ML18003A396
| ML18003A396 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 12/12/1978 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18003A390 | List: |
| References | |
| NUDOCS 7901290410 | |
| Download: ML18003A396 (3) | |
See also: IR 05000400/1978008
Text
~gR AECIj
(4
~4
0
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTASTREET, N.W.
ATLANTA,GEORGIA 30303
DEC 12 1978
In Reply Refer To:
RII:RDB
50-400/78-08
50-401/78-08
50-402/78"08
50"403/78-08
Carolina
Power and Light Company
ATTN:
Mr. J.
A. Jones
Executive Vice President
Engineering,
Construction
and Operation
336 Fayetteville Street
Raleigh,
27602
Gentlemen:
This refers to the inspection
conducted
by Mr. R.
D. Bradley of this
office on November
14-16,
1978, of activities authorized
by NRC Construction
Permit Nos.
CPPR-158,
CPPR-159,
CPPR-160
and
CPPR-161 for the Shearon
Harris
Nuclear Power Plant facilities, and to the discussion
of our findings
held with Mr. A.
M. Lucas
on the environmental
inspection
November
15,
1978
and Mr. R.
M. Parsons
on the reactor construction inspection
November
16,
1978, at the conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in
the enclosed
inspection report.
Within these
areas,
the inspection
consisted
of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observations
by the inspectors.
Three
new unresolved
items resulted
from this inspection
and are discussed
in the enclosed
report.
These
items will be examined during subsequent
inspections.
During the inspection, it was
found that certain activities under your
license
appear
to be in noncompliance with NRC requirements.
These
items
and references
to pert.inent
requirements
are listed in the Notice of
Violation enclosed
herewith
as Appendix A.
This notice is sent
to you
~
~
~
~
pursuant
to the provisions of Section
2.201 of the NRC's "Rules of
Practice," Part 2, Title 10,
Code of Federal
Regulations.
Section
2.201
requires
you to submit to this office, within 20 days of your receipt of
this notice,
a written statement
or explanation in reply including:
(1)
corrective
steps
which have
been taken
by you and the results
achieved;
(2) corrective
steps
which will be taken to avoid further noncompliance;
and (3) the date
when full compliance vill be achieved.
790'90'//8
DEC 12 1978
Carolina
Power and Light Co.
-2-
In accordance
with Section 2.790 of the NRC's "Rules of Practice,"
Part 2, Title 10,
Code of Federal Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the NRC's Public Document
Room. If this letter contains
any information that you believe to be
proprietary, it is necessary
that you make
a written application within
20 days to this office to withhold such information from public disclosure.
Any such application must include
a full statement of.the reasons
on the
basis of which it is claimed that the information is proprietary,
and
should
be prepared
so that proprietary information identified in the
application is contained in a separate
part of the document.
If we do
not hear
from you in this regard within the specified period,
the report
will be placed in the Public Document
Room.*
Should you have
any questions
concerning this letter,
we will be glad to
discuss
them with you.
Sincerely,
C. E. Murphy, Chief
Reactor Construction
and
Engineering
Support
Branch
Enclosures:
'.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-400/78-08,
50-401/78-08,
50-402/78-08
and
50-403/78-08
cc w/encl:
Mr. Roland Parsons,
Project Manager
Shearon
Harris Nuclear
Power Plant
P. 0.
Box 10l
New Hill, North Carolina
27562