ML17360A207
Letter Sequence RAI | |
---|---|
Initiation Administration Questions Answers | |
MONTHYEARML17356A2542017-05-25025 May 2017
[Table View]Trip Report for May 16 to May 18, 2017, Audit in Support of the Review of Topical Report ANP-10332P (AURORA-B LOCA) (Non-Proprietary Version) Project stage: Other ML17356A2372017-05-25025 May 2017, 10 January 2018 Audit Report for the May 16 to May 18, 2017 Audit in Support of the Review of ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Non-proprietary Version) Project stage: Request ML19095B7612017-10-24024 October 2017 Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios Project stage: Request ML19095B7642017-10-24024 October 2017 Transmittal of Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Set 1, Non-Proprietar Project stage: RAI ML19095B7672017-10-24024 October 2017 Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Set 1, Non-Proprietary) Project stage: RAI ML17356A2472018-01-10010 January 2018 Audit Report for the May 16 to May 18, 2017 Audit in Support of the Review of ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Non-Proprietary Version) Project stage: Approval ML17356A2432018-01-10010 January 2018 Transmittal of Audit Report for the May 16 to May 18, 2017 Audit in Support of the Review of ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Non-Proprietar Project stage: Approval ML17356A2502018-01-10010 January 2018 NRC Staff Post-Acceptance Review Feedback and Questions, Areva'S Response Approach, and Subsequent NRC Staff Audit Comments for May 16 to May 18, 2017 Audit Supporting the Review of ANP-10332P (AURORA-B LOCA) Project stage: Acceptance Review ML19095B7732018-01-19019 January 2018 Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Set 2, Non-Proprietary) Project stage: RAI ML19095B7702018-01-19019 January 2018 Transmittal of Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Set 2, Non-Proprietar Project stage: RAI ML19095B7692018-01-19019 January 2018 Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Set 2) Project stage: Request ML17360A2072018-01-19019 January 2018 Transmittal of Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios Project stage: RAI ML18171A3082018-07-17017 July 2018 Request for Withholding Information from Public Disclosure in April 30, 2018, Response to Request for Additional Information Regarding Topical Report ANP-10332P, Revision 0 (CAC No. MF3829; EPID L-2014-TOP-0004) Project stage: RAI ML18242A4262018-08-31031 August 2018 Draft Safety Evaluation for Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios, (Non-Proprietary) Project stage: Draft Approval ML18323A5592018-12-18018 December 2018 Request for Withholding Information from Public Disclosure in October 31, 2018, Revised Response to Request for Additional Information Regarding Topical Report ANP-10332P, Revision 0 Project stage: RAI ML19071A2952019-03-26026 March 2019 Resolution of Comments on Draft Safety Evaluation for Topical Report ANP-10332P, Revision 0 Project stage: Draft Approval ML19057A5512019-03-26026 March 2019 Final Safety Evaluation for Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios Project stage: Request ML19057A5552019-03-26026 March 2019 Transmittal of Final Safety Evaluation for Framatome Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios. Project stage: Approval ML19052A5722019-03-26026 March 2019 Final Safety Evaluation for Framatome, Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Non-Proprietary Version) Project stage: Approval ML19183A0102019-07-25025 July 2019 Verification Review Letter for Topical Report ANP-10332P-A, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios Project stage: Other 2018-12-18 |
ML17360A207 | |
Person / Time | |
---|---|
Site: | PROJ0728 |
Issue date: | 01/19/2018 |
From: | Rowley J NRC/NRR/DLP/PLPB |
To: | Peters G AREVA |
Rowley J | |
Shared Package | |
ML17360A202 | List: |
References | |
EPID L-2014-TOP-0004, TAC MF3829 ANP-10332P, Rev 0 | |
Download: ML17360A207 (2) | |
Similar Documents at PROJ0728 | |
---|---|
Category:Letter
MONTHYEARML23117A0432023-04-20020 April 2023
[Table view]Framatome, Inc., Part 21 Notification of Existence of a Defect ML20230A0382020-08-24024 August 2020 Draft Safety Evaluation for Framatome Inc. Topical Report ANP-10323P, Revision 1, Galileo Fuel Rod Thermal Mechanical Methodology for Pressurized Water Reactor ML20211L7302020-08-0404 August 2020 August 18-20, 2020 Regulatory Audit Plan Letter for Errata to Framatome Inc. Topical Report BAW-10241PA, Revision 1, Bhtp DNB Correlation Applied with Lynxt Topical Report ML20203M3382020-07-24024 July 2020 Regulatory Audit Plan Letter for August 3-6, 2020, Audit for Framatome Inc. Topical Report Baw 10227, Revision 2, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel ML20154J9592020-06-0505 June 2020 Draft Safety Evaluation for Framatome Inc. Topical Report ANP-10337, Revision 0, Supplement 1P, Revision 0, Deformable Spacer Grid Element ML19322C9462019-12-31031 December 2019 Verification Letter of the Approval Version of Framatome Inc. Topical Report Anp 10342P-A, Revision 0, Gaia Fuel Assembly Mechanical Design (CAC: MF9078/EPID: L-2016-TOP-0016) ML19276E5772019-10-30030 October 2019 Transmittal of Final Safety Evaluation for Framatome Inc. Topical Report ANP-10346, Revision 0, ATWS-I Analysis Methodology for BWRs Using RAMONA5-FA (Non-Proprietary Version) ML19281A7832019-10-22022 October 2019 Request for Withholding Information from Public Disclosure in September 27, 2019, Fourth Response to Request for Additional Information Regarding ANP-10323P, Revision 0 ML19204A0592019-09-24024 September 2019 Transmittal of Final Safety Evaluation for Topical Report ANP-10342P, Revision 0, Gaia Fuel Assembly Mechanical Design ML19239A1812019-09-12012 September 2019 Proprietary Determination for August 7, 2019, Publication of EMF-93-177, Revision 1, Supplement 2P-A, Revision 1, Mechanical Design for BWR Fuel Channels: Z4B Material ML19240A9562019-09-12012 September 2019 Verification Letter for Topical Report EMF-93-177, Revision 1, Supplement 2P-A, Revision 1 ML19149A4892019-06-24024 June 2019 Transmittal of Final Safety Evaluation for Topical Report EMF-93-177, Revision 1, Supplement 2P, Revision 1, Mechanical Design for BWR Fuel Channels: Z4B Material ML19141A1912019-06-0303 June 2019 Transmittal of Final Safety Evaluation for Framatome Inc. Topical Report BAW-10227, Revision 1, Supplement 1P, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel ML19078A0762019-04-25025 April 2019 Audit Report for the June 11 - 13, 2018, Audit in Support of the Review of ANP-10346P, Revision 0, ATWS-I Analysis Methodology for BWRs Using RAMONA5-FA ML19101A4192019-04-23023 April 2019 Transmittal of Draft Safety Evaluation for Topical Report EMF-93-177, Revision 1, Supplement 2P, Revision 1, Mechanical Design for BWR Fuel Channels: Z4B Material. ML18360A2302019-02-0707 February 2019 Request for Withholding Information from Public Disclosure in December 19, 2018, Additional Information Regarding Anp 10342P;Gaia Fuel Assembly Mechanical Design (CAC No. MF9078; EPID L-2016-TOP-0016) ML18362A3222019-02-0707 February 2019 Request for Withholding Information from Public Disclosure in December 20, 2018, Response to Request for Additional Information Regarding ANP-10323P, Revision 0 ML18236A4092018-09-24024 September 2018 Transmittal of Final Safety Evaluation for Topical Report ANP-10341P, the ORFEO-GAIA and ORFEO-NMGRID Critical Heat Flux Correlations ML18228A8222018-09-21021 September 2018 Transmittal of Request for Additional Information Regarding Topical Report ANP-10346P, Revision 0, ATWS-I Analysis Methodology for BWRs Using RAMONA5-FA ML18178A6092018-08-0303 August 2018 Transmittal of Final Safety Evaluation for ANP-10297P-A, Revision 0, Supplement 1, the Arcadia Reactor Analysis System for PWRs Methodology Description and Benchmarking Results ML18227A1382018-07-27027 July 2018 Framatome, Inc., Response to Confirmatory Order, EA-16-016 - Independent Consultant Review ML18155A3402018-05-31031 May 2018 Framatome, Inc., Response to Request for Comment on Draft Safety Evaluation for ANP-10297P-A Revision 0, Supplement 1, the Arcadia Reactor Analysis System for PWRs Methodology Description and Benchmarking Results. ML18120A3572018-05-25025 May 2018 Transmittal of Final Safety Evaluation for Topical Report ANP-10335P, Revision 0, Ace/Atrium 11 Critical Power Correlation. ML18129A0292018-05-23023 May 2018 Transmittal Letter for Final Safety Evaluation for Topical Report ANP-10340P, Revision 0, Incorporation of Chromia-Doped Fuel Properties in Areva Approved Methods (CAC No. MF7707; EPID L-2016-TOP-0004) ML18128A0082018-05-10010 May 2018 Transmittal of Non-Proprietary Version of Final Safety Evaluation for Topical Report ANP-10333P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Control Rod Drop Accident (CRDA) ML18089A5772018-05-10010 May 2018 Transmittal of Draft Safety Evaluation for Framatome Inc. Topical Report ANP-10341P, the ORFEO-GAIA and ORFEO-NMGRID Critical Heat Flux Correlations ML18066A7802018-03-27027 March 2018 Transmittal of Draft Safety Evaluation for Framatome Inc. Topical Report ANP-10337P, Revision 0, PWR Fuel Assembly Structural Response to Externally Applied Dynamic Excitations. ML18058B9602018-03-22022 March 2018 Transmittal of Draft Safety Evaluation for Topical Report ANP-10335P, Revision 0, Ace/Atrium 11 Critical Power Correlation. ML18038B3162018-03-15015 March 2018 Transmittal of Final Safety Evaluation for Topical Report ANP-10333P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Control Rod Drop Accident (Crda). ML18025A9562018-03-13013 March 2018 Transmittal of Audit Report for the January 18, 2018, Audit in Support of the Review of ANP-10297P(A), Revision 0, Supplement 1, the Arcadia Reactor Analysis System for Pwrs, Methodology Description and Benchmarking Results ML18059A7812018-02-26026 February 2018 Framatome, Inc., Publication of ANP-10338P-A, Revision 0, Area - Arcadia Rod Ejection Accident. ML19095B7702018-01-19019 January 2018 Transmittal of Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Set 2, Non-Proprietar ML17360A2072018-01-19019 January 2018 Transmittal of Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios ML17356A2432018-01-10010 January 2018 Transmittal of Audit Report for the May 16 to May 18, 2017 Audit in Support of the Review of ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Non-Proprietar ML17346B1152018-01-0505 January 2018 Transmittal of Final Safety Evaluation for Areva Inc. Topical Report ANP-10300P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Transient and Accident Scenarios ML17353A8342018-01-0404 January 2018 Verification Letter of the Approval Version of Topical Report ANP-10334P-A (Q12 Structural Material) ML17352B2462018-01-0404 January 2018 Verification Letter of the Approval Version of Topical Report ANP-10336P-A, Revision 0, Z4B Fuel Channel Irradiation Program. ML17362A1332018-01-0404 January 2018 Verification Letter of the Approval Version of Areva Inc. Topical Report BAW-10179P-A, Revision 9, Safety Criteria and Methodology for Acceptable Cycle Reload Analyses ML19095B7642017-10-24024 October 2017 Transmittal of Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Set 1, Non-Proprietar ML17257A3922017-09-25025 September 2017 Request for Additional Information Regarding Areva Inc. Topical Report ANP-10337P, PWR Fuel Assembly Structural Response to Externally Applied Dynamic Excitations ML14303A2582014-10-27027 October 2014 10 CFR Part 21 Notification of an Error in Powerplex MCPR and LHGR Limit Input for Browns Ferry, Unit 2 ML14301A4702014-08-0707 August 2014 Material to Support Entergy Operations, Inc. License Amendment Request ML12053A3322012-02-20020 February 2012 License Renewal Commitment to Submit a Time Limiting Aging Analysis for the Reactor Vessel Internals to the NRC for Review ML1008300532010-03-22022 March 2010 Proprietary Presentation Materials for the March 19, 2010 NRC Meeting Regarding Control Rod Drive Nozzle Idtb Repair for ML0911002862009-04-16016 April 2009 Notification of Potential Part 21 on Interim Report of an Evaluation of a Deviation Pursuant to 10 CFR 21.21(a)(2) ML0903405282009-01-30030 January 2009 Generic Implications of Issue Identified During an NRC Audit of Calculations Supporting an Extended Power Uprate Submittal ML0904005172009-01-30030 January 2009 Informational Transmittal Regarding the Zircaloy-BWR Lead Use Channel Program at LaSalle County Generating Station ML0900803832009-01-0606 January 2009 Informational Transmittal Regarding the Atrium 10XM Lead Test Assembly Program at LaSalle County Generating Station, Unit 2 ML0731000822007-11-0101 November 2007 Notification of Potential 10 CFR Part 21 of an Error in BWR MCPR Calculation ML0718002452007-06-26026 June 2007 Areva, Distribution of ANP-10280P, Revision 0, Poolside Postirradiation Examination of MOX Lead Assemblies. 2023-04-20 Category:Request for Additional Information (RAI) MONTHYEARML18254A1352018-09-21021 September 2018
[Table view]Request for Additional Information for ANP-10346P, Revision 0, ATWS-I Analysis Methodology for BWRs Using RAMONA5-FA (Non-Proprietary) ML18228A8222018-09-21021 September 2018 Transmittal of Request for Additional Information Regarding Topical Report ANP-10346P, Revision 0, ATWS-I Analysis Methodology for BWRs Using RAMONA5-FA ML17360A2072018-01-19019 January 2018 Transmittal of Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios ML19095B7732018-01-19019 January 2018 Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Set 2, Non-Proprietary) ML19095B7702018-01-19019 January 2018 Transmittal of Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Set 2, Non-Proprietar ML19095B7672017-10-24024 October 2017 Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Set 1, Non-Proprietary) ML19095B7642017-10-24024 October 2017 Transmittal of Request for Additional Information Regarding Areva Inc. Topical Report ANP-10332P, Revision 0, AURORA-B: an Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios (Set 1, Non-Proprietar ML17257A3922017-09-25025 September 2017 Request for Additional Information Regarding Areva Inc. Topical Report ANP-10337P, PWR Fuel Assembly Structural Response to Externally Applied Dynamic Excitations 2018-09-21 |
Text
OFFICIAL USE ONLY - PROPRIETARY INFORMATION January 19, 2018 Mr. Gary Peters, Director Licensing and Regulatory Affairs Framatome 3315 Old Forest Road Lynchburg, VA 24501
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING AREVA INC.
TOPICAL REPORT ANP-10332P, REVISION 0, AURORA-B: AN EVALUATION MODEL FOR BOILING WATER REACTORS; APPLICATION TO LOSS OF COOLANT ACCIDENT SCENARIOS (TAC NO. MF3829/EPID: L-2014-TOP-0004)
Dear Mr. Peters:
By letter dated March 25, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14091A222), AREVA INC. (AREVA) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review and approval Topical Report ANP-10332P, Revision 0, AURORA-B: An Evaluation Model for Boiling Water Reactors; Application to Loss of Coolant Accident Scenarios. Upon review of the information provided, the NRC staff has determined that additional information is needed to complete the review. On December 21, 2017, Alan Meginnis, AREVA Product Licensing Manager, and I agreed that the NRC staff will receive the response to the enclosed Request for Additional Information (RAI) questions within 6 months from the date of this letter.
If you have any questions regarding the enclosed RAI questions, please contact me at 301-415-4053.
Sincerely,
/RA/
Jonathan G. Rowley, Project Manager Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Project No. 728
Enclosure:
RAI Questions (Proprietary)
NOTICE: The enclosure transmitted herewith contains Official Use Only - Proprietary Information. When separated from the enclosure, this transmittal document is decontrolled.
OFFICIAL USE ONLY - PROPRIETARY INFORMATION
ML17360A207; RAI - ML17360A205; Package - ML17360A202;
- concurred via e-mail NRR-106 OFFICE PLPB/PM PLPB/LA* SNPB/BC PLPB/BC PLPB/PM NAME JRowley DHarrison RLukes DMorey JRowley DATE 1/11/18 1/9/18 1/17/18 1/18/18 1/19/18