APPENDIX A NOTICE OF VIOLATION Carolina Power and Light Company License Nos.
CPPR-158, CPPR-159, CPPR-160, CPPR-161 Based on the results of the NRC 1978, it appears that certain of compliance with NRC requirements categorized as described in our 1974.
inspection conducted on November 14-16, your activities were not conducted in full as indicated below.
These items have been correspondence to you dated December 31, A.
Section F(5) of the Construction Permits
- states, in part, that the applicant shall take the necessary mitigating action, including those summarized in Section 4.6 of the Revised Environmental Statement, during construction of the station, to avoid unnecessary adverse environmental impacts from construction activities.
Contrary to the above, inspection disclosed that, at least during the two week period prior to and including inspection, no mitigating action was implemented to control or otherwise minimize the unacceptable impact of road dust resulting from construction activities at the station power block.
This is a deficiency for Units 1, 2, 3 and 4.
B.
Section 4.6 (4.6.1.1.e) of the Revised Final Environmental Statement,,
as referenced in Section F(5) of the Construction Permits,
- requires, in part, that erosion and soil runoff causing contamination of surface waters will be minimized. It further requires, during early construc-tion of the main
- dam, the use of smaller sediment traps, collection
- ditches, and intercepts to reduce the silt load to such waters.
Contrary to the
- above, inspection disclosed that the licensee failed to minimize contamination and silt loading of Buckhorn Creek at the main dam construction site.
This is a deficiency for Units 1, 2, 3 and 4.
Criterion V of Appendix B to 10 CFR 50 as implemented by Carolina Power and Light PSAR Section 1.8.5.5, states in part that, "Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings and shall be accomplished in accordance with these instructions, procedures or drawings."
Shearon Harris Specification CAR-SH-CH-6, "Concrete" and referenced ASTH Standard C-136 require that. sieves used for grain-size analysi's conform to the requirements of ASTH Standard E11.
Contrary to the above, discussions with responsible engineers indicated that sieves used for grain size analysis of fine aggregate are not checked for conformance to AS'tandard E11.
This is an infraction for Units 1 and 2.
veox seo g/~