ML18003A397

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 781114-16
ML18003A397
Person / Time
Site: Harris  
Issue date: 12/11/1978
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18003A390 List:
References
50-400-78-08, 50-400-78-8, 50-401-78-08, 50-401-78-8, 50-402-78-08, 50-402-78-8, 50-403-78-08, 50-403-78-8, NUDOCS 7901290412
Download: ML18003A397 (2)


Text

APPENDIX A NOTICE OF VIOLATION Carolina Power and Light Company License Nos.

CPPR-158, CPPR-159, CPPR-160, CPPR-161 Based on the results of the NRC 1978, it appears that certain of compliance with NRC requirements categorized as described in our 1974.

inspection conducted on November 14-16, your activities were not conducted in full as indicated below.

These items have been correspondence to you dated December 31, A.

Section F(5) of the Construction Permits

states, in part, that the applicant shall take the necessary mitigating action, including those summarized in Section 4.6 of the Revised Environmental Statement, during construction of the station, to avoid unnecessary adverse environmental impacts from construction activities.

Contrary to the above, inspection disclosed that, at least during the two week period prior to and including inspection, no mitigating action was implemented to control or otherwise minimize the unacceptable impact of road dust resulting from construction activities at the station power block.

This is a deficiency for Units 1, 2, 3 and 4.

B.

Section 4.6 (4.6.1.1.e) of the Revised Final Environmental Statement,,

as referenced in Section F(5) of the Construction Permits,

requires, in part, that erosion and soil runoff causing contamination of surface waters will be minimized. It further requires, during early construc-tion of the main
dam, the use of smaller sediment traps, collection
ditches, and intercepts to reduce the silt load to such waters.

Contrary to the

above, inspection disclosed that the licensee failed to minimize contamination and silt loading of Buckhorn Creek at the main dam construction site.

This is a deficiency for Units 1, 2, 3 and 4.

Criterion V of Appendix B to 10 CFR 50 as implemented by Carolina Power and Light PSAR Section 1.8.5.5, states in part that, "Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings and shall be accomplished in accordance with these instructions, procedures or drawings."

Shearon Harris Specification CAR-SH-CH-6, "Concrete" and referenced ASTH Standard C-136 require that. sieves used for grain-size analysi's conform to the requirements of ASTH Standard E11.

Contrary to the above, discussions with responsible engineers indicated that sieves used for grain size analysis of fine aggregate are not checked for conformance to AS'tandard E11.

This is an infraction for Units 1 and 2.

veox seo g/~