ML18003A469
| ML18003A469 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 02/27/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18003A466 | List: |
| References | |
| NUDOCS 7903220159 | |
| Download: ML18003A469 (3) | |
See also: IR 05000400/1979002
Text
~S RE00~
P
~4
0
Cy
C
O
Itll0
r+tp
o~
+a*++
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, N.W.
ATLANTA,GEORGIA 30303
FEB 2 7 ]979
In Reply Refer To:
RII:RDB
50-400/79-02
50-401/79-02
50-402/79-01
50-403/79-01
Carolina Power and Light Company
ATTN:
J. A. Jones
Executive Vice President
Engineering, Construction
and Operation
336 Fayetteville Street
Raleigh, North Carolina
27602
Gentlemen:
This refers
to the inspection
conducted
by R.
D. Bradley of this office on
January
23-26,
1979,
of activities
authorized
by
NRC Construction
Permit
Nos.
CPPR-158,
CPPR-159,
CPPR-160,
and
CPPR-161 for the Shearon Harris Nuclear
Power
Plant facility,
and
to the
discussion
of our findings held with
R.
M. Parsons at the conclusion of the inspection.
Areas
examined
during the inspection
and our findings are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection consisted
of
selective
examinations
of procedures
and representative
records,
interviews
with personnel,
and observations
by the inspector.
We have
examined actions
you have taken with regard to previously identified
enforcement matters.
These are discussed
in the enclosed inspection report.
During the
inspection, it was
found that certain activities
under
your
license
appear
to be in noncompliance
with NRC requirements.
This item and
references
to pertinent
requirements
are listed in the Notice of Violation
enclosed
herewith as Appendix A.
This notice is sent to you pursuant to the
provisions
of Section 2.201
of
the
NRC's
"Rules
of Practice,"
Part 2,
Title 10,
Code of Federal Regulations.
Section 2.201 requires
you to submit
to this office, within 20 days of your receipt of this notice,
a written
statement
or explanation in reply including:
(l) corrective
steps
which have
been
taken
by you
and the results
achieved;
(2) corrective steps
which will
be
taken
to
avoid further
noncompliance;
and
(3)
the
date
when full
compliance will be achieved.
I
~
I
I
FEB 2 7 1979
Carolina Power and Light Company
-2-
In accordance
with Section 2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document
Room. If this
report contains
any information that you (or your contractor) believe to be
proprietary, it is necessary
that you make
a written application within 20
days to this office to withhold such information from public disclosure.
Any
such application must include .a full statement
of the reasons
on the basis of
which it is claimed that the information is proprietary,
and should be prepared
so that proprietary information identified in the application is contained in
a separate
part of the document.
If we do not hear from you in this regard
within the specified period,
the report will be placed in the Public Document
Room.
Should
you have
any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
Charles
E. Murphy,
C ief
Reactor Construction
and Engineering
Support Branch
Enclosure:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-400/79-02,
50-401/79-02,
50-402/79-01,
and 50-403/79-01
cc w/encl:
Roland Parsons,
Site Manager
Shearon Harris Nuclear Power Plant
P. 0.
Box 101
New Hill, North Carolina
27562