ML18003B066
| ML18003B066 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 02/11/1985 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18003B067 | List: |
| References | |
| NUDOCS 8503060844 | |
| Download: ML18003B066 (2) | |
See also: IR 05000400/1985003
Text
Carolina
Power and Light Company
ATTN:
Mr. E.
E. Utley
Executive Vice President
Power Supply and Engineering
and Construction
411 Fayetteville Street
Raleigh,
NC
27602
FEB 11 1985
Gentlemen:
SUBJECT:
REPORT
NO. 50-400/85-03
On January
15-18,
1985,
NRC inspected activities authorized
by
NRC Construction
Permit
No.
CPPR-158
for your
Harris facility.
At the, conclusion
of
the
inspection,
the
findings
were
discussed
with
those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of activities
in progress.
0
Within the
scope of the inspection,
no violations or deviations
were identified.
Should you have
any questions
concerning this letter,
please
contact
us.
David M. Verrelli, Chief
Reactor Projects
Branch 1-
Division of Reactor Projects
Enclosure:
Inspection
Report
No. 50-400/85-03
cc w/encl:
R. A. Watson,
Vice President
Harris Nuclear Project
R.
M. Parsons,
Project General
Manager
bcc w/encl:
NRC Resident
Inspector
Document Control
Desk
State of North Carolina
ns rg
5
8503060844
ADOCK
8
JBlae
g/7 /85
8502ii
05000400
AR erdt
/85
gE
6(
4
j
a
.
lt
1
l
h
L