Forwards Insp Rept 50-400/85-03 on 850115-18.No Violations or Deviations Noted
ML18003B066
Person / Time
Site: Harris 
Issue date: 02/11/1985
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18003B067 List:
References
NUDOCS 8503060844
Download: ML18003B066 (2)


See also: IR 05000400/1985003

Text

Carolina

Power and Light Company

ATTN:

Mr. E.

E. Utley

Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh,

NC

27602

FEB 11 1985

Gentlemen:

SUBJECT:

REPORT

NO. 50-400/85-03

On January

15-18,

1985,

NRC inspected activities authorized

by

NRC Construction

Permit

No.

CPPR-158

for your

Harris facility.

At the, conclusion

of

the

inspection,

the

findings

were

discussed

with

those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined during the inspection

are identified in the report.

Within these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of activities

in progress.

0

Within the

scope of the inspection,

no violations or deviations

were identified.

Should you have

any questions

concerning this letter,

please

contact

us.

David M. Verrelli, Chief

Reactor Projects

Branch 1-

Division of Reactor Projects

Enclosure:

Inspection

Report

No. 50-400/85-03

cc w/encl:

R. A. Watson,

Vice President

Harris Nuclear Project

R.

M. Parsons,

Project General

Manager

bcc w/encl:

NRC Resident

Inspector

Document Control

Desk

State of North Carolina

ns rg

5

8503060844

PDR

ADOCK

8

JBlae

g/7 /85

8502ii

05000400

PDR

AR erdt

/85

gE

6(

4

j

a

.

lt

1

l

h

L