Text
~S REgyi
N $
g
In Reply Refer To:
RII:EHG
50-400/79-05
50-401/79-05
50-402/79-04
50-403/79-04
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303
IMPAR 06 <979
Carolina Power and Light Company
Attn:
Mr. J. A. Jones
Executive Vice President
Engineering,
Construction
and Operation
411 Fayetteville Street
Raleigh, North Carolina
27602
Gentlemen:
This refers to the inspection
conducted
by Mr. Edward H. Girard of this
office on February 5-8,
1979 of activities authorized
by NRC License
Nos.
CPPR-158,
CPPR-159,
CPPR-160
and
CPPR-161 for the Shearon Harris
Nuclear Power Plant facility, Units 1, 2,
3 and 4, and to the discussion
of our findings held with Mr. R.
M. Parsons
at the conclusion of the
inspection.
Areas
examined during the inspection
and our findings are discussed
in
the enclosed
inspection report.
Within these
areas,
the inspection
consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observations
by the inspector.
Within the scope of this inspection,
no items of noncompliance
were
disclosed.
One
new unresolved
item resulted
from this inspection
and is discussed
in the enclosed
report.
This item will be examined during subsequent
inspections.
In accordance
with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title 10,
Code of Federal Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the NRC's Public
Document
Room.
If this report contains
any information that you (or
your contractor) believe to be proprietary, it is necessary
that you
make
a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
7 903280 1l(
MAR 06 ]9/g
Carolina
Power and
Light Company
"2-
include 'a full statement
of the reasons
on the basis of which it is
claimed that the information is proprietary,
and should be prepared
so
that proprietary information identified in the application is contained
,i.n a separate
part of the document.
If we do not hear from you in this
regard within the specified period,
the report will be placed in the
Public Document
Room.
Should you have any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
Charles
E. Murphy, Chief
Reactor Construction
and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-400/79-05,
50-401/79-05,
50-402/79-04
and
50-403/79-04
cc w/enclosures:
Mr. Roland Parsons,
Site Manager
Shearon Harris Nuclear Power Plant
Post Office Box 101
New Hill, North Carolina