L-96-016, Monthly Operating Repts for Jul 1996 for Point Beach Nuclear Plant Units 1 & 2
| ML20116K371 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 07/31/1996 |
| From: | Patulski S, Vander Velde B WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| PBL-96-0163, PBL-96-163, NUDOCS 9608150031 | |
| Download: ML20116K371 (9) | |
Text
,
\\
\\
~-
1 Electnc POWER COMPANY Point Beach Nuclear Plant (414) 755-2321 6610 Nuclear Rd., Two Rivers, WI 54241 PBL 96-0163 l
August 5,1996 i
l l
l Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington,DC 20555 l
Gentlemen:
l l
DOCKETS 50-266 AND 50-301 l
MONTHLY OPERATING REPORTS l
POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of July 19%.
Sincerely, S. A. Patvird;i PBNP Manager smb Attachments cc:
L. L. Smith, PSCW NRC Regional Administrator, Region Ill NRC Resident Inspector
,QM k
\\ \\
l 9608150031 960731 PDR ADOCK 05000266 k
R PDR A subufmofHismashiEtxg Ovpmstkur
OPERATING DATA REPORT DOCKET NO. 50-266 DATE: 08/05/96 COMPLETED BY: B. J. Vander Velde TELEPHONE: 414-755-6681 OPERATING STATUS
~
'~~'
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1
[ NbfES
- 2. REPORTING PERIOD: July - 1996
- 3. LICENSED THERMAL POWER (MWT): 1518.5
- 4. NAMEPLATE RATING (GROSS MWE): 523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (lF ANY):
NA i
THIS MONTH YEAR TO DATE CUMULATIVE I
- 11. HOURS IN REPORTING PERIOD 744.0 5,111.0 225,599.0 l
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4,546.5 189,200.9 L
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
[
- 14. HOURS GENERATOR ON LINE 744.0 4,500.6 185,982.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,128,942.0 6,759,093.0 263,975,242.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 384,840.0 2,305,770.0 89,212,140.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 368,276.0 2,204,887.5 85,057,972.0 i
- 19. UNIT SERVICE FACTOR 100.0 %
88.1 %
82.4 %
- 20. UNIT AVAILABILITY FACTOR 100.0 %
88.1 %
82.8 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.1 %
88.9 %
77.4 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 99.6 %
86.8 %
75.9 %
l
- 23. UNIT FORCED OUTAGE RATE O.0%
0.0%
1.5%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA i
DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 d
9
..m.
POINT BEACH NUCLEAR PLANT DOCKET NO.
50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 1 MONTH JULY -
1996 DATE 8/1/96 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL I
DAY MWe NET DAY MWe NET DAY MWe NET f
i 1
496 11 496 21 487 6
2 497 12 496 22 496 3
496 13 496 23 496 4
496 14 496 24 496 5
496 15 497 25 495 6
497 16 497 26 495 7
493 17 496 27 494 l
8 496 18 497 28 490 i
9 496 19 497 29 492 10 495 20 497 30 489 31 489
POINT BEACH NUCLEAR PLANT Docket No.
50-266 Unit Name Point Beach. Unit 1 UNIT SIIUTDOWNS AND POWER REDUCTIONS Date 8/5/96 Completed By B. J. Vander Velde REPORT MONTil JULY - 1996 Telephone No.
414/755-6681 Method of Ucensee Event Duration Reactor Report No.
Symem Component Cause and Corrective Action No.
Date Type' (Hours)
Reason' Shut Down' Cale*
Code' To Prevent Recurrence NA NA NA NA NA NA NA NA NA NA
'F: Forced
' Reason:
' Method:
Txhibit G -Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scrum data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-Ol61)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain)
Yxhibit I-Same Source G - Operational Error (explain)
H - Other (explain)
PBF-0028b (03-90)
k.
DOCKET NO.
50-266 UNIT NAME Point Beach Unit 1 DATE 8/5/96 COMPLETED BY B. J. Vander Velde TELEPHONE 414/755-6681 i
Unit 1 operated at an average of 495 MWe net for the July,1996 report period.
i i
Safety-related maintenance included:
l
- 1. P-1B reactor coolant pump, flow indicators calibrated.
- 2. HX-1B steam generator, level controller box replaced.
- 3. P-10A/B residual heat removal pump, boric acid cleaned and fittings tightened.
- 4. HX-3 A/B non-regenerative heat exchanger, fittings tightened.
- 5. C-2 personnel access air lock, seals cleaned.
i
- 6. PT-485 high pressure turbine, drawings updated.
- 7. HX-8B boric acid evaporator, gaskets replaced.
i
- 8. D-07 DC station battery charger, caps replaced.
- 9. HB-19 service water piping to engineered safeguards, temporary patch installed.
- 10. SC-953 hot leg sample line, fitting replaced.
l l
l t
4 i
OPERATING DATA REPORT E
DOCKET NO. 50-266 I
f DATE: 08/05/96 COMPLETED BY: B. J. Vander Velde L
i TELEPHONE: 414-755-6681 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2
. NOTES
- 2. REPORTING PERIOD: July - 1996
- 3. LICENSED THERMAL POWER (MWT): 1518.5
- 4. NAMEPLATE RATING (GROSS MWE): 523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): Power 90%
- 10. REASONS FOR RESTRICTIONS, (IF ANYl:
Self-imposed restriction because of SG tube plugging, pending further evaluation.
THIS MONTH YEAR TO DATE CUMULATIVE i
- 11. HOURS IN REPORTING PERIOD 744.0 5,111.0 210,384.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744,0 5,095.5 184,422.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
- 14. HOURS GENERATOR ON LINE 744.0 5,091.9 181,946.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,015,429.0 6,946,734.0 261,478,887.0
- 17. GROSS ELECTRICAL ENERGY GENERATED 347,150.0 2,381,260.0 88.884,520.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWHf 330,426.0 2,269,094.5 84,733,744.0 19 UNIT SERVICE FACTOR 100.0 %
99.6 %
86.5 %
- 20. UNIT AVAILABILITY FACTOR 100.0 %
99.6 %
86.6 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 91.6 %
91.5 %
82.5 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 89.4 %
89.3 %
81.0 %
- 23. UNIT FORCED OUTAGE RATE O.0%
0.4%
0.9%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling /SGRP, 10/05/96, 70 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22,1977 i
POINT BEACH NUCLEAR PLANT DOCKET NO.
50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach. Unit 2 MONTH JULY -
1996 DATE 8/1/96 COMPLETED BY Brian J. Vander Velde TELEPHONE (414)755-6681 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY
{
POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1
446 11 446 21 444 2
446 12 446 22 429 3
446 13 447 23 436 4
446 14 447 24 445 5
447 15 446 25 444 6
446 16 446 26 444 7
446 17 447 27 444 8
446 18 447 28 439 9
445 19 446 29 442 10 444 20 448 30 438 31 438
POINT BEACH NUCLEAR PLANT Docket No.
50-301 Unit Name Point Beach. Unit 2 UNIT SHUTDOWNS AND POWER REDUCTIONS Date 8/5/96 Completed By B. J. Vander Velde REPORT MONTH JULY - 1996 Telephone No.
414/755-6681 Method of Ucenace Event Duration Reactor Report No.
Symem Component Cause and Corrective Action No.
Date Type' (Hours)
Reason' Shut Down' Code
- Caie' To Prevent Recurrence 2
960722 NA 0
B 5
NA CH PUMPB The unit was reduced to 80% power for repair of 2P27A heater drain tank pung and to perform atmospheric steem dung tests, stop valve tests, and crossover steam dump tests.
I
'F: Forced Reason:
' Method:
' Exhibit G - Instmetions 2
S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Ratriction 4 - Continuation of E - Operator Training &
Previous Shutdown Licensing Exam 5 - Reduced Imd F - Administrative 6 - Other (explain)
' Exhibit I - Same Source G - Operational Error (explain)
H - Other (explain) l PBF-002Pb (03C3)
... _.. -... _.. - =
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE 8/5/%
COMPLETED BY B. J. Vander Velde TELEPHONE 414/755-6681 Unit 2 operated at an average of 444 MWe net for the July,1996 report period.
Safety-related maintenance included:
- 1. MS-2016 steam generator steam header atmospheric steam dump control valve, pipe cap seal welded and packing adjusted.
i
)
.