L-96-016, Monthly Operating Repts for Jul 1996 for Point Beach Nuclear Plant Units 1 & 2

From kanterella
(Redirected from L-96-016)
Jump to navigation Jump to search
Monthly Operating Repts for Jul 1996 for Point Beach Nuclear Plant Units 1 & 2
ML20116K371
Person / Time
Site: Point Beach  
Issue date: 07/31/1996
From: Patulski S, Vander Velde B
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PBL-96-0163, PBL-96-163, NUDOCS 9608150031
Download: ML20116K371 (9)


Text

,

\\

\\

Wisconsin

~-

1 Electnc POWER COMPANY Point Beach Nuclear Plant (414) 755-2321 6610 Nuclear Rd., Two Rivers, WI 54241 PBL 96-0163 l

August 5,1996 i

l l

l Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington,DC 20555 l

Gentlemen:

l l

DOCKETS 50-266 AND 50-301 l

MONTHLY OPERATING REPORTS l

POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of July 19%.

Sincerely, S. A. Patvird;i PBNP Manager smb Attachments cc:

L. L. Smith, PSCW NRC Regional Administrator, Region Ill NRC Resident Inspector

,QM k

\\ \\

l 9608150031 960731 PDR ADOCK 05000266 k

R PDR A subufmofHismashiEtxg Ovpmstkur

OPERATING DATA REPORT DOCKET NO. 50-266 DATE: 08/05/96 COMPLETED BY: B. J. Vander Velde TELEPHONE: 414-755-6681 OPERATING STATUS

~

'~~'

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1

[ NbfES

2. REPORTING PERIOD: July - 1996
3. LICENSED THERMAL POWER (MWT): 1518.5
4. NAMEPLATE RATING (GROSS MWE): 523.8
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (lF ANY):

NA i

THIS MONTH YEAR TO DATE CUMULATIVE I

11. HOURS IN REPORTING PERIOD 744.0 5,111.0 225,599.0 l
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4,546.5 189,200.9 L
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3

[

14. HOURS GENERATOR ON LINE 744.0 4,500.6 185,982.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,128,942.0 6,759,093.0 263,975,242.0
17. GROSS ELECTRICAL ENERGY GENERATED 384,840.0 2,305,770.0 89,212,140.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 368,276.0 2,204,887.5 85,057,972.0 i
19. UNIT SERVICE FACTOR 100.0 %

88.1 %

82.4 %

20. UNIT AVAILABILITY FACTOR 100.0 %

88.1 %

82.8 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 102.1 %

88.9 %

77.4 %

22. UNIT CAPACITY FACTOR (USING DER NET) 99.6 %

86.8 %

75.9 %

l

23. UNIT FORCED OUTAGE RATE O.0%

0.0%

1.5%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

None

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA i

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 d

9

..m.

POINT BEACH NUCLEAR PLANT DOCKET NO.

50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 1 MONTH JULY -

1996 DATE 8/1/96 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL I

DAY MWe NET DAY MWe NET DAY MWe NET f

i 1

496 11 496 21 487 6

2 497 12 496 22 496 3

496 13 496 23 496 4

496 14 496 24 496 5

496 15 497 25 495 6

497 16 497 26 495 7

493 17 496 27 494 l

8 496 18 497 28 490 i

9 496 19 497 29 492 10 495 20 497 30 489 31 489

POINT BEACH NUCLEAR PLANT Docket No.

50-266 Unit Name Point Beach. Unit 1 UNIT SIIUTDOWNS AND POWER REDUCTIONS Date 8/5/96 Completed By B. J. Vander Velde REPORT MONTil JULY - 1996 Telephone No.

414/755-6681 Method of Ucensee Event Duration Reactor Report No.

Symem Component Cause and Corrective Action No.

Date Type' (Hours)

Reason' Shut Down' Cale*

Code' To Prevent Recurrence NA NA NA NA NA NA NA NA NA NA

'F: Forced

' Reason:

' Method:

Txhibit G -Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scrum data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-Ol61)

D - Regulatory Restriction 4 - Continuation of E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain)

Yxhibit I-Same Source G - Operational Error (explain)

H - Other (explain)

PBF-0028b (03-90)

k.

DOCKET NO.

50-266 UNIT NAME Point Beach Unit 1 DATE 8/5/96 COMPLETED BY B. J. Vander Velde TELEPHONE 414/755-6681 i

Unit 1 operated at an average of 495 MWe net for the July,1996 report period.

i i

Safety-related maintenance included:

l

1. P-1B reactor coolant pump, flow indicators calibrated.
2. HX-1B steam generator, level controller box replaced.
3. P-10A/B residual heat removal pump, boric acid cleaned and fittings tightened.
4. HX-3 A/B non-regenerative heat exchanger, fittings tightened.
5. C-2 personnel access air lock, seals cleaned.

i

6. PT-485 high pressure turbine, drawings updated.
7. HX-8B boric acid evaporator, gaskets replaced.

i

8. D-07 DC station battery charger, caps replaced.
9. HB-19 service water piping to engineered safeguards, temporary patch installed.
10. SC-953 hot leg sample line, fitting replaced.

l l

l t

4 i

OPERATING DATA REPORT E

DOCKET NO. 50-266 I

f DATE: 08/05/96 COMPLETED BY: B. J. Vander Velde L

i TELEPHONE: 414-755-6681 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2

. NOTES

2. REPORTING PERIOD: July - 1996
3. LICENSED THERMAL POWER (MWT): 1518.5
4. NAMEPLATE RATING (GROSS MWE): 523.8
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): Power 90%
10. REASONS FOR RESTRICTIONS, (IF ANYl:

Self-imposed restriction because of SG tube plugging, pending further evaluation.

THIS MONTH YEAR TO DATE CUMULATIVE i

11. HOURS IN REPORTING PERIOD 744.0 5,111.0 210,384.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744,0 5,095.5 184,422.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE 744.0 5,091.9 181,946.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,015,429.0 6,946,734.0 261,478,887.0
17. GROSS ELECTRICAL ENERGY GENERATED 347,150.0 2,381,260.0 88.884,520.0
18. NET ELECTRICAL ENERGY GENERATED (MWHf 330,426.0 2,269,094.5 84,733,744.0 19 UNIT SERVICE FACTOR 100.0 %

99.6 %

86.5 %

20. UNIT AVAILABILITY FACTOR 100.0 %

99.6 %

86.6 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 91.6 %

91.5 %

82.5 %

22. UNIT CAPACITY FACTOR (USING DER NET) 89.4 %

89.3 %

81.0 %

23. UNIT FORCED OUTAGE RATE O.0%

0.4%

0.9%

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling /SGRP, 10/05/96, 70 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 i

POINT BEACH NUCLEAR PLANT DOCKET NO.

50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 2 MONTH JULY -

1996 DATE 8/1/96 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY

{

POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1

446 11 446 21 444 2

446 12 446 22 429 3

446 13 447 23 436 4

446 14 447 24 445 5

447 15 446 25 444 6

446 16 446 26 444 7

446 17 447 27 444 8

446 18 447 28 439 9

445 19 446 29 442 10 444 20 448 30 438 31 438

POINT BEACH NUCLEAR PLANT Docket No.

50-301 Unit Name Point Beach. Unit 2 UNIT SHUTDOWNS AND POWER REDUCTIONS Date 8/5/96 Completed By B. J. Vander Velde REPORT MONTH JULY - 1996 Telephone No.

414/755-6681 Method of Ucenace Event Duration Reactor Report No.

Symem Component Cause and Corrective Action No.

Date Type' (Hours)

Reason' Shut Down' Code

  • Caie' To Prevent Recurrence 2

960722 NA 0

B 5

NA CH PUMPB The unit was reduced to 80% power for repair of 2P27A heater drain tank pung and to perform atmospheric steem dung tests, stop valve tests, and crossover steam dump tests.

I

'F: Forced Reason:

' Method:

' Exhibit G - Instmetions 2

S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Ratriction 4 - Continuation of E - Operator Training &

Previous Shutdown Licensing Exam 5 - Reduced Imd F - Administrative 6 - Other (explain)

' Exhibit I - Same Source G - Operational Error (explain)

H - Other (explain) l PBF-002Pb (03C3)

... _.. -... _.. - =

DOCKET NO.

50-301 UNIT NAME Point Beach Unit 2 DATE 8/5/%

COMPLETED BY B. J. Vander Velde TELEPHONE 414/755-6681 Unit 2 operated at an average of 444 MWe net for the July,1996 report period.

Safety-related maintenance included:

1. MS-2016 steam generator steam header atmospheric steam dump control valve, pipe cap seal welded and packing adjusted.

i

)

.