November 8, 199 Docket Nos.

50-250 and 50-251 Mr. J.

H. Goldberg Executive Vice President Florida Power and Light Company P. 0.

Box 14000 Juno Beach, Florida 33408-0420

Dear Mr. Goldberg:

SUBJECT:

UNIMPLEMENTED GENERIC SAFETY ISSUES AT TURKEY POINT UNITS 3

AND 4 On April 25, 1990 the staff issued Generic Letter 90-04 which requested infor-

-mation concerning the implementation status of certain generic safety issues (GSIs) at your facility.

Based on your response to this Generic Letter, dated June 27, 1990 (L-90-216),

and subsequent letters dated September 28, 1990 (L-90-336),

and October 31, 1990 (L-90-380),

and our own records and discussions with your staff, we have updated our database on GSI implementation status.

The results of this effort were presented to the Commission at a meeting on October 25, 1990.

The enclosure to this letter summarizes the staff's understanding of the current status of those GSIs which remain unimplemented at Turkey Point Units 3 and 4.

He appreciate the assistance you provided in responding to Generic Letter 90-04 and we encourage your timely completion of those GSIs listed in the enclosure.

Please contact me if you have any questions or comments about the enclosed information.

Enclosure:

As stated cc w/enclosure:

See next page

/

t

~ yg Sincerely,

{Original Signed By)

Gordon E. Edison, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

.D:PDII-,2

llB ko
11/ 9 /90
M:PDII-
L

-2

GEdison:sl NAME
11/

/90 DATE

11/

/90

~

C R

RDCP Document Name:

GSI URKEY POINT q0f}f50062 9 o00250 PDR ADOCK- 0 P

o4

W I

IC W

4 4

e

~ /4 4

4' If a

/h

~

~

,/

4

'll 4'/

~

a

~

4 ~

4 4 4

I d

al II I' Wh I

y W

W II II

DISTRIBUTION:

NRC 8 Local PDRs PD22 Rdg. File S.

Varga G. Lainas D. Hiller G. Edison OGC

'E. Jordan ACRS (10) f4. Sinkule, RII H. Berkow R. Scholl

lS ~ Kf',

H s I 1 tl I

~ (

'N gg

. I I

,~Jp b

wll "f'

Mr. J.

H. Goldberg Florida Power and Light Company Turkey Potat Plant CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. Thomas F. Plunkett, Site Vice President Tut key Point Nuclear P'lant Florida Power and Light Company P.O.

Box 029100 Miami, F lorida 33102 County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 57-1185 Miami, Florida 33257-1185 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tal 1ahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning 8 Budget Executive Office of the Governor

'he Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of F lorida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahasse, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102

~

~

ENCLOSURE UNIMPLEMENTED GSIs AT TURKEY POINT UNITS 3 AND 4 GSI MO.

43 TITLE Reliability of Air Systems PROJECTED IMPLEMENTATION

-DATE 12/17/90 REMARKS Will be com-pleted during dual unit outage 51 Improving the Reliability 12/91 of Open-Cycle Service Water Systems 67.3.3 75 Improved Accident Monitoring Salem ATWS Item 2.2.2, Vendor Interface for Safety-Related Components 12/90 1/1/91 Area radiation monitoring instrumentation.

Staff reviewing 99 RCS/RHR Suction Line Valve 12/91 Interlock on PWRs Will be completed during dual unit 'outage