ML18004A545

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/86-60 on 860720-0820 & Notice of Violation
ML18004A545
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/23/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18004A546 List:
References
NUDOCS 8610060036
Download: ML18004A545 (2)


See also: IR 05000400/1986060

Text

~ I

Docket No. 50-400

License

No.

CPPR-158

SgP

2 8 1S86

Carolina

Power and Light Company

TATTM:

Mr.

E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box

1SS1

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION

REPORT

NO. 50-400/86-60)

This refers

to the

Nuclear

Regulatory

Commission

(NRC) inspection

conducted

by

G.

F. Maxwell on July 20 - August 20,

1986.

The inspection

included

a review of

activities

. authorized

for

your

Harris facility.

At the

conclusion

of the

inspection,

the

findings

were

discussed

with

those

member s

of your staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

in progress.

The inspection findings indicate that certain activities appeared

to violate

NRC

requirements.

The violation, with references

to pertinent

requirements,

and

elements

to be included in your response

are described

in the enclosed

Notice of

Violation.

Your attention

is invited to unresolved

items identified in the

inspection

report.

These matters will be pursued

during future inspections.

In accordance

with Section

2.7.90 of the

NRC's "Rules of Practice,"

Part 2, Title 10,

Code of

Federal

Regulations,

a copy of this letter and its enclosures

will be placed

in

the

NRC Public

Document

Room.

The

responses

directed

by this letter

and its

enclosures

are

not

subject

to

the

clearance

procedures

of the

Office of

Management

and

Budget

as required

by the

Paperwork

Reduction

Act of'980,

PL

96-511.

aelooeoooe,

seo9zot

I

]

PDR

  • DOCK 05000400

. 8

PDR

David M. Verrelli, Chief

Reactor Projects

Branch

2

Division of Reactor

Projects

Enclosures:

(See

page

2)

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

ORloi~lAL 5~c'"'"" "Y

DAYl0 M VERRELU

~ .'c

gyp 23

1S86

Caroli'na

Power and Light Company

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

cc w/encl:

Q.

A. Watson,

Vice President

Harris Nuclear Project

VJ.

L. Willis, Plant General

Manager

v0.

L. Tibbitts, Director of

Regulatory Compliance

bcc w/encl:

Document Control

Desk

tate of North Carolina

NRC Resident

Inspector

Melle .him

/(p 786

Fredrickson

/Ib/86

B

c

9/

/86