Forwards Insp Rept 50-400/86-34 on 860420-0520.No Violation or Deviation Noted
ML18003B297
Person / Time
Site: Harris 
Issue date: 06/02/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18003B298 List:
References
NUDOCS 8606100320
Download: ML18003B297 (3)


See also: IR 05000400/1986034

Text

Docket No. 50-400

License

No.

CPPR-158

Caroling Power and Light Company

ATTN: v Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NO. 50-400/86-34

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

G.

Maxwell

on April 20

May 20,

1986.

The

inspection

included

a

review of

activities

authorized

for your

Harris facility.

At the

conclusion

of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of 'procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

Within the

scope of the. inspection,

no violations or deviations

were identified.

In

accordance

with Section

2.790

of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

'QgG1NAL S~~NED

DAVID M. VERktLLI

David M. Verrelli, Chief

Reactor Projects

Branch

2

Division of Reactor Projects

SbObl00320

BbOb02

I

PDR

ADOCK 05000400

8

PDR

Enclosure:

J

NRC Inspection

Report

cc w/encl:

R. A. Watson,

Vice President

Harris Nuclear Project

g.

M. Parsons,

Project General

Manager

gJ.

L. Willis, Plant General

Manager

bcc w/encl:

(See

page

2)

~'

$p A

a,nels~

I

I ',

Carolina

Power and Light Company

JUN 8-

1988

cc w/encl:

C. Barth,

ELD

. Moor'd,

ELD

NRC Resident

Inspector

A3ocument Control

Desk

+tate of North Carolina

I

I

5

Mellen:jw

g/M86

&

Fredri ckson

/a./86