Text
~~gpR AEQUI
0
)
I
0/'
/p +a*++
In Reply Refer To:
RII:NE
50-400/79-12
50-401/79-12
50-402/79-11
50-403/79-11
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
JUL 1
0 1979
Carolina Power and Light Company
ATTN:
Mr. J. A. Jones
Executive Vice President
and
Chief Operating Officer
411 Fayetteville Street
Raleigh,
NC
27602
Gentlemen:
Cg
This refers to the inspection
conducted
by N. Economos of this office on June
12-
14, 1979, of activities authorized by NRC Construction Permit Nos. CPPR-158,
CPPR-159,
CPPR-160
and
CPPR-161 for the Shearon Harris Unit 1, 2,
3 and 4 facilities, and to
the discussion of our findings held with R.
M. Parsons
at the conclusion of the
inspection.
Areas examined during the inspectio'n and our findings are discussed in the enclosed
inspection report.
Within these
areas,
the inspection
consisted
of selective
examinations of procedures
and representative
records, interviews with personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
In accordance
with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title
10, Code of Federal Regulations,
a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document
Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary
that you make
a written application within 20 days to this office to
withhold such
information
from public disclosure.
Any such application
must
include
a full statement of the reasons
on the basis of which it is claimed that
the
information is proprietary,
and
should
be
prepared
so that proprietary
information identified in the application is contained in a separate
part of the
document.
If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
g90820 o~a
Carolina Power and Light Company
-2"
aNLl v )gyp
f>>
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Enclosure:
Inspection Report Nos.
50 400/79/12 ) 50 401/79
12 )
50-402/79-11
and 50-403/79-11
cc w/encl:
R. Parsons,
Site Manager
P. 0. Box 101
New Hill, N
C
27562
C. E. Murphy,
hief
Reactor Construction
and
Engineering Support Branch