ML18003B203
| ML18003B203 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/10/1986 |
| From: | Panciera V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18003B204 | List: |
| References | |
| NUDOCS 8604220519 | |
| Download: ML18003B203 (4) | |
See also: IR 05000400/1986015
Text
Carolina+ower
and Light Company
ATTN: vNr. E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/86-15
On
March 3-7,
1986,
NRC inspected
activities
authorized
by
NRC Construction
Permit
No.
CPPR-158 for your Shearon
Harris facility.
At the conclusion of the
inspection,
the
findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation of activities
in progress.
Within the scope of the inspection,
no violations or deviations
were identified.
Should you have
any questions
concerning this letter, please
contact us.
Sincerely,
Vincent
W. Panciera,
Chief
Reactor Projects
Branch
2
Division of Reactor Projects
Enclosure:
Inspection
Report
No. 50-400/86-15
cc w/encl:
W A. Watson,
Vice President
~
~
~
~
Harris Nuclear Project
.
M. Parsons,
Project General
Manager
Pg.
L. Willis, Plant General
Manager
bcc w/encl:
(See
page 2)
8b04220519
8b0410
ADOCK 05000400
8
4$ 4~
41 ~ l
1
4
1
(
~ A
4
'I
l*
,II
'l
I
C'
~
<
~
APR 10
1986
Carolina
Power and Light Company
bgc w/encl:
C.~Barth,
ELD
8. Moore,
ELD
KC Resident
Inspector
Document Control
Desk
State of North Carolina
RISHI
t
ABRuff:bhg
g/ ~/ /86
RIIP
TEConlon
I}/p/66
R IIgp
ARHerdt
Q/g /86
Q,+~ f,,
~ >> 4
I,
~
II
II
e
P
r
- )
w ~
S
I"
h
'1
.