ML18003A469

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-400/79-02,50-401/79-02, 50-402/79-01 & 50-403/79-01 on 790123-26 & Notice of Violation
ML18003A469
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 02/27/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18003A466 List:
References
NUDOCS 7903220159
Download: ML18003A469 (3)


See also: IR 05000400/1979002

Text

~S RE00~

P

~4

0

Cy

C

O

Itll0

r+tp

o~

+a*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, N.W.

ATLANTA,GEORGIA 30303

FEB 2 7 ]979

In Reply Refer To:

RII:RDB

50-400/79-02

50-401/79-02

50-402/79-01

50-403/79-01

Carolina Power and Light Company

ATTN:

J. A. Jones

Executive Vice President

Engineering, Construction

and Operation

336 Fayetteville Street

Raleigh, North Carolina

27602

Gentlemen:

This refers

to the inspection

conducted

by R.

D. Bradley of this office on

January

23-26,

1979,

of activities

authorized

by

NRC Construction

Permit

Nos.

CPPR-158,

CPPR-159,

CPPR-160,

and

CPPR-161 for the Shearon Harris Nuclear

Power

Plant facility,

and

to the

discussion

of our findings held with

R.

M. Parsons at the conclusion of the inspection.

Areas

examined

during the inspection

and our findings are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection consisted

of

selective

examinations

of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspector.

We have

examined actions

you have taken with regard to previously identified

enforcement matters.

These are discussed

in the enclosed inspection report.

During the

inspection, it was

found that certain activities

under

your

license

appear

to be in noncompliance

with NRC requirements.

This item and

references

to pertinent

requirements

are listed in the Notice of Violation

enclosed

herewith as Appendix A.

This notice is sent to you pursuant to the

provisions

of Section 2.201

of

the

NRC's

"Rules

of Practice,"

Part 2,

Title 10,

Code of Federal Regulations.

Section 2.201 requires

you to submit

to this office, within 20 days of your receipt of this notice,

a written

statement

or explanation in reply including:

(l) corrective

steps

which have

been

taken

by you

and the results

achieved;

(2) corrective steps

which will

be

taken

to

avoid further

noncompliance;

and

(3)

the

date

when full

compliance will be achieved.

I

~

I

I

FEB 2 7 1979

Carolina Power and Light Company

-2-

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within 20

days to this office to withhold such information from public disclosure.

Any

such application must include .a full statement

of the reasons

on the basis of

which it is claimed that the information is proprietary,

and should be prepared

so that proprietary information identified in the application is contained in

a separate

part of the document.

If we do not hear from you in this regard

within the specified period,

the report will be placed in the Public Document

Room.

Should

you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

Charles

E. Murphy,

C ief

Reactor Construction

and Engineering

Support Branch

Enclosure:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-400/79-02,

50-401/79-02,

50-402/79-01,

and 50-403/79-01

cc w/encl:

Roland Parsons,

Site Manager

Shearon Harris Nuclear Power Plant

P. 0.

Box 101

New Hill, North Carolina

27562