L-90-380, Submits Implementation Status,Per Generic Ltr 83-28,Items 3.2.1 & 3.2.2 Re Generic Implications of Salem ATWS Events. Summary of Actions Completed Listed

From kanterella
(Redirected from L-90-380)
Jump to navigation Jump to search
Submits Implementation Status,Per Generic Ltr 83-28,Items 3.2.1 & 3.2.2 Re Generic Implications of Salem ATWS Events. Summary of Actions Completed Listed
ML17348A712
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/31/1990
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-83-28, L-90-380, NUDOCS 9011080131
Download: ML17348A712 (3)


Text

)ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM

~

~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9011080131 DOC.DATE: 90/10/31 NOTARIZED:

NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.

Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Submits implementation status,per GL 83-28,Items 3.2.1 6

3.2.2 re generic implications of Salem ATWS events.

DISTRIBUTION CODE:

A055D COPIES RECEIVED:LTR ENCL M SIZE:

(

TITLE: OR/Licensing Submittal:

Salem ATWS Even s GL-83 8

NOTES:

DOCKET g

05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: NRR/DEST/ESB 8D NRR/DOEA/OGCB11 NRR/DST/SPLB 8D OGC/HDS2 RES/DSIR/EIB EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-2 PD NRR/DLPQ/LPEB10 NRR/DST/SICB 7E OC/LFMB REGFREE 46%t+l8~

NSIC COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DIPI'RIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 15 ENCL

PIRL OCT 31 1990 L-90-380 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Status of Implementation Required Actions Based on Generic Implications of Salem ATWS Events Generic Letter 83-28 Items 3.2.1 and 3.2.2 By letter L-90-95 dated April 5,

1990, Florida Power and Light Company (FPL) provided the implementation status of actions required from Generic Letter (GL) 83-28, for Turkey Point Units 3

and 4.

Since issuance of the April 5, 1990 letter, the remaining actions required to comply with the requirements of items 3.2.1 and 3.2.2 have been completed by FPL.

A summary of these actions is as follows:

0 Item 3.2.1:

FPL has performed a re-review of existing maintenance procedures to ensure that post maintenance testing adequately verifies component capability to perform all required safety functions.

The re-review of the above procedures was completed on October 17, 1989.

o Item 3.2.2:

FPL has performed a re-review of test and maintenance procedures to ensure that appropriate vendor and engineering recommendations for testing and maintenance are incorporated.

The re-review of the above items was completed on August 1, 1990.

Should there be any additional questions concerning these

items, please contact us.

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant Nuclear TFP/RJT/r jt CC:

goes

//p Stewart D. Ebneter, Regional Administrator, Region II,USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 90ii080i3i 90i03i PDR ADOCI< 05000250 p

P13C an FPL Group company

'," 7LP>>