ML18004A269

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/86-26 on 860505-09.No Violations or Deviations Noted
ML18004A269
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/26/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18004A270 List:
References
NUDOCS 8607070215
Download: ML18004A269 (3)


See also: IR 05000400/1986026

Text

4

g 6 3906

Docket No. 50-400

License

No.

CPPR-158

Carolina

Power

and Light Company

ATTN:~r. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NO. 50-400/86-26

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

P.

M. Madden,

T.

F. McElhinney,

P. A. Taylor,

and

G.

R.

Wiseman

on May 5-9,

1986.

The

inspection

included

a

review of activities

authorized

for your Harris

facility.

At the conclusion of the inspection,

the findings were discussed

with

those

members of your staff identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

Your attention is invited to the unresolved

item identified in the inspection

report.

This matter will be pursued during future inspections.

In

accordance

with Section

2.790 of the

NRC's

"Rules

of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter

and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects

Branch

2

Division of Reactor Projects

Enclosure:

NRC Inspection

Report

cc w/encl:

(See

page

2)

8607070215

860626

PDR

ADOCK 05000400

G

PDR,,

t

4'"'

~~

~ 0

'

gUN 3 6

1S86

1

Carolina

Power and Light Company

c w/encl:

R

A. Watson,

Vice President

Harris Nuclear Project

R.

M. Parsons,

Project General

Manager

/D. L. Tibbetts, Director of Regulatory

J

Compliance

J.

L. Willis, Plant General

Manager

/bcc w/encl:

f

~ C. Barth,

ELD

Jg

Moore,

ELD

MRC Resident

Inspector

+Document Control

Desk

+tate of North Carolina

II

<

RII~.(

GWiseman:him

6/95/86

R~II

g r

TConl on

6/~s/86

RIIy

Her/

6/gp/86

gM