IE Insp Repts 50-400/79-02,50-401/79-02,50-402/79-01 & 50-403/79-01 on 790123-26.Noncompliance Noted:Lack of Document Control
ML18003A473
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 02/16/1979
From: Bradley R, Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18003A466 List:
References
50-400-79-02, 50-400-79-2, 50-401-79-02, 50-401-79-2, 50-402-79-01, 50-402-79-1, 50-403-79-01, 50-403-79-1, NUDOCS 7903220173
Download: ML18003A473 (7)


See also: IR 05000400/1979002

Text

Cl

~S REOIy, tp

~4

O

0

C

++

o~

++*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

RePort

Nose I

'50-400/79-02,

50-401/79-02,

50-402/79-01

and

50-403/79-01

Licensee:

Carolina

Power and Light Company

336 Fayetteville Street

Raleigh,

North Carolina

27602

Facility Name:

Shearon Harris Nuclear Power Plant

License

NoseI

CPPR-158,

CPPR-159,

CPPR-160

and

CPPR-161

Inspection at:

Shearon Harris Nuclear Power Plant

ew Hill, North Carolina

I

Inspector:

R. D.

ley

Approved by:

~ l/

A. R. Herdt, Chief

Projects

Section

Reactor Construction

and Engineering

Support Branch

D te

igned

g

/d'te

Signed

SUMMARY

Inspection conducted

January

23-26,

1979

This routine,

unannounced

inspection involved 31 inspector-hours

on-site

in the areas of project status;

licensee action on previous inspection

finding; concrete

placement-main

dam conduit encasement;

licensee

identified items;

document controls;

and walk-through inspection of the

power block, batch plant, aggregate

testing laboratory,

and the energy

and environmental

center.

Results

Of the five areas

inspected,

no apparent

items of noncompliance

or

deviations

were identified in four areas;

one apparent

item of noncompli-

ance

was

found in one area (infraction-lack of document control, para-

graph 5.c).

-

'y90882II I'73

h

DETAILS

Persons

Contacted

Carolina

Power

and Li ht

Com an

(CPRL)

-S.

"T

"R

""A.

""G.

-K.

D.

D. Smith, Manager,

Power Plant Construction Department

H. Wyllie, Manager,

Nuclear Construction Section

M. Parsons,

Site Manager

Lucas,

Resident

Engineer

L. Forehand,

Principal

QA Specialist

V. Hate,

Senior

QA Engineer

L. Montague, Director of Project Analysis

Canady,

Geologist

/

Other licensee

employees

contacted

included two QA/QC specialists,

two QA/QC inspectors,

two engineers,

one aide

and two office personnel.

Daniel Construction

Com an

-W. D. Goodman,

Construction Project Manager

P.

K. Harris,

Document Control Supervisor

-Attended exit interview

Exit Interview

The inspection

scope

and findings were summarized

on January

26,

1979 with those persons

indicated in Paragraph

1, above.

The

licensee

was informed of the apparent

noncompliance

discussed

in

paragraph 5.c.

The licensee

acknowledged

these findings.

Licensee Action on Previous

Ins ection Findin s

(Open) Noncompliance

No. 400,401/78-08-03,

Failure to Calibrate

Fine Aggregate

Sieves.

The inspector

reviewed the licensee's

letter of response

dated January

2,

1979, held discussions

with the

principal

QA specialist

and the senior civil QA specialist,

reviewed

a newly issued

QC Instruction 13.5

on sieve analysis,

examined

new

sieve acceptance

equipment,

and reviewed card files and the sieve

certification records.

In that actions

planned for including sieve

acceptance

activities under the site calibration program are

incom-

plete, this item will remain open.

Unresolved

Items

Unresolved

items were not identified during this inspection.

-2"

5.

Inde endent Ins ection Effort

Pro'ect Status

and Site Ins ection

On January

23,

1979,

the inspector

conducted

a walk-through

inspection of the site which included observation of concrete

placement at the main dam,

concrete

cylinder curing in the

Energy and Environmental Center,

construction activities in

the power block area,

and facility activities at the batch

plant and aggregate

testing laboratory.

Total concrete

placed to date recently exceeded

200,000 cubic

yards.

Chicago Bridge and Iron Company

has

completed erection

of the seventh wall liner ring for the unit

1 containment

building.

Installation of vertical reinforcing steel

along

the face of unit 2 containment

and at the interface of reactor

auxiliary unit 2 has

been completed.

The combined work force

now totals

some 2,840 people.

Rigging International of Oakland, California has

been

awarded

the contract for installing heavy

components

and the contain-

ment

dome for all four units.

b.

Concrete

Placement Activities

The inspector monitored placement activities underway at the

Main Dam Conduit encasement

(second lift).

Records of the

first three batch tests for air content,

slump,

and temperature

for placement

number

MDD047 (mix M-54, 3,000 lbs.) were reviewed

and the fourth test performance

was witnessed

by the inspector

on January

23,

1979.

A pump was being used for placement of

the 290 yard pour with samples

being taken at pump discharge.

All recorded values

were within specified limits. It was

noted that approximately

63 yards

had been rejected

due

to placement

delays attributed to pump malfunction.

C.

Desi

n Control (Units

1 and 2)

CPS Administrative Procedure

AP-IX-02, "Document Distribution

and Control", Revision 7, governs site Document Control activi-

ties.

Detailed internal Work Guides

have been

completed for

the various areas of Document Control and identify individual

personnel responsibilities.

Document Control clerks have been

receiving individualized on-the-job instruction in the use of

work guides

and are certified under

CPRL training procedure

AP-IX-13.

Internal audits of field drawing files are

now

being conducted

on

a monthly basis

and office files are being

audited every other month.

To verify established

measures

preclude

the use of obsolete

drawing documents,

the inspector selected

fourteen safety-

related

drawings involving civil/structural, electrical

and

mechanical disciplines for the fuel handling,

waste processing,

containment,

and reactor auxiliary buildings.

Drawings were

selected

from stick files maintained in the Field Superintendent's

trailer (control number 001), the Field Engineering Office

trailer (control number 035), site Mechanical Engineering

Section (control number 370),

and the site Electrical Engineering

Section (control number

188).

Revision levels of drawings

from each of the above

areas

were

reviewed to determine if they were the latest revisions

recorded

in the Document Control document record card file.

A comparison

was also

made between

the record card file and the Document

Control master reproducible

drawings.

The inspector

determined that the present

system for document

control does not provide assurance

that drawings, including

changes

thereto,

which prescribe activities affecting quality

are distributed to and used at the location where the prescribed

activity is performed.

This was evidenced

by the fact that:

(1)

The master

copy of drawing CAR-2167-G-1399R3 did not

reflect that RCI-C-269 was applicable.

(2)

Master drawing CAR-2168-G-153SOlR7

referenced

FCR-AS-004

as being applicable

when it actually affected

drawing

CAR-2168-G-153S02

only.

(3)

The following two drawings selected

from the stick files

(control number 001) maintained for the Fuel Handling

Building and the Reactor Auxiliary Common Building in the

Field Superintendent's

trailer, were not stamped

to

indicate all of the applicable

FCR's

and RCI's:

(a)

Drawing CAR-2167-G-1399R3 indicated that DCN-550-135

was applicable,

but omitted reference

to RCI-C-269

which was also applicable.

(b)

Drawing CAR-2167-G-1610R3 disclosed

that FCR-C-332

and RCI-C-336 were applicable,

but omitted reference

to FCR-C-336.

(4)

The following two drawings selected

from the stick files

(control number 035) maintained in the Field Engineering

Office trailer, did not indicate the latest applicable

revision level or all appropriate

FCR/RCI documents:

(a)

A copy of drawing CAR-2167-G-1897R3 with FCR-C-188

outstanding

was found in the files after revision

4

had been issued.

Review of the Document Transmittal

form issued

by Document Control indicated that

revision

4 had been received

and the recipient

had

destroyed

revision 3.

(b)

Drawing CAR-2168-G-153SOlR7

did not reflect that

FCR-AS-001,

FCR-AS-002,

FCR-AS-003

and RCI-C-52,

RCI-C-61, RCI-C-76, RCI-C-84 and RCI-C-85 were

applicable.

The drawing did reference

DCN-650-05 which

applies to another

drawing,

CAR-2168-G-154SOl.

This matter

was discussed

with CPRL management prior to and at the

exit interview and

CPGL has

committed to investigating the problem

and taking necessary

corrective action.

This item has

been identified as

a noncompliance in the infraction

category

and

has

been designated

as 400,401/79"02-01,

"Lack of

Document Control".

Licensee Identified Items

Prior to this inspection,

the licensee identified several

items under

10 CFR 50.55(e).

Items reported were:

a

~

(Closed)

Item (400/78-08-07),

Containment drawings, details omitted.

The licensee's

final report of November 28,

1978

was reviewed

and

evaluated

and discussions

were held with the site principal gA

specialist

and resident engineer.

The omitted details

were

identified on DCN-550-112 and subsequently

incorporated

onto

drawing CAR-2167-G-0630

by revision

4 on November

13,

1978.

The

corrective actions identified in the report have been

implemented

and Region II has

no further questions.

b.

(Closed)

Item (400/79-02-02,

401/79-02-02,

402/79-01-01,

403/79-01-01),

Welder qualification Test

Coupon Thickness not

Compatible with ASME Code.

CPM, informed Region II by telephone

on January

4,

1979 that the potentially'reportable

deficiency had

been determined to be nonreportable.

The inspector held discus-

sions with the site principal gA specialist,

the welding senior

gA

specialist,

and the resident

engineer.

The applicable Deficiency

and Disposition Reports

(DDR's

190 and

194) were examined

and the

licensee's justification for nonreportability contained in a-

memorandum, from A. M. Lucas to Mr. George Forehand

dated January

9,

1979,

was evaluated.

It was determined that the wrong bend test

jig had been

used to qualify two welders

who had completed

15

safety-related

welds

on Category

3 service water pipe.

All welding

being performed by these

welders

was stopped

and the welders

were

immediately retested

without additional training and both passed

on the first test.

It was also noted that both men are experienced

welders.

The affected welds passed all routine visual inspections

plus final MT (100 percent) without any problems.

In addition,

each weld will be subjected

to bydpoatatic pressure

testing

go

verify system integrity.

The bend test jigs being used by

COL have

now been conspicuously identified to facilitate

proper selection of jig size versus

coupon thickness.

Region II

has

no further questions

at this time.

(Open)

Item (400/79-02-03),

Steam Generator

and Reactor Coolant

Pump Embedment Plate Welds.

The licensee

reported

the subject

potential deficiency to Region II on January

12,

1979.

Approxi-

mately nine anchor plates (for embeddment)

fabricated

by a

supplier to

CPGL were found to have unacceptable

linear indi-

cations after nondestructive

examination

was performed by the

supplier

and prior to performance

of post weld heat treatment

by a subtier supplier.

The plates

involved had not been

delivered to the site.

This item remains

open pending

NRC

review of the licensee's

final evaluation.