ML18004A545
| ML18004A545 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/23/1986 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18004A546 | List: |
| References | |
| NUDOCS 8610060036 | |
| Download: ML18004A545 (2) | |
See also: IR 05000400/1986060
Text
~ I
Docket No. 50-400
License
No.
CPPR-158
SgP
2 8 1S86
Carolina
Power and Light Company
TATTM:
Mr.
E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box
1SS1
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
(NRC INSPECTION
REPORT
NO. 50-400/86-60)
This refers
to the
Nuclear
Regulatory
Commission
(NRC) inspection
conducted
by
G.
F. Maxwell on July 20 - August 20,
1986.
The inspection
included
a review of
activities
. authorized
for
your
Harris facility.
At the
conclusion
of the
inspection,
the
findings
were
discussed
with
those
member s
of your staff
identified in the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation of activities
in progress.
The inspection findings indicate that certain activities appeared
to violate
NRC
requirements.
The violation, with references
to pertinent
requirements,
and
elements
to be included in your response
are described
in the enclosed
Notice of
Violation.
Your attention
is invited to unresolved
items identified in the
inspection
report.
These matters will be pursued
during future inspections.
In accordance
with Section
2.7.90 of the
NRC's "Rules of Practice,"
Part 2, Title 10,
Code of
Federal
Regulations,
a copy of this letter and its enclosures
will be placed
in
the
NRC Public
Document
Room.
The
responses
directed
by this letter
and its
enclosures
are
not
subject
to
the
clearance
procedures
of the
Office of
Management
and
Budget
as required
by the
Paperwork
Reduction
Act of'980,
PL
96-511.
aelooeoooe,
seo9zot
I
]
- DOCK 05000400
. 8
David M. Verrelli, Chief
Reactor Projects
Branch
2
Division of Reactor
Projects
Enclosures:
(See
page
2)
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
ORloi~lAL 5~c'"'"" "Y
DAYl0 M VERRELU
~ .'c
gyp 23
1S86
Caroli'na
Power and Light Company
Enclosures:
1.
2.
NRC Inspection
Report
cc w/encl:
Q.
A. Watson,
Vice President
Harris Nuclear Project
VJ.
L. Willis, Plant General
Manager
v0.
L. Tibbitts, Director of
Regulatory Compliance
bcc w/encl:
Document Control
Desk
tate of North Carolina
NRC Resident
Inspector
Melle .him
/(p 786
Fredrickson
/Ib/86
B
c
9/
/86