testing Activities Performed on Mechanical Joints & Seals of Various Components of Each Applicable Sys
ML18004B524
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/15/1986
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NLS-86-390, NUDOCS 8610240091
Download: ML18004B524 (18)


Text

REQUL Y INFORMATION DISTRIBUTI SYSTEN (R IDS)

ACCESSION NBR: 8610240091 DOC. DATE: 86/10/15 NOTARIZED:

NO DOCKET 0 FACIL:50-400 Shearon Harris Nuclear Power Planti Unit 1. Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ZINNERNANiS. R.

Carolina Potoer 5 Light Co.

REC IP. NANE REC IPIENT AFFILI AT ION DENTONi H. R.

Of'fice of Nuclear Reactor Regulationi Director (post S51125

SUBJECT:

Fortaards preoperational leak test results from leak reduction program. Sgs included in program listed. Leak testing activities performed on mechanical points i( seals of various components oP each applicable sos.

I DISTRIBUTION CODE'001D COPIES RECEIVED'TR ENCL SI ZE:

TITLE: Licensing Submittal:

PSAR/FSAR Amdts 8c Related Correspondence NOTES:Application for permit renewal filed.

05000400 RECIPIENT ID CODE/NANE PWR-A EB PWR-A FOB PWR-A PD2 PD PWR-A PSB INTERNAL ADN/LFNB IE FILE IE/DGAVT/GAB 21 NRR PWR-B ADTS NRR/DHFT/NTB RQN2 EXTERNAL: BNL(ANDTS ONLY)

LPDR 03 NSIC 05 COPIES LTTR ENCL 1

1 1

1 1

0 1

1 1

1 1

0 1

1 3

3 1

1 1

1 RECIPIENT ID CODE/NANE PWR-A EICSB PWR-A PD2 LA BUCKLEY'S B 01 PWR-A RSB ELD/HDSi IE/DEPER/EPB 36 NRR BWR ADTS NR.

L 04 R

ANI/NIB DMB/DSS (ANDTS)

NRC PDR 02 PNL GRUEL' COPIES LTTR ENCL 2

2 1

1 2

2 1

1 0

1 0

1 1

0 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 30 ENCL 25

A 1 "Y,'v tA'l, ilk',<>> fv>>SI "I (J

(rw4. I

~A'AAA

(.

A 11"

'.'1

1 1

>> (} lh>> j Av>>l )r 0 I

k.

>>IA((AII j v 1

1 1>>

Y hv

'.".'".l I l IAA

~ v."A.

')h,

'7lv

' j,l;t, "II'

. j I

Aj AI>>A 1 jt'"

>>i'TI:

,.}v.

jjA5-'A r-l 1

'.t Aj

'I II

'1 A

v lt

.AI, l

~ 1 All

'i (d

1 jv

, 'i(>>'

li

"'I I',, h h.h t'Ci 1,>>

"'j " 'e'

~ j,,Q gll 1

II

> (ACQ,

) 4>

l""j'lgl' 5>>

(A j ',

P, v

Al 1

VIP>>V>>l

~ XA>>>vf'=!I'.

v l ')$jvg l,t A 5*)

]

A 'I

<<'> X'~

'AR l'v A

J 1,

fkl j>>

I v vll A,

1 1

lr) h

)hll l, r 1

jt)~" I

%PI 1

>>* l 1

g>>

1 I I

>>vh A.Vr "'"')A,

,f jQ ",'

)AA(

" j'j:'I5j v"lj'h v

<<;Cj l (>>

h \\,'ll

>>.Av 4,;( 1

~" j ~

1 "iv l "

A(rjlg

'>> 'l') )

~ )

SNK Carolina Power 8 Light Company OCT 1S SERIAL: NLS-86-390 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO.

1 - DOCKET NO.50-000 LEAK REDUCTION PROGRAM

Dear Mr. Denton:

Carolina Power R Light Company (CPRL) hereby submits the preoperational leak test results from the Shearon Harris Nuclear Power Plant (SHNPP) Leak Reduction Program.

By letters dated September 21, 1983 and 3uly 11, 1980, CPRL submitted a description of the program to reduce leakage from systems outside containment that could contain primary coolant or highly radioactive fluids during a serious transient or accident.

The following systems were included as part of the program:

Residual Heat Removal Safety Injection System, except Boron Injection Recirculation Subsystem Containment Spray System except Boron Injection Recirculation Subsystem i'WST Chemical Volume R Control System:

Letdown Subsystem Boron Recycle Hold-Up Tank Charging Pumps Demineralizers Seal Water Return System Post-Accident Sample System Post-Accident RAB Ventilation System Valve Leakoff Equipment Drain System Gaseous Waste Processing System Leak testing activities were performed on mechanical joints and seals of various components of each applicable system.

Actual leakage observed was corrected during the testing activities to the maximum extent possible.

Leakage not corrected during the testing activities was documented and compared against the acceptance criteria of the Leak Reduction Program.

In all cases, except for the Gaseous Waste Processing Analyzers, leakage was reduced to as-low-as-practical levels and is acceptable in accordance with the criteria of the Leak Reduction Program.

Repair activities are currently being performed on the Gaseous Waste Processing Analyzers to correct leakage observed and bring the Gaseous Waste Processing System within its acceptance criteria.

8bi024009i 8biOi5 PDR ADDCK 05000400 A

PDR 411 Fayettevilte Street o P. O. Box 1551

~ Raleigh. N. C. 27602 ooi

l ~

,. Mr. Harold R. Denton NLS-86-390 / Page 2

The test results for each system are attached.

We consider the reporting requirements of this item to be closed. If you have any questions on this subject or require additional information, please contact me at (919) 836-6202.

Yours very truly, 3HE/mf (50283DK)

Enclosure S. R. Zim an Manager Nuclear Licensing Section cc:

Mr. B. C. Buckley (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Dr. 3. Nelson Grace (NRC-RII)

II

A.)

~S stem:

Residual Heat Removal/Iow Head Safety Injection.

Reference Drawin s:

2165-G-810, 824 (see Drawings for Identification of Test Boundary)

Test Conditions:

Test Pressure:

172 PSIG Leaka e Observed:

Valve 1-RH-30 (12 drops per min)

Valve 1-RH-58 (4 drops per min)

Acce tance Criteria:

Less than 3

GPM Test Results:

Acceptable

- Ieakage observed was extrapolated for normal operating system pressure and was evaluated to be within the acceptance criteria.

WKLB01/MS861426/OS2

B. )

System:

Saf ety Injection Reference Drawings:

2165-G-808, 2165-G-810, 824 (see Drawings for Identification of Test Boundary).

Test Conditions:

Test pressure:

2700 PSIG Leakage Observed:

None Acceptable Criteria:

Less than 3

GPN Test Results:

Acceptable

C.)

~S atam:

Containmant Spray ("A" and "B" Traina)

Reference Drawin s:

2165-G-050 (see Drawing for Identification of Test Boundary).

Test Conditions:

Test pressures:

245 to 265 PSIG Leaka e Observed:

None Acce table Criteria:

Less than 3

GPM Test Results:

Acceptable WKLB01/MS861426/OS2

D.)

~S atem:

Chemical and Volume Control Reference Drawin s:

2165-G-803,

804, 805,
810, 824 (see Drawings for Identification of Test Boundary).

Test Conditions:

Test pressure:

175 to 2700 PSIG depending upon required systems operating pressure.

Leaka e Observed:

Valve 1-CS-340 (2 drops per min.)

1-FT-127 (30 drops per min.)

1"FT-122 (60 drops per min.)

PDT-726 (6 drops per min,)

Valve 1-CS-182 (4 drops per min.)

Acce table Criteria:

Less than 3

GPM Test Results:

Acceptable WKLBOl/MS861426/OS2

~

~

L

(

~

I

~ Pal

E.)

~S stem:

Post-Accident Sampling Reference Drawin s:

2165-G-052, 2165-S-0552 S02 (see Drawings for Identification of Test Boundary).

Test Conditions:

Test Pressures:

22 PSIG to 2700 PSIG depending upon required systems operating pressure.

Leaka e Observed:

None Acce table Criteria:

Less than 3

GPM (Liquid side)

No leakage (Gaseous side)

Test Results:

Acceptable WKLB01/MS861426/OS2

F.)

~g stem:

Post-Accident RAB Ventilation (RAB Emergency Exhaust)

Reference Drawin s:

2168-G-517,

S02, S03 (see Drawings for Identification of System).

Test Conditions:

Test conditions were established under EBASCO Specifications CAR-SH-BE-28 and 28A (Housings and Mounting Frames) and CAR-SH-BE-04A (Ducts).

These documents are avai.lable at the plant site for review.

Leaka e Observed:

See Attachment (1)

Acce table Criteria:

See Attachment (1)

Test Results:

Acceptable WKLB01/MS861426/OS2

a V'

~ f

~ g

~

~ p

~

Attachment (1)

. Sections Examined:

RAB EMERGENCY EXHAUST SUBSYSTEM LEAKAGE TEST RESULTS RFT 8210.008*

Suction (Negative Pressure)

RFT 8210.007 Unit Housing and Discharge (Positive Pressure)

TEST NUMBER RFT DESCRIPTION ALLOWABLE LEAKAGE SCFM ACTUAL LEAKAGE SCFM T"16'07 T-16D.007 T-16E.007 T-16F.007 T-16G.007 T-16-0.007 T-16-0-1.007 T-16-N.007 T-16-N-1.007 T-16-H.008 T"16J.008 T-16K.008 T-16M.008 E-6B Unit Housing E-6A Unit Housing B DISCH A DISCH A-B Crossover B-Housing HEPA PRE

& AFTER (B)

A Housing HEPA PRE 6 AFTER (A)

B Suction B Suction B Suction A Suction

2. 16 2.16 1.18 0.39 0.67 1.47 0.68 (ACFM) 1.47 0'8 (ACFM)

NA NA NA NA 0.38 1.06 0.64 0.13 0.0 1.15 0.36 (ACFM) 0.92 0.23 (ACFM) 2.9 22.21 7.45 26.21

+Suction Tests are non-quantitative.

Actual measured leakages are for information only.

WKLB01/MS861426/OS2

~ e

\\

G.)

~E stem:

Valve Eeakoff Equipment Drain Reference Drawin s:

2168-G-184,

185, 187, 814 (see Drawings for Identification of Test Boundary).

Test Conditions:

Test Pressure:

Normal 0 eratin Leaka e Observed:

None Acce table Criteria:

Less than 3

GPM Test Results:

Acceptable MKLBOl/MS861426/OS2

~ %

Cg lt

eae

~

e

~

(

e e

~

H.)

~S stem:

Gaseous Haste Ptocessiug Reference Drawin s:

2168-G-817, 818 (see Drawings for Identification of Test Boundary).

Test Conditions:

Majority of system was tested under SUM 1-7970-C-02 and 1-7070-H-Ol.

The balance of system not covered by one of the above referenced preoperational tests was helium leak tested under the Leakage Reduction Program.

The three (3) 0 Analyzers (recombiner common OUTLET (1 EA.) and recombiner-INLETS (2 EA,))

are currently under repair, and will be tested upon the completion of repair activities.

Leaka e Observed:

Yes Acce table Criteria:

No Leakage Test Results:

Repair activities are currently being performed on above identified Analyzers to correct leakage observed.

The balance of gaseous waste processing was found to be acceptable.

WKLB01/MS861426/OS2