September 29, 1989 Docket Nos. 50-335, 50-389, I50=250, 50:251,'r.
Jerome H. Goldberg Executive Vice President Florida Power and Light Company Nuclear Energy Department Post Office Box 14000 Juno
- Beach, Florida 33408-0420
Dear Mr. Goldberg:
DISTRIBUTION
---NRC 8
LPDRs PD22 Rdg Fi le HBerkow SVarga 14/E/4 GLainas 14/H/3 JNorris G Edison BGrimes 9/2/2 EJordan MNBB-3302 ACRS(10)
DMiller MSinku le RII
SUBJECT:
UPCOMING AUDIT OF STATION BLACKOUT RULE, 10 CFR 50.63 - ST.
LUCIE UNITS 1 AND 2 AND TURKEY POINT UNITS 3 AND 4 The NRC staff intends to conduct an audit of the implementation of the Station Blackout Rule, 10 CFR 50.63 for St.
Lucie Units 1 and 2 and Turkey Point Units 3 and 4.
The audit will take place at your Juno Beach offices and will start at 9:00 a.m.
on October 17, 1989.
The audit team will consist of five members, three from the NRC staff and two from SAIC, the staff's consultant.
The items for discussion are shown in the Enclosure.
The exit interview will tentatively take place in the morning of October 19, 1989, unless the team finds it necessary to visit one of the sites.
The NRC Project Managers for both plants intend to attend the exit meeting.
Enclosure:
As stated CC:
with enclosures Sincerely, Original signed by Gordon E. Edison FOR Jan A. Norris, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation Ori ginal s i gned by Gordon E. Edison, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation
- SEE PREVIOUS CONCURRENCE LA:PDII-2 PM:PDII-2
- DMilier
- JNorris: jkd 09/28/89 09/28/89 S910050214 S90929 PDR ADOCK 05000250 P
PDC PM:PDII<<2
- GEdison 09/28/89 D:Q 2
- HBeric, 09/~89 f't
>>'. I f
i<<
I "j'l I
K)
~ I
)
II 1
II
'l h
4,>v tl 4>>
C' A
l
~
4 i
~
v
)4>>
4>J r'<<>><<
E.
~
jlI r
r <<'t
'I
, ~
Il V,
~ f, 4'<<4 hh t
P P
't v 'h, I'IIIt
<<V>>tl
<<h 4
44 I4,'t 4,>53>>'J<<i Jr II h
. ~
II'VI ',ll<<r, I>>
j k.l 4
t'VI 4g" II N
<<4<<>> I 4 li id ',
4<<,<<<<il V 4>>I',3
<<hll
) l l ',.I)Q
<<4 Vugh'ii v<<>>4<<
ctrl P>> II<<-', p 4 I
)>>II<<
II4 h
~
II, i
PKII "IV I>>
h r
I I <<Hi
'4 ~
v>>
tv>>rl
'h Il<<'r.
l' "t>>
4
<<*4 4 hh 'fr<<
I 4
.<<I~
,s<<h 0
II II
>>h ~ J il I r i >>
~ h, Jl A t
'vi<<wv <<i,!ar'1
>>VII >>
I i'1 <<
Il I
tt V
)<<'<<>>lf r
V i
')
J <<.II>>4>>]. Iv<<
i ~
I'>>
't
V C~
St. Lucie Unit 1&2 Turkey Point Units 3&4 CC:
Mr.. Jack Shreve Office of the Pub 1ic Counsel Room 4, Holland Building Tallahassee, Florida 32304-Senior Resident Inspector St. Lucie Plant U;S. Nuclear Regulatory Commission 7585 S.
Hwy A1A Jensen Beach, Florida 34957 State Planning
& Development Clearinghouse Office of Planning
& Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Harold F. Reis, Esq.
Newman
& Holtzinger 1615 L Street, N.W.
Washington, DC 20036 John T. Butler, Esq.
- Steel, Hector and Davis 4000 Southeast Financial Center
- Miami, Florida 33131-2398 Admir istrator
'epartment of Environmental Regulati on Power Plant Si ting Sec tion State of Flori da 2600 Blair Stone Road Tal 1ahassee, Florida 32301 Mr. Weldon B. Lewis, County Administrator St.
Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combust'ion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Roc kvi 1 le, Mar y land 20852 Plant Manager Turkey Point Nuclear Plant Florida Power arid Light Company P. 0.
Box 029100 Miami, Florida 33102 19 Mr..Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tal lahassee, Florida 32399-0?00 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia ='0323 Mr. Campbell Rich 4626 S.E. Pilot Avenue Stuart, Florida 34997 Mr. J.
H. Godlberg Executive Vice President Nuclear Energy Department Florida'Power and Light Company P.
0.
Box 14000 Juno Beach, Florida 33408-0420 Mr. K. N. Harris, Vice President" Turkey Point Nuclear Plant Florida Power and Light Company P.
0.
Box 029100
- Miami, F lorida 33102 County Manager of Metropolitan Dade County Miami, Florida 33130 Senior Resident Irispector U.S. Nuclear Regulatory Commission Turkey Point Nuclear Generating Station Post Office Box 57-1185 Miami, Florida 33257-1185 Attorney General Department of Legal Affairs The Capitol Tallahassee, F londa 32304 Intergovernmental Coordination and Review Office of Planning
& Budget Executive Office of the Governor The Cap ito 1 Bui lding Tallahassee, Florida 32301
ENCLOSURE TURKEY POINT UNITS 3 AND 4 AND ST.
LUCIE UNITS 1 AND 2
"* STATION BLACKOUT RULE, 10 CFR 50.63 ITEHS FOR DISCUSSION 1.
Discuss why the plants should not be classified as P3 sites in accordance with NUHARC 87-00 Section 3.2.1 Part 1.A.
2.
Discuss how the plants meet. (will meet) the offsite power system Group II criteria by referring to NUMARC 87-00 page 3-11 or Regulatory Guide 1.155 Table 5, p.12.
3 ~
4 ~
Confirm that the plants'rocedures have been reviewed, and h'ave been (or will be) modified to meet the station blackout response guidelines per NUNRC 87-00, Section 4.2.1, the AC power restoration guidelines per Section 4.2.2 and the severe weatherguidelines of Section 4.2.3.
Identify and discuss any exceptions to the guidelines.
Provide the number of gallons of water required for decay heat removal during the four-hour coping duration arid the minimum permissible condensate storage tank level per Technical Specifications.
If additional water.
sources are necessary for decay heat removal, identify these, list the number of gallons provided by each source and identify any plant modifi-cations and/or procedure changes needed to uti lize these'ater sources.
5.
Confirm that the AAC source will meet the criteria provided in Section 2.3.1, Appendix B, of NUNRC 87-00.
Identify and discuss any exceptions to these criteria.
In particular, discuss the single failure of 4160V Bus 3D or 4D.
Also discuss sirgle failure of 480V Load Center Bus 3H or 4H, in particular with respect to the battery chargers.
6.
Confirm that the gA guidance contained in Regulatory Guide 1.155, Appendix A will be implemented for the AAC facilities.
7.
Discuss the proposed training program associated with station blackout sce'nario.
8.
Discuss the. features of the proposed EDG reliability program, noting in particular the similarities and differences with respect to Appendix D of NUNRC 87-00.
t