Forwards Insp Rept 50-400/85-46 on 851118-22.No Violations or Deviations Noted
ML18003B190
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/17/1985
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18003B191 List:
References
NUDOCS 8512240187
Download: ML18003B190 (2)


See also: IR 05000400/1985046

Text

DEC 1 "t l985

(~olina Power

and Light Company

ATTN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/85-46

On November 18-22,

1985,

NRC inspected activities authorized

by

NRC Construction

Permit No.

CPPR-158 for your Harris facility.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation of activities

in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

In

accordance

with Section

2.790

of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a

copy of this letter and its enclosure

will be placed in the

NRC'

Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosure:

Inspection

Report

No. 50-400/85-46

cc w/encl:

~.

A. Watson,

Vice President

Harris Nuclear Project

~.

M. Parsons,

Project General

Manager

vd.

L. Willis, Plant General

Manager

b c w/encl:

assai

Fan ~~">>~ esp~

RC Resident

Inspector

State of North Carolina

Document Control

Desk

RII

RII

Sartor

TDec er

12//y'/85

12/($ /85

DCollins

121/g/85

Fredrickson

12/i7/85