ML18004A501

From kanterella
Jump to navigation Jump to search
Submits Info Re ECCS Performance During Operations in Modes 3 & 4.Westinghouse Owners Group Resolution Re Concern Associated W/Loca During Mode 3 & 4 Operations Adopted
ML18004A501
Person / Time
Site: Harris 
Issue date: 08/26/1986
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NLS-86-320, NUDOCS 8609020150
Download: ML18004A501 (40)


Text

REQULr>

RY INFORifATION DISTR IBUTl&i SYSTEf f

( R IDS)

ACCESSION NBR: 8609020150 DOC. DATE: 86/08/26 NOTARIZED:

NO DOCKET I FACIL: 50-400 Shearon Harv is Nucleav Power Planti Unit ii Carolina 05000400 AUTH. NAl'lE AUTHOR AFFILIATION Zli'fNERi'fAN~S. R.

Carolina Power Cc Light Co.

RECIP. NAl'lE RECIPIENT AFFILIATION DENTON, H. R.

Office of Nuclear Reactor Regulation>

Div ec tov'p ost 85ii25

SUBJECT:

Submits info re ECCS pev fov mance during opev'ations in ifodes 3

8< 4. Westinghouse Owners Group resolution re concevn associated w/LOCA duv ing trode 3 5 4 operations adopted.

DISTRIBUTION CODE:

900ID CQPIEB RECEIVED: LTR i ENCL 0 BI IE:

TITLE: Licensing Submittal:

PSAR/FSAR Amdts Zc Related Cov'respondence NOTES: Application f'ov pev mi t v enewal filed.

05000400 RECIPIENT ID CODE/NANE PNR-A EB PWR-A FOB PWR-A PD2 PD PNR-* PSB INTERNAL: ADf'f/LFi'fB IE/DGAVT/GAB 2i NRR PMR-B ADTS NRR/DHFT/iaaf TB RGN2 EXTERNAL: BNL(ANDTS ONLY)

LPDR 03 NSIC 05 COP IES LTTR ENCL RECIPIENT ID CODE/NAf'fE PWR-A EICSB PWR-A PD2 LA BUCKLEY> B Oi PWR-A RSB ELD/HDSi IE/DEPER/EPB 36 NRR BWR ADTS NRR L

04 RN/DDAl'fI/NIB DNB/DSS (ANDTS)

NRC PDR 02 PNL GRUEL> R COP IES LTTR ENCL 2

TOTAL NUNBER QP COPIEB REQUIRED:

LTTR BO ENCL

.I P

I 1

'N )

II' I,

~,

t'I

@ME Carolina Power & Light Company SERIAL: NLS-86-320 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. I DOCKET NO.50-000 EMERGENCY CORE COOLING SYSTEM (ECCS) PERFORMANCE DURING MODES 3 AND 0

Dear Mr. Denton:

Carolina Power R Light Company (CPRL) hereby submits information concerning the Shearon Harris Nuclear Power Plant (SHNPP) ECCS performance during operations in Modes 3 and 0.

By letter dated 3une 20, l986, Westinghouse notified the staff of a potential concern associated with a loss of coolant accident during operations in Modes 3 and 0 with certain ECCS equipment unavailable.

Carolina Power R Light Company has evaluated this concern and has determined that additional analyses may be required.

As a member of the Westinghouse Owners'roup (WOG), CPRL hereby commits to adopt the WOG resolution of this concern.

If you have any questions or require additional information on this subject, please contact me at (919) 836-6202.

Yours very truly, JHE/mf (00603DK) cc:

Mr. B. C. Buckley (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Dr. J. Nelson Grace (NRC-RII)

. R. Zim erman ager Nuclear Licensing Section s~o ocr o>ooo4oo 09020150 ab082+

pDR pDR

~ A 411 Fayettevilte Street

~ P. O. Box 1551 o Raleigh, N. C. 27602

/oct t a(tt

c rt 686

~."~

v'U>>

'1 I

%4$g+

Distribution Sheet Distri50.txt g/jggMDD Priority: Normal From: Stefanie Fountain Action Recipients:

RidsNrrPMRLaufer R Laufer Internal Recipients:

RidsRgn2MailCenter RidsResDraaOerab RidsOcfoDpbaPab Rids Manager RidsAcrsAcnwMailCenter RGN2 RES/DRAA/OERAB OCFO PPj3A LE CENTER 01 ACRS External Recipients:

NOAC INEEL Marshall Copies:

0 'K 1

Paper Copy 0

0 0

OK OK OK OK Paper Copy Paper Copy 0

OK Paper Copy 1

Paper Copy 1

Paper Copy 1

Paper Copy Paper Copy Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID'03693271:1

Subject:

Monthly operating report for February 2000 for Shearon Harris Nuclear Power Plant. Wit h letter dated 3/14/00.

Body:

ADAMS DISTRIBUTION NOTIFICATION.

Electronic Recipients can RIGHT CLICKand OPEN the first Attachment to View the Document in ADAMS. The Document may also be viewed by searching for Accession Number ML003693271.

Page 1

Distri50.txt lE24-Monthly Operating Report (per Tech Specs)

Docket: 05000400 Page 2

Carolina Power & light Company Harris Nuclear Plant P.O. Box 165 New HillNC 27562 Serial: HNP-00-048 MAR 14 gppp United States Nuclear Regulatory Commission ATTENTIO¹ Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF;63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power &Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of February 2000 is provided.

I ~

Sincerely, D. B. Alexander Manager, Regulatory Affairs Harris Nuclear Plant SGR Enclosure c:

Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)

Mr. R. J. Laufer (NRC Project Manager, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II),

5413 Shearon Harris Road New Hill NC

I I

P i ~

E C

I 4

I I

\\

Enclosure to Serial HNP-00-048 Sheet 1 of 3 CPScL CO.

RUN DATE 03/01/00 RUN TIME 11:11:38 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1

RPD36-000 OPERATING STATUS DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573

1. UNIT NAME:

HARRIS UNIT 1 2.

REPORTING PERIOD:

FEBRUARY 00 3.

LICENSED THERMAL POWER (MWT):

2775 4.

NAMEPLATE RATING (GROSS MWE):

950.9 5.

DESIGN ELECTRXCAL RATING (NET MWE):

900.0 6.

MAX DEPENDABLE CAPACZTY (GROSS MWE): 920.0 7.

MAX DEPENDABLE CAPACITY (NET MWE):

860.0 8.

ZF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

10.

REASONS FOR RESTRICTZON IF ANY:

THIS MONTH YR TO DATE CUMUL ATZVE 11.

HOURS IN REPORTING PERIOD 12.

NUMBER OF HOURS REACTOR CRITICAL 13.

REACTOR RESERVE SHUTDOWN HRS 14.

HOURS GENERATOR ON LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GEN.

(MWH) 17.

GROSS ELEC.

ENERGY GEN (MWH) 18.

NET ELEC.

ENERGY GENERATED (MWH) 19.

UNIT SERVICE FACTOR 20.

UNIT AVAXLABXLITYFACTOR 21.

UNIT CAP.

FACTOR (USZNG MDC NET)

22. UNIT CAP.

FACTOR (USING DER NET)

23. UNIT FORCED OUTAGE RATE 24.

SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS 696.00 696.00

.00 696.00

.00 1920897.18 643483.00 604394.00 100.00 100.00 100.97 96.49

.00 (TYPE,

DATE, 112489.00 96240.56

.00 95311. 00

.00 256630386.06 85399110.00 79736163.00 84.73 84.73 82.42 78.76 3.06 1440.00 1440.00

.00 1440.00

.00 3974901.12 1335995.00 1255142.00 100.00 100.00 101.35 96.85

.00 AND DURATION OF BACH):

Plant Refueling Outage number 9 is planned to begin April 15,

2000, and is scheduled for a duration of 35 days.
25. IF SHUTDOWN AT END OF REPORT PERIODS ESTIMATED DATE OF START UP:

26.

UNITS IN TEST STATUS (PRIOR TO COMMERCZAL OPERATION):

FORECAST ACHIEVED INZTZAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

~

I h

I

'1t h

~

(

~

Enclosure to Serial: HNP-00-048 Sheet2of3 CP(cL CO.

PLANT PERFORMANCE DATA SYSTEM RUN DATE 03/01/00 APPENDIX B - AVERAGE DAILY POWER LEVEL RUN TIME 11:11:38 HARRIS UNIT 1 PAGE 1

RPD39-000 FEBRUARY 2000 DAY AVG. DAILY POWER LEVEL (MWE-NET)

DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG. DAILY POWER LEVEL (MWE-NET) 10 12 13 15

,16 879 878 878 877 878 859 837 855 874 870 841 872 864 876 872 17 18 19 20 21 22 23 25 26 27 28 29 876 877 865 877 877 875 872 867 865 866 865 875 873

A I>>~

UNITNAME:

Hams DATE:

02/29/00 COMPLETED BY: S. G. Rogers TELEPHOiVE:

(919) 362-2573 REPORT MONTH: February 2000 UNITSHUTDOWNS ANDPOWER REDUCrlON Enclosure'to, Serial: HNP-00-048 Sheet 3 of 3; NUMBER DATE 02/12/00 TYPE I

DURATION (HOURS 0.0 REASON 2 MEIHODOF SHUITINGDOWN REACIOR 3 LICENSEE EVENT REPORT/I NA SYSTEM CODE 4 COMPONENT CODE 5 VALVEX CAUSE AND CORRECTIVE ACPION TO PREVENT RECURRENCE Phut reduced power to 80%

at 00:06 on 2/12/00 to perform quarterly Turbine Valve testing. Testing was completed satisfactory and plant was returned to 100%

weron 2/12/00 I07:00 I

F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C.Refueling D-Regulatory Restriction E-Operator Training 8c License Examination

.- F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation ofData Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Same Source

/j/gZOdP Distribution Sheet Distri41.txt Priority: Normal From: Elaine Walker Action Recipients:

RidsNrrPMRLaufer R Laufer Copies:

1 OK Not Found Internal Recipients:

RGN 2 RES/DRAA/OERAB OCFO/DPB4 FILE CENTER 01 ACRS Not Found Not Found Not Found Not Found Not Found External Recipients:

NOAC INEEL Marshall Not Found Not Found Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 003677707

Subject:

DECEMBER 1999 MONTHLYOPERATING REPORT FOR SHEARON HARRIS NUCLEAR POWER PLANT Body:

Docket: 05000400, Notes: Application for permit renewal filed.

Page 1

Carolina Power & Light Company Harris Nuclear Plant P.O. Box 165 New HillNC 27562 JAN 14 2000 Serial: HNP-00-002 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO.

NPF-63'ONK'S.Y OPERATING REPORT

Dear Sir or Madam:

/

~

4 In accordance with Carolina Power 8c Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of-operating statistics and shutdown experience for the month of December 1999 is provided.

Sincerely, D. B. Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure

=

~

P I

j Mr. J. B. Brady - NRC Senior Resident Inspector

'Mr:R. J. Laufer - NRC Project Manager Mr. L. A. Reyes - NRC P5qgjqgg QAPIIaIte~<<q.. HillNc eo y4 777'

~

~

y

+

P E

4

Enclosure to Serial HNP-00-002 Sheet l of 3 CP&L CO.

RUN DATE 01/07/00 RUN TIME 09:35:11 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1

RPD36-000 OPERATING STATUS DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573

1. UNIT NAME:

HARRIS UNIT 1 2.

REPORTING PERIOD:

DECEMBER 99 3.

LICENSED THERMAL POWER (MWT):

2775 4.

NAMEPLATE RATING (GROSS MWE):

950.9 5.

DESIGN ELECTRICAL RATING (NET MWE):

900.0 6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.

MAX DEPENDABLE CAPACITY (NET MWE):

860.0

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

10.

REASONS FOR RESTRICTION IF ANY:

THIS MONTH YR TO DATE CUMUL ATIVE 11.

HOURS ZN REPORTING PERIOD 12.

NUMBER OF HOURS REACTOR CRITICAL 13.

REACTOR RESERVE SHUTDOWN HRS 14.

HOURS GENERATOR ON LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GEN.

(MWH) 17.

GROSS ELEC.

ENERGY GEN (MWH) 18.

NET ELEC.

ENERGY GENERATED (MWH) 19.

UNIT SERVICE FACTOR 20.

UNIT AVAILABILITYFACTOR 21.

UNIT CAP.

FACTOR (USZNG MDC NET) 22.

UNIT CAP.

FACTOR (USING DER NET) 23.

UNIT FORCED OUTAGE RATE 744.00 720.35

.00 705.28

.00 1895316.12 635292.00 594842.00 94.80 94.80 92.97 88.84 5.20 8760.00 8574.95

.00 8485.39

.00 23235760.98 7719078.00 7244149.00 96.87 96.87 96.16 91.88 3.13 111049.00 94800.56

.00 93871.00

.00 252655484.94 84063115.00 78481021.00 84.53 84.53 82.18 78.52 3.10 2 4 SHUTDOWNS SCHED ~

OVER NEXT 6 MONTHS (TYPE g DATEi AND DURATION OF EACH)

Plant Refueling Outage number 9 is planned to begin April 15, 2000~

and is scheduled for a duration of 35 days.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

26.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIALCRITICALITY INITIALELECTRICITY COMMERCZAL OPERATION 1.16 -

9

1 I

I I

'1 I I

'I

Enclosure to Serial: HNP-00-002 Sheet 2 of 3 CPScL CO.

PLANT PERFORMANCE DATA SYSTEM RUN DATE 01/07/00 APPENDIX B AVERAGE DAiLY POWER LEVEL RUN TIME 09:35:10 HARRIS UNIT1'AGE 1

RPD39-000 DECEMBER 1999 DAY AVG. DAILY POWER LEVEL (MWE-NET)

DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG. DAILY POWER LEVEL (MWE-NET) 10 12 13 15 16 881 879 876 872 870 869 879 879 876 870 878 879 869 108

-3 227 17 18 19 20 21 22 23 25 26 27 28 29 30 31 863 871 870 870 870 873 854 876 877 875 876 877 876 874 873

4

'I I

~

Enclosure to -r-Serial: HNP-00-(j(/2-Sheet 3 of 3 UNITNAME:

Harris DATE:

12/31/99 COMPLETED BY: S. G. Rogers TELEPHONF (919) 362-2573 REPORT MONTH: December 1999 UNITSHUTDOWNS ANDPOWER REDUCTION NUMBER 99-006 DATE TYPE I

12/14/99 DURATION (HOURS) 38.72 REASON 2 METHODOF LICENSEE SHUTTING DOWN EVENT REACIOR 3 REPORT¹ 99-09 SYSTEM CODE 4 HH COMPONENT CODE 5 PUMPXX CAUSE AND CORRECTIVE ACriONTO PREVENTRECURRENCE The Reactor was manually tripped on 12/14/99 I03:55 when a ground fault occurred on the "A"Condensate pump, which caused a subsequent tripof the "A"Condensate Booster Pump and "A"Main Fecdwater Pump. Repairs were made and the plant sync to grid 12/15/99 I 18:38 and returned to 100% power 12/17/99 I04:00.

I F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training k License lamination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5.Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Same Source

@el~9 Distri35.txt Distribution Sheet Priority: Normal From: Esperanza'omosbog Action Recipients:

RidsNrrPMRLaufer R Laufer Copies:

1 1

OK Not Found Internal Recipients:

RGN 2

RES/DRAA/OERAB OC/

Z/PAD LE CENTER 01 Not Found Not Found Not Found Not Found Not Found External Recipients:

NRC PDR NOAC INEEL Marshall Not Found Not Found Not Found Total Copies:

Item:

ADAMS Document Library:

ML ADAMS"HQNTAD01 ID: 993610120 10

Subject:

SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.

50400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT Body:

PDR ADOCK 05000400 R

Docket:

05000400, Notes: Application for permit renewal filed.

Page 1

C

Carolina Power & Light Company Harris Nuclear Plant PO Box 165 Now Hill NC 27562 DEC l d l999 Serial: HNP-99-181 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power &Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of November 1999 is provided.-

e l ~ r A

Sincerely, 5

5 54~h D. B. Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure c:

Mr. J. B. Brady - NRC Senior Resident Inspector Mr. R. J. Laufer - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator P ~+ ~D f DH)+~ ~QieQed 113d New Hiii NC

8

'I

y1

~

Enclosure to Serial HNP-99-181 Sheet 1 of2 CP&L CO.

RUN DATE 12/08/99 RUN TIME 10:02:44 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1

RPD36-000 OPERATING STATUS DOCKET NO. 050-400 COMPLETED BY SHEZLA ROGERS TELEPHONE (919)362-2573 1.

UNIT NAME:

HARRXS UNIT 1 2.

REPORTING PERIOD:

NOVEMBER 99 3.

LICENSED THERMAL POWER (MWT):

2775 4.

NAMEPLATE RATING (GROSS MWE):

950.9 5.

DESIGN ELECTRICAL RATING (NET MWE):

900.0 6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.

MAX DEPENDABLE CAPACITY (NET MWE):

860.0

8. IF CHANGES OCCUR ZN CAPACITY RATINGS (ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):

10.

REASONS FOR RESTRICTION IF ANY:

THIS MONTH YR TO DATE CUMUL ATIVE 11.

HOURS IN REPORTING PERIOD 12.

NUMBER OF HOURS REACTOR CRITICAL 13.

REACTOR RESERVE SHUTDOWN HRS 14.

HOURS GENERATOR ON LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GEN.

(MWH) 17.

GROSS ELEC.

ENERGY GEN (MWH) 18.

NET ELEC.

ENERGY GENERATED (MWH) 19.

UNIT SERVXCE FACTOR 20.

UNIT AVAXLABXLITYFACTOR 21.

UNIT CAP.

FACTOR (USING MDC NET) 22.

UNXT CAP.

FACTOR (USXNG DER NET) 23.

UNIT FORCED OUTAGE RATE 24.

SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS 720.00 720.00

.00 720.00

.00 1988695.98 665787.00 626676.00 100.00 100.00 101.21 96.71

.00 (TYPES'ATEg AND 110305.00 94080.21

.00 93165.72

.00 250760168.82 83427823.00 77886179.00 84.46 84.46 82.10 78.46 3.09 8016.00 7854.60

.00 7780.11

.00 21340444. 86 7083786.00 6649307.00 97.06 97.06 96.45 92.17 2.94 DURATION OF EACH):

Plant Refueling Outage number 9 is planned to begin April 15,

2000, and is scheduled for a duration of 35 days.
25. IF SHUTDOWN AT END OF REPORT
PERIOD, ESTIMATED DATE OF START UP:

26.

UNITS ZN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED ZNITZAL CRXTXCALITY INITXALELECTRICITY COMMERCIAL OPERATION 1.16 -

9

~ P T%!aS t

i IlihS ~

, ~ T ~

Pal 6

Vill Ii g7 i; g,

I

~

~

~

Enclosure to Serial: HNP-99-181 Sheet 2 of2 CP&L CO.

PLANT PERFORMANCE DATA SYSTEM RUN DATE 12/08/99 APPENDIX B AVERAGE DAILY POWER LEVEL RUN TIME 10:02:44 HARRIS UNIT 1 PAGE 1

RPD39-000 NOVEMBER 1999 DAY AVG. DAILY POWER LEVEL (MWE-NET)

DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG. DAILY POWER LEVEL (MWE-NET) 10 12 13 14 16 866 865 880 880 876 811 871 875 868 865 869 875 872 867 877 879 17 18 19 20 21 22 23 25 26 27 28 29 30 880 879 874 870 868 865 869 871 867 864 876 876 878 880

Distri67.txt Distribution Sheet Priority: Normal From: Andy Hoy Action Recipients:

RidsNrrPMRLaufer RidsNrrLAEDunnington R Laufer E Dunnington Internal Recipients:

RGN 2.FILE NR BM/

FILE CEN ER 01 ACW Copies:

1 1

1 1

OK OK Not Found Not Found Not Found Not Found Not Found Not Found External Recipients:

NRC PDR Not Found Total Copies:

Item:

ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993480217

Subject:

Leter forwarding a revised NPDES Monthly Operating Report for the mont h of October, 1999.

Flow data has been corrected.

Body:

PDR ADOCK 05000400 R

Docket:

05000400, Notes: Application for permit renewal filed.

Page 1

FENOC e

Peny Nudear Power Plant 10 Center Road Pony, Ohio 44081 John K. Wood Vice President, Nudear 440-280-5224 Fax: 440-28tM029 December 6, 1999 PY-CEI/OEPA-0325L Ohio Environmental Protection Agency DivisionofSurface Water Lazarus Government Center P.O. Box 1049 Columbus, Ohio 43216-1049 Attention: Bonita Dennis Ladies and Gentlemen:

Enclosed is a revised NPDES Monthly Operating Report form for the month of October, 1999.

Flow data has been corrected. Allother information is the same.

Ifyou have questions or require additional information, please contact Ms. Donna Tizzano at (440) 280-5514.

Very truly yours, DGT:sc Enclosures cc:

NRC Region III NRC Resident Inspector NRC Project Manager NRC Document Control Desk ( Docket No. 50-440)

Qrk>

d MCA4Ttg;YREPORT FORM Name, Address City, County, ZIP:

Perry Nudear Power Plant 10 Center Rd. CCB125 PerryOH44081 4500 Station Code:

Reported Date (Month Year):

004 October 1999 Sampling Station

Description:

Point Representative of Discharge Application:

3IB00016*ED 12/2/99 Page1of 1

in(1) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab:

in(2) - Enter frequency of sampling CCB140 Analyst:

Phil Lashley (2)

Day 01 02 03 04 05 06 07 08 09 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 TOTAL AVG MIN 999 (00400) pH s.u.

8.2 8.1 7.8 8.1 7.9 72.1 8.0111 8.2 7.8 (00665)

(34044)

Phosphorus, Total Oxidants, Total (P)

Residual mg/1 mg/1 0.111 0.051 0.138 0.112 0.412 0.103 0.138 0.051 (50064)

Chlorine, Free Available mg/1 0 F 05 0.01 0'9 0.02 0'3 0.1 0.05 0.12 0'4 0

0.51 0.0165 0.12 (78739) rination/Brominat Duration Minutes 75 90 85 70 110 28 30 60 55 85 65 70 70 65 80 70 79 80 90 90 90 90 100 105 85 98 75 95 85 2354 75.9355 110 999 (50050)

Flow Rate MGD 51.1 51

~ 5 55 ~ 2 62 '

66 '

114.4 113 '

115.8 110 100 101.7 78 8'

76.7 68 F 1 69.7 76 ~ 7 86 ~ 4 79 8'

65.4 61 '

54.1 56 ~ 2 66 F 1 67 ~ 2 56.7 58 F 9 62 '

63 '

62 ~ 9 2322.4 74.9161 115.8 51.1 999 (00011)

Water Temperature F

77 75 76 73 72 72 65 66 69 66 70 67 66 68 68 66 65 66 63 68 67 66 66 64 65 68 68 68 2106 67 '355 77 63 Additional Remarks:

I certify under the penalty of law that I have personally examined and am familiarv/ith the information submitted and based on my hquhy of those indiv/duals Immedl'teiy responsible for obtaining the Information, I believe the submitted Information Is true, accurate and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and Impdsonment.

Form No EPA 4500 (8-91)

Date Report Completed:

Signature of Reporter:

Title of Reporter.

gLKIfggP+SURI l2/0l/lg g g

Distribution Sheet Distri19.txt Priority: Normal From: Elaine Walker Action Recipients:

R Laufer Copies:

Not Found Internal Recipients:

RGN 2 RES/DRAA/OERAB OC/DBA//AD FIL -C hLKE~O-ACRS Not Found 1

~

Not Found Not Found 1

Not Found Not Found External Recipients:

NRC PDR NOAC INEEL Marshall Not Found Not Found Not Found Total Copies:

Item: ADAMS Document Library: ML ADAMS"HQNTAD01 ID: 993240487

Subject:

Monthly operating report for October 1999 for Shearon Harris Nuclear Power Plant. Wit h letter dated 11/12/99.

Body:

PDR ADOCK 05000400 R Docket: 05000400, Notes: Application for permit renewal filed.

Page 1

Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New HillNC 27562 NOV 12 l99e Serial: HNP-99-177 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEARPOWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power &Light Company's Harris Nuclear Plant Technical Specificatio'n 6.9.1.5, the report, of operating statistics and shutdown experience for the month of October.1999 is provided.

Sincerely, D. B. Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure c:

Mr. J. B. Brady - NRC Senior Resident Inspector Mr. R. J. Laufer - NRC Project Manager Mr. L. A, Reyes - NRC Regional Administrator 5413 Shearon Harris Road New HillNC

I

,f I ll J'

Enclosure to Serial HNP-99-177 Sheet 1 of2 CP&L CO.

RUN DATE 11/03/99 RUN TIME 14:27:38 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1

RPD36-000 OPERATING STATUS DOCKET NO. 050-400 COMPLETED BY SHEXLA ROGERS TELEPHONE (919) 362-2573 1.

UNIT NAME:

HARRIS UNIT 1 2.

REPORTING PERIOD:

OCTOBER 99 3.

LICENSED THERMAL POWER (MWT):

2775 4.

NAMEPLATE RATING (GROSS MWE):

950.9 5.

DESIGN ELECTRXCAL RATING (NET MWE):

900.0 6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.

MAX DEPENDABLE CAPACITY (NET MWE):

860.0

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS:

9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWB):

10.

REASONS FOR RESTRICTION IF ANY:

THIS MONTH YR TO DATE CUMUL ATIVE 11.

HOURS ZN REPORTING PERIOD 12.

NUMBER OF HOURS REACTOR CRXTICAL 13.

REACTOR RESERVE SHUTDOWN HRS 14.

HOURS GENERATOR ON LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GEN.

(MWH) 17.

GROSS ELEC.

ENERGY GEN (MWH) 18.

NET ELEC.

ENERGY GENERATED (MWH) 19.

UNIT SERVICE FACTOR 20.

UNXT AVAXLABZLZTYFACTOR 21.

UNIT CAP.

FACTOR (USING MDC NET) 22.

UNIT CAP.

FACTOR (USING DER NET) 23.

UNXT FORCED OUTAGE RATE 745.00 745.00

.00 745.00

.00 2062961.64 688156.00 647981.00 100.00 100.00 101. 14 96.64

.00 7296.00 7134.60

.00 7060.11

.00 19351748.88 6417999.00 6022631.00 96.77 96.77 95.98 91.72 3.23 109585.00 93360.21

.00 92445.72

.00 248771472.84 82762036.00 77259503.00 84.36 84.36 81.98 78.34 3.11 24.

SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Plant Refueling Outage number 9 is planned to begin April 15,

2000, and is scheduled for a duration of 35 days.
25. IF SHUTDOWN AT END OF REPORT
PERXOD, ESTIMATED DATE OF START UP:

26.

UNITS ZN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED XNZTIAL CRXTXCALITY 1NZTXAL ELECTRICITY COMMERCIAL OPERATION 1.16 -

9

~

g e

I OG, F,.'x 8" pli.

(,L

~

"'O'P l

Enclosure to Serial: HNP-99-177 Sheet 2 of2 CP&L CO.

PLANT PERFORMANCE DATA SYSTEM RUN DATE 11/03/99 APPENDIX B AVERAGE DAILY POWER LEVEL RUN TIME 14:27:37 HARRIS UNIT 1 PAGE 1

RPD39-000 OCTOBER 1999 DAY AVG. DAILY POWER LEVEL (MWE-NET)

DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG. DAILY POWER LEVEL (MWE-NET) 10 12 13 15 16 872 868 860 861 868 874 871 871 864 860 860 867 870 870 873 866 17 18 19 20 21 22 23 25 26 27 28 29 30 31 860 869 873 872 876 875 876 878 879 874 873 874 872 868 867