ML18003B137
| ML18003B137 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/24/1985 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18003B138 | List: |
| References | |
| NUDOCS 8507010626 | |
| Download: ML18003B137 (2) | |
See also: IR 05000400/1985018
Text
MAY 24 l985
Carolina
Power and Light Company
ATTN:
Mr. E.
E. Utley
Executive Vice President
Power Supply and Engineering
and Construction
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/85-18
On May 7-10,
1985,
NRC inspected activities authorized
by
NRC Construction
Permit
No.
CPPR-158
for your
Shearon
Harris facility.
At the
conclusion
of. the
'inspection,'he
finding's
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of activities
in progress'.
-
- c:..i
~
~
.
Within the
scope of the inspection,
no violations or deviat'ions
were identified.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely',
Enclosure:
Inspection
Report
No. 50-400/85-18
cc w/encl:
R. A. Watson,
Vice President
Harris Nuclear Project
R.
M. Parsons,
Project General
Manager
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
bcc w/encl:
NRC Resident
Inspector
Document Control
Desk
State of North Carolina
8507OSO62S
ADOCK
6
850524
OSOOO4OO
PTaylor:jw
5/PS/85
RII
FJa
5+/85
A erdt
5/vP/85
+Eol
~
l
l'
IR (jy
A
CL
f1
g
4
8
II