Forwards Control Room Design Review Summary Rept for Shearon Harris Nuclear Power Plant,Unit 1, in Response to SER (NUREG-1038) Open Item 14.Rept Includes Plans for Human Factors Review of SPDS
ML18003B096
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/09/1985
From: Cutter A
CAROLINA POWER & LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML18003B097 List:
References
RTR-NUREG-1038 NLS-85-096, NLS-85-96, NUDOCS 8504160347
Download: ML18003B096 (6)


Text

REGULA'NFORMATION DISTRIBUTI EM (RIDS)

ACCESSION NBR:8504160347 DOC ~ DATE: 85/04/09 NOTARIZED: YES DOCKET ¹ FACIL:50-400 Shearon Harris Nuclear Power Plantg Unit 1~ Carolina 05000400 ILIATION A VTH ~ NAME CUTTERgA F 8 REC IP ~ NAME

'arolina AUTHOR AFF Power 8 Light Co, RECIPIENT AFFILIATION DENTON~H ~ R<< Office. of Nuclear Reactor Regulationp Director Ep'L

SUBJECT:

Forwards "Control Room Design Review bummary Rept fo' Shearon Har,ris Nuclear Power PlantiUnit itin response to SER (NUREG-1038),Open Item 14 Rept includes plans for human

,factors review of SPDS.

DISTRIBUTION 'CODE: )ATE 8001D COPIES RECEIyED:LTR TITLE: Licensing Submittal: PSAR/FSAR Amdts 3

f. ENCL ~ SIZEe Related Correspondence NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NA LTTR ENC ID CODE/NAME LTTR ENCL' NRR/DL/ADL 1 NRR L'83 BC NRR LB3 LA 1 BUCKLEYgB 01 1 ir INTERNAL: ACRS 41 6 ADM/LFMB

.ELD/HDSi 1 IE FILE 1 IE/DEPER/EPB 36 1 IE/DQAVT/QAB21 1 NRR ROEpM ~ L NRR/DE/AEAB 1 NRR/DE/CEB NRR/DF/EQB il 13 1

1 2

NRR/DE/EHEB NRR/DE/GB 28 1

2 NRR/DE/MEB 18 1" NRR/DE/MTEB 17 1 NRA/DE/SAB 24 1 NRR/DE/SGEB 25 1 NRR/DHFS/HFE840 1 NRR/DHFS/LQB 32 1 NRR/DHFS/PSRB 1 NRR/DL/SSPB 1 NRR/DS I/AEB 26 1 NRR/DSI/ASB 1 NRR/DS I/CPB 10 1 NRR/DSI/CSB 09 1 NRR/DSI/ICSB 16 1 NRR/DS I/METB 12 1 NRR/DS I/PSB 19 1 N AB 22 1 NRR/DS I/RSB 23 1 EG FI 04 1 1>

RGN2 3 AMI/MIB 1 EXTERNAL: BNL(AMDTS ONLY) 1 DMB/DSS (AMDTS) 1 LPDR 03 1 1~ NRC PDR 02 1 1<

NSIC 05 1 PNL GRUELgR TOTAL NUMBER Of COPIES REQUIRED: LTTR 51 ENCL

~y

'I P

I

y~

SR%

i ~

Carolina Power & Light Company APR O 9 1985 SERIAL: NLS-85-096 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1 DOCKET NO.50-000 SER OPEN ITEM NO. 10 CONTROL ROOM DESIGN REVIEW

Dear Mr. Denton:

Carolina Power R Light Company (CPdcL) hereby submits additional information concerning the Shearon Har ris Nuclear Power Plant (SHNPP) Control Room Design Review (CRDR) in response to the Safety Evaluation Report Open Item No. 10.

Supplement No. 1 to NUREG-1038, "Safety Evaluation Report Related to the Operation of Shearon Harris Nuclear Power Plant (SHNPP), Unit No. 1" (3une 1980) and an NRC letter dated on August 10, 1980, requested that additional information be submitted to the NRC staff concerning the SHNPP CRDR at least six months before fuel load. CPRL responded by letter dated 3anuary 1 1, 1985, briefly describing the work underway.

As reported in our 3anuary 11, 1985 letter, the Company contracted an outside consultant to prepare the CRDR summary report. The enclosed summary report contains the plans for the completion and reassessment of the control room design review and a description of the CRDR activities already completed. This summary report also includes plans for a Human Factors review of the Safety Parameter Display System (SPDS) as discussed at the March 5-7, 1985 SPDS Audit.

A final summary report, updating this submittal, will submitted for review six months prior to fuel load.

goo 8504160347 B50409 PDR ADOCK 05000400 PDR 411 Fayettevilte Street o P. O. Box 1551 o Raleigh, N. C. 27602

~y

~ ~

, r ae t

Mr. Harold R, Dentori Page 2 If you have any questions concerning this submittal, feel free to contact Mr. 3ames Kloosterman, of our Harris Licensing Unit staff, at (9 l9) 836-8055.

Your very trul A. B. Cutter Vice re dent Nuclear Engineering R Licensing CGL/pgp ( 1309CGL)

Enclosure Ccs Mr. B. C. Buckley (NRC) Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP) Mr. 3ohn D. Runkle Dr. J. Nelson Grace (NRC-RII) Dr. Richard D. Wilson Mr. Travis Payne (KUDZU) Mr. G. O. Bright (ASLB)

Mr. Daniel F. Read (CHANGE/ELP) Dr. sI. H. Carpenter (ASLB)

Wake County Public Library Mr. J. L. Kelley (ASLB)

Mr. L. Beltracci (NRC)

Mr. R. Ramirez (NRC)

A. B. Cutter, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power R Light Company.

My commission expires: D/IF/fg Notary Seal illllI Itlat y pi g