Final Deficiency Rept,Item 162 Re Inadequate Tack Welds in Fire Barrier.Initially Reported on 840314.Sections of Cable Tray Will Be Protected by Covers
ML18004A298
Person / Time
Site: Harris 
Issue date: 07/01/1986
From: Watson R
CAROLINA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
CON-NRC-463 162, HO-860317(O), NUDOCS 8607180331
Download: ML18004A298 (5)


Text

Exhz.bat 13 HARRIS NUCLEAR PROJECT P.

O.

Box 165 New Hill, NC 27562 July 1, 1986 File Number'SHF/10-13510E Letter Number:

HO-860317 (0)

Dr. J. Nelson Grace United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest (Suite 2900)

Atlanta, Georgia 30323 CAROLINA POWER 6 LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 1986 900,000 KW - UNIT 1

FIRE BARRIERS " TACK WELDS, ITEM 162

Dear Dr. Grace:

NRC-463 Attached is final report on the subject item, which was deemed reportable per the provisions of 10CFR50.55(e) on March 14, 1984.

With this report, Carolina Power

& Light Company considers this matter closed.

If you have any questions concerning this matter, please do not hesitate to contact me.

Yours very truly, n

/i'/j/( ~g'~re R. A. Watson Vice President Harris Nuclear Project RAW:cge Attachment cc'Messrs.

C. Maxwell (NRC-SHNPP)

J.

M. Taylor (NRC)

HEM/HO-860317(0)/PAGE 1/OS1

Llr ~

J

~

ilVi. OVAL 4 Ca ivRC-463 bcc.'r.

H ~

R.

Banks Mr. T. A. Baxter (Shaw, Pittman Mr. H.

W. Bowles Mr. C. Carmichael (2)

Mr. N. J. Chiangi Mr. A. B. Cutter Mr. G. L. Forehand Mr. J.

F. Garibaldi (Ebasco)

Mr. C. S. Hinnant Mr. P.

C. Hopkins Mr. L. I. Loflin Mr. R. E.

Lumsden Mr. R. L. Mayton, Jr.

Mr. M. A. McDuffie Mr. C. L. McKenzie Mr. S.

McManus Mr'. A. Meyer Mr. C. H. Moseley, Jr.

Mr. D. L. Nordstrom (LIS)

Mr. M. Shannon (Westinghouse)

Mr. E.

M. Steudel Mr. D. L. Tibbitts Mr.'. C. Tollison Mr. J. L. Willis File:

HI/A-2D File:

H-X-0544 Day File Document Services

~>'r <.WVC~~:V,~=~ZFrr NBI"OS1 Potts

& Trowbridge)

MEM/HO-860317(0)/PAGE 5/Osl

CAROLINA ONER 6 LIGHT COMPANY SHKARON HARRIS NUCLEAR POMER PLANT UNIT 1 PINAL REPORT PIRE BARRIERS - TACR WBLDS ITEM 162 JULY 1, 1986 REPORTABLE UNDER 10CFR50.55(e)

MEM/HO-860317(Q)/PAGE 2/OS1

SUBJECT:

Shearon Harris Nuclear Power Plant, Unit No.

1, 10CFR50.55(e) reportable deficiency.

Inadequate Tack fields in Fire Barrier.

ITEM:

Tack velds are required for structural support of fire barrier panels but vere not inspected.

SUPPLIED BY:

Not a supplier-related deficiency.

NATURE OF DEFICIENCY The subject fire barrier panels consist basically of a fireproof material applied to both sides of expanded metal.

The attachment of the panels to structural steel is by tack welds.

Original design did not specify number or location of tack we1.ds',

therefore, tack welds were not considered structural and inspection vas not required, In some areas where the fireproofing material vas removed for reinspection, tack welds vere found to have broken.

DATE PROBLEM OCCURED:

Prior to February 1,

1984.

DATE PROBLEM REPORTED:

On February 13,

1984, CP&L (Mr. N. J. Chiangi) notified the NRC (Mr. A. Hardin) that this item vas potentially reportable per provisions of 10CFR50.55(e).

On March 14,

1984, CP&L (Mr. N. J. Chiangi) notified the NRC (Mr. A. Hardin) that the item vas reportable per 10CFR50.55(e).

SCOPE OF PROBLEM:

The fire barrier bottom panels vere installed prior to the tack welds being identified as a problem so they are all suspect, and since the fire protective coating has been applied, the tack velds are not accessible for reinspection/rework.

The fire barrier panels are located in the Cable Spread Room and Auxiliary Control Panel Room.

'.REM/HO-860317(0)/PAGE 3/OS1

IMPLICATI The fixe barrier sepaxates redutxdant Cable Trains SA and SB.

The tack welds do not affect the Eire protection properties of the panels, but the fixe barrier is seismically designed, and faiLure of the tack welds could allow the panels to drop down onto safety-related cable and equipment beneath.

Engineering evaluation has determined there is a

safety concern for one section of cabl.e tray in the Cable Spread

Room, and the panels which are over the Auxiliary Contxol Panel and a section of cable tray in the Auxiliary Control Panel Room.

CORRECTIVE ACTION:

The sections of cable tray where there is a safety concern will be px'otected by covers.

The design and installation of the subject cable tray covers is now complete.

The Auxiliary Control Panel will be protected by providing structural support for the section of panel which could potentially damage it.

Design of this support and its installation are now complete.

FINAL REPORT Mith compl:etion of the corrective actions as stated above, this item is now considered resolved.

This is the final report.

HEN/HO-860317 (0) /PAGE 0/OS 1