Forwards Request for Addl Info Following Preliminary Review of Responses to Generic Ltr 83-28,Items 2.1,2.2,3.1.3, 3.2.3,4.4 & 4.5.Supplementary Info Required within 60 Days for Item 2.2.2 & 90 Days for Item 4.5.3
ML17346A910
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/11/1985
From: Varga S
Office of Nuclear Reactor Regulation
To: Williams J
FLORIDA POWER & LIGHT CO.
References
GL-83-28, TAC-53726, TAC-53727, TAC-54036, TAC-54037, NUDOCS 8503260017
Download: ML17346A910 (6)


Text

March ll, 1985 Docket Nos.

50-250 and 50-251 Mr. J.

W. Williams, Jr., Vice President Nuclear Energy Department Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408

Dear Mr. Williams:

ORB¹1 RDG

OELD, BGrimes DMcDonald ACRS (10)

TAlexion DLasher DBeckham Docket file LPDR HThompson EJordan JPar tlow CParrish ORB¹1 Gray file RAuluck JStevens

Reference:

TAC Numbers

53726, 53727, 54036 and 54037

'UBJECT:

RE(VEST FOR ADDITIONAL INFORMATION FOLLOWING, PRELIMINARY STAFF REVIEW OF TURKEY POINT UNITS 3 AND 4 RESPONSES TO GENERIC LETTER 83-28 The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Items 2. 1, 2.2,

3. 1.3, 3.2.3, 4.4 and 4.5.

For the Turkey Point Plant, your responses were found to be incomplete for Items 2.2.2 and 4.5.3.

,Brief 'descriptions of the deficiencies are given as guidelines for corrective action in the enclosed request for additional information.

Efforts, by Owners Groups, INPO and NSSS Vendors have been or are being made to produce generic responses that may be useful in meeting the requirements of the above items.

You may wish to contact your Owner's Group or INPO regarding the applicability of such generic responses to your plant.

In order to preserve our present review schedule, the staff needs to have the supplementary information within 60 days for Item 2.2.2, and within 90 days for Item 4.5.3.

We request your cooperation in meeting this schedule.

This request for additional information was approved by the Office of Management and Budget under clearance number 3150-0011 which expires April 30, 1985.

Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.

C.

20503.

Sincerely,

/s/SAVarga Steven A. Var ga, Chief Operating Reactors Branch No.

1 Division of Licensing

Enclosure:

Request for Additional Information ORB¹1: DL RB¹1: DL CParri sh DMcDonald/ts 03/( /85 03/@+85 85032600i7 8503ii PDR ADOCK 05000250I P

PDR a

03/i 85 L

)

I I

I I

hl

~

~

I I

S

~

I h~

h I

I I III

qP,S REGS~

(4 Cy I

nO D$

'+0 qO

+>>*++

Docket Nos.

50-250 and 50-251 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March ll, 1985 Mr. J.

W. Williams, Jr.,

Vice President Nuclear Energy Department Florida Power and Light Company Post Office Box 14000 Juno

Beach, Florida 33408

Dear Mr. Williams:

Reference:

TAC Numbers

53726, 53727, 54036 and 54037

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOLLOWING PRELIMINARY STAFF. REVIEW OF TURKEY POINT UNITS 3 AND 4 RESPONSES TO GENERIC LETTER 83-28 The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28 Items 2. 1, 2.2,

3. 1.3, 3.2.3, 4.4 and 4.5.

For the Turkey Point Plant, your responses were found to be incomplete for Items 2.2.2 and 4.5.3.

Brief descriptions of the deficiencies are given. as guidelines for corrective action in the enclosed request for additional information.

Efforts by Owners Groups, INPO and NSSS Vendors have been or are being made to produce generic responses that may be useful in meeting the requirements of the above items.

You may wish to contact your Owner's Group or INPO regarding the applicability of such generic responses to your plant.

In order to preserve our present review schedule, the staff needs to have the supplementary information within 60 days for Item 2.2.2, and within 90 days for Item 4.5.3.

We request your cooperation in meeting this schedule.

This request for additional information was approved by the Office of Management and Budget under clearance number 3150-0011 which expires April 30, 1985.

Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D.

C.

20503.

Si cerely, e

rg, perating Reactors Division of Licens 1

B anch No.

1

Enclosure:

Request for Additional Information

~

~

.J.

W. Williams, Jr.

Florida Power and Light Company Turkey Point Plants Units 3 and 4

cc:

Harold F. Reis, Equire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Norman A. Coll, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr.

Ken N. Harris, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Mr. M. R; Stierheim County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 57-1185 Miami, Fl'orida 33257-1185 Regional Radiation Representative EPA Region IV 345 Courtland Street, N.W.

Atlanta, GA 30308 Intergovernmental Coordination and Review Office of Planning 8 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 James P. O'Reilly Regional Administrator, Region II U.S Nuclear Regulatory Commission Suite 2900 101 Marietta Street
Atlanta, GA 30303 Martin H. Hodder, Esquire 1131 N.E. 86th Street Miami, Florida 33138 Joette Lorion 7269 SW 54 Avenue Miami, Florida 33143 Mr. Chris J. Baker, Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Allan Schubert, Manager Public Health Physicist Department of Health and Rehabilitative Services 1323 Winewood Blvd.

Tallahassee, Florida 32301

Co.

r t

~

ENCLOSURE Request for Additional Information Turke Point Plant Units 3 and 4

Item 2.2.2 - Incomplete The licensee's response is based on the NUTAC report.

The licensee needs to present his evaluation of the NUTAC program and describe how it will be imple-mented at Dresden 2,3.

The staff found that the NUTAC program fails to add-ress the concern about establishing and maintaining an interface between all safety-related equipment.vendors and the utility. Accordingly, the licensee will need to supplement his response to address this concern.

This additional information should describe how current procedures will be modified and new ones initiated.to'eet the elements of this concern.

Item 4.5.3 - Incomplete The staff finds that modifications are not required to permit on-line testinq of the backup scram valves.

However, the staff concludes that testing of the backup scram valves (including initiating circuitry) at a refueling outage frequency, in lieu of on-line testing, is appropriate and should be included in the technical specification surveillance requirements.

The licensee needs to address this conclusion.

Regarding the scram pilot valves (including all initiatinq circuitry), the lice'nsee needs to provide the results of a review of existing or proposed intervals for on-line testing considering the concerns of, sub-items 4.5.3.1 to 4.5.3.5 of the generic letter.

The response shall show how these intervals result in high reactor trip system availability and present proposed technical specification changes for staff review.

'I