Text
Docket Nos.
50-250 and 50-251 Mr. J.
H. Goldberg Executive Vice President Florida Power and Light Company P.O.
Box.14000 Juno Beach, Florida 33408-0420
Dear Mr. Goldberg:
This completes the staff's effort on TAC numbers 53726 and 53727.
Part 2 of Item 2.2 will be handled separately after receipt of your response to Generic Letter 90-03.
Sincerely, August 9, 1990 DISTRIBUTION Docket File
- NRC & LPDRs SVarga 14/E/4 GLainas 14/H/3 HBerkow GMunder GEdison DLaBarge DMiller OGC EJordan MNBB"3302 ACRS (10)
MSinkule RII I
SUBJECT:
TURKEY POINT UNITS 3 AND 4 - GENERIC LETTER 83-28 ITEM 2.2 PART 1 (TAC NOS.
53726 AND 53727)
Generic'Letter 83-28, Item 2.2. 1 required licensees to describe their program for properly classifying all safety-related components on documents and in in-formation handling systems used to control plant activities affecting those components.
You responded to this item with submittals dated November 8, 1983, and April 17, 1987.
The staff has evaluated these submittals
- and, as described in our Safety Evaluation (Enclosure 1) and our contractor's Technical Evaluation Report (Enclosure 2), finds that they are acceptable.
Original signed by,
Enclosures:
As stated cc w/enclosures:
See next page Gordon E. Edison, Sr. Project Manager Project Directorate II"2 Division of'eactor Projects - I/Il Office of Nuclear Reactor Regulation OFC:L I-2:PE:PDII~2
.p"
~\\
~
W
~
W
~ ~
NAME r: jkd DATE: /90 ': 0 // $'//90 WW%%
W W
1s OFFICIAL RECORD COPY Document Name:
GL 8328 TURKEY
- PM:PDII-2:D: PDg-g) 4
- GEdison
- HBerkow
.:gs gizmo: g apso POINT 9008140113 900809 PI3R ADOCK 05000250 P
PI3C I
MW 3
'I 33 3'
~
MW 3
~ Mr. J.
H. Goldberg Florida Power and Light Company Turkey Point Plant CC:
Harold F. Reis, Esquire Newman and Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 John T. Butler, Esquire
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Fl ori da 33131-2398 Mr.
K.
N. Harris, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 57-1185
- Miami, F 1 orida 33257-1185 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399"0700 Intergovernmental Coordination and Review Office of Planning 8 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S.
Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.
Box 029100 Miami, Florida 33102