Forwards Insp Rept 50-400/85-18 on 850507-10.No Violations or Deviations Noted
ML18003B137
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/24/1985
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18003B138 List:
References
NUDOCS 8507010626
Download: ML18003B137 (2)


See also: IR 05000400/1985018

Text

MAY 24 l985

Carolina

Power and Light Company

ATTN:

Mr. E.

E. Utley

Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/85-18

On May 7-10,

1985,

NRC inspected activities authorized

by

NRC Construction

Permit

No.

CPPR-158

for your

Shearon

Harris facility.

At the

conclusion

of. the

'inspection,'he

finding's

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress'.

-

  • c:..i

~

~

.

Within the

scope of the inspection,

no violations or deviat'ions

were identified.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely',

Enclosure:

Inspection

Report

No. 50-400/85-18

cc w/encl:

R. A. Watson,

Vice President

Harris Nuclear Project

R.

M. Parsons,

Project General

Manager

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

bcc w/encl:

NRC Resident

Inspector

Document Control

Desk

State of North Carolina

8507OSO62S

PDR

ADOCK

6

850524

OSOOO4OO

PDR

PTaylor:jw

5/PS/85

RII

FJa

5+/85

A erdt

5/vP/85

+Eol

~

l

l'

IR (jy

A

CL

f1

g

4

8

II