Forwards Integrated Schedule Monthly Summary for Feb 1989. Extension for Completion of Mod to Air Start Motor Upgrade Until Completion of Emergency Power Sys Enhancement Program Requested.Extension Would Resolve Procurement Issues
ML17347B014
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/09/1989
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-81, NUDOCS 8903170081
Download: ML17347B014 (9)


Text

gggP~RATED D1~BUTJON, DEM04STRE04 SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8903170081 DOC.DATE: 89/03/09 NOTARIZED: NO DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Florida Power

& Light Co.

RECIP.NAME'ECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards integrated schedule monthly summary for Feb 1989.

DISTRIBUTION CODE A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal:

General Distribution NOTES:

RECXPXENT ID CODE/NAME PD2-2 LA

'EDISON,G INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DEST/SICB NUDOC STRACT FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1

0 1

1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/DOEA/TSB 11 OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 2

2 1

1 1

1 1

1 1

1 1

0 1

1 1

1 NOTE 'ZO ALL "RIDS" RECIPIERIS'IZASE HELP US lQ REDUCE WASTE CGNIACl 'IHE DOCUMENI CXKIBDL DESKi ROOM Pl-37 (EXT. 20079)

TO IZiQ62KLTE YOUR HARE PKH DIPHKBVTIGN LISTS FOR DOCUMEN1'S YOU DON'T NEEDt D

S TOTAL NUMBER OF COPIES REQUIRED:

LTTR 19 ENCL 16

ii 41

~C t ",

P.O. Box14000, Juno Beach, FL 33408-0420 MNGH 9

1989 L-89-8 1 U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Inte rated Schedule Monthl Summar Attached is the Summary Report of the Integrated Schedule generated for the month of February 1989.

The schedules discussed in this report reflect information as of the issuance date of February 17, 1989.

Updated information will be provided in subsecpxent reports.

The changes to the schedules discussed in this summary have been reviewed with the NRC Staff in accordance with the Integrated Schedule Plan.

FPL will issue the next monthly schedule in March and the next 6 month Integrated Schedule Report following the May 1989 schedule.

IS MOD 576, Air Start Motors Upgrade, is scheduled to be completed by the end of the current Unit 4

refueling outage.

This modification (the addition of a second air start motor) was one of several FPL evaluated to improve emergency diesel generator (EDG) reliability in response to Generic Letter 84-15,,

"Proposed Staff Actions to Improve and Maintain Diesel Generator Reliability."

FPL would like to reschedule this modification for completion to coincide with completion of the Emergency Power System Enhancement Project.

This extension would allow time to resolve certain procurement related

issues, permit, consideration of design alternatives based on the design of the new EDGs, and to rethink the proposed design in general to'eflect the needs and desires of the current

'operations and maintenance personnel for maintainability, operability and reliability.

3903170081 890309 PDR AGOCK 05000250 R

PDC an FPL Group company

0 "J

U.

S. Nuclear Regulatory, Commission L-89-81 Page two Since this modification is a Schedule A confirmatory order item, your concurrence is reguired prior to revising the schedule.

This proposed schedule change was discussed with the NRC Project Manager for the Turkey Point Plant.

If you have-any questi.ons, please contact us.

Very truly yours, W. F.

way Senior ice President Nuclear WFC/TCG/cm Attachment cc:,

Stewart D. Ebneter,.

Regional 'Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant

INTEGRATED SCHEDULE MONTHLY

SUMMARY

Commitment dates associated with outage related modifications have been changed in accordance with outage cycle duration and shutdown/startup date revisions.

These revisions are based on the following refueling and maintenance outages.

OUTAGE DESCRIPTION START FINISH LENGTH Unit Unit Unit.

Unit Unit Unit Unit Unit 3 Short Notice 3 Cycle 12 Refueling 3 Diesel Tie-In 3 Cycle 13 Refueling 3 Cycle 14 Refueling 4 Cycle 12 Refueling 4 Cycle 13 Refueling 4 Cycle 14 Refueling 10/01/88 11/18/89 11/01/90 09/17/91 09/15/93 09/20/88 09/17/90 09/15/92 02/03/89

-03/05/90 12/31/90 12/31/91 11/17/93 03/27/89 12/31/90 11/17/92 125 105 60 105 60 188 105 60 The following modifications have slipped passed their respective commitment dates as a result of a major increase in Engineering scope for the Security and Emergency Diesel projects and the inclusion of the Probability Risk Assessment Program Modification (Mod 1325).

Mod 0550 Mod 0792 Mod 1011 Mod 1069 Mod 1070 Mod 1289 Mod 1291 Mod 1292 Mod 1293 Mod 1294 Mod 1297 Mod 1298 Mod 1056 3

S S

3 4

S C

S 3

4 3

4 S

Normal Ctmnt Coolers Control Switches Control Room Lighting Evaluation Control Room HFE Annunciator Study Reactor Head Lift Rig Load Cell Reactor Head Lift Rig Load Cell Safety Parameter Display Sys HFE Review Control Room Relabeling Control Room Demarcation Documentation Control Load Meters-Add Units/Chg Scale Control Load Meters-Add Units/Chg Scale NIS-Eliminate Unused Switch Positions NIS-Eliminate Unused Switch Positions Power Loss to Vital Bus at Salem 2

NRR NRR NRR NRR NRR NRR NRR NRR NRR NRR NRR NRR I&E Mod 0531 3 Install CCW Amertap System The committed portion of this modification, was completed on 12/2/88 per CTRAC 87-1029-03 and.JPN-PTN-88-2363.

Mod 0576 C

EDG Air Start Motors Upgrade This modification has been placed on hold pending resolution of final design, and NRC concurrence with the FPL request to reschedule the completion date to coincide with completion of the Emergency Power System Enhancement Project.

IO ev

Xntegrated Schedule Monthly Summary Page 2

Mod 1043 4 Small Piping Funct Walkdown I/C (ARM/PRM/NCC)

Mod 1045 3 Small Piping Funct Walkdown I/O (ARM/PRM/NCC)

These Select Safety System walkdowns and functionality reviews were completed ahead of schedule per.FPL letter L-89-025 dated 1/25/89.

Mod 0387 3 Control, Switch for CV-3722 and CV-2913 This Human Factors Modification (PC/M 86-191) was completed during the recent Unit 3

Short Notice

,Outage ahead of schedule.

Mod 1325 S Probability Risk Assessment Program NRR Mod 1313 3 Small Bore Piping NCR Disposition X&E Mod 1314 4 Small Bore Piping NCR Disposition I&E Mod 1325 was added to this issue as an NRR modification based upon NRC Generic Letter GL-88-20.

The categories for Mods 1313 and 1314'ave been changed from FPL to Z&E based upon FPL letter L-87-73 dated 2/17/87.

'il.

'll