)ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM
~
~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9011080131 DOC.DATE: 90/10/31 NOTARIZED:
NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.
Florida Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Submits implementation status,per GL 83-28,Items 3.2.1 6
3.2.2 re generic implications of Salem ATWS events.
DISTRIBUTION CODE:
A055D COPIES RECEIVED:LTR ENCL M SIZE:
(
TITLE: OR/Licensing Submittal:
Salem ATWS Even s GL-83 8
NOTES:
DOCKET g
05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: NRR/DEST/ESB 8D NRR/DOEA/OGCB11 NRR/DST/SPLB 8D OGC/HDS2 RES/DSIR/EIB EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD2-2 PD NRR/DLPQ/LPEB10 NRR/DST/SICB 7E OC/LFMB REGFREE 46%t+l8~
NSIC COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DIPI'RIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 15 ENCL
PIRL OCT 31 1990 L-90-380 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Status of Implementation Required Actions Based on Generic Implications of Salem ATWS Events Generic Letter 83-28 Items 3.2.1 and 3.2.2 By letter L-90-95 dated April 5,
- 1990, Florida Power and Light Company (FPL) provided the implementation status of actions required from Generic Letter (GL) 83-28, for Turkey Point Units 3
and 4.
Since issuance of the April 5, 1990 letter, the remaining actions required to comply with the requirements of items 3.2.1 and 3.2.2 have been completed by FPL.
A summary of these actions is as follows:
0 Item 3.2.1:
FPL has performed a re-review of existing maintenance procedures to ensure that post maintenance testing adequately verifies component capability to perform all required safety functions.
The re-review of the above procedures was completed on October 17, 1989.
o Item 3.2.2:
FPL has performed a re-review of test and maintenance procedures to ensure that appropriate vendor and engineering recommendations for testing and maintenance are incorporated.
The re-review of the above items was completed on August 1, 1990.
Should there be any additional questions concerning these
- items, please contact us.
Very truly yours, T. F. Plunkett Vice President Turkey Point Plant Nuclear TFP/RJT/r jt CC: