L-89-025, Forwards Dec 1988 Select Sys Assessment Progress Summary,Per Commission 860812 Order

From kanterella
(Redirected from L-89-025)
Jump to navigation Jump to search
Forwards Dec 1988 Select Sys Assessment Progress Summary,Per Commission 860812 Order
ML17347A928
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/25/1989
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-89-025, L-89-25, NUDOCS 8902010164
Download: ML17347A928 (4)


Text

=- ~

" ACCELEMTKD DI BUTION DEMONSTR ON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8902010164 DOC.DATE: 89/01/25 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Florida Power

& Light Co.

RECXP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET g

05000250 05000251

SUBJECT:

Forwards Dec 1988 select sys assessment progress summary,per 860812 order.

I DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL ~

SIZE:

TITLE: OR Submittal: General Distribution NOTES fj RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DEST/SICB NUDOCS-CT FILE 0

EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1

0 1

1 1

0 1

1 1

1 1

~

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/DOEA/TSB 11 OGC/HDS2 RES/DSIR/EXB NRC PDR COPIES

'TTR ENCL 2

2 1

1 1

1 1,

1 1'

1 0

1 1

1 S

J' I

R NOXE IO ALL "RXDS" RECXPIEPIS'LEASE HELP US IO RECCE WASTE.'XKZKCT 'IHE DOCUMEÃZ CClNIBOL DESK, ROOM P1-37 (EXT. 20079)

KO EILlKBQQZ YOUR NAME FBQM DISTRZBUTZCjN ZZSTS FOR DOCUMENXS YOU DOtN'T NEED)

S j'

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 19 ENCL.

16

~

J 0

P.O. Box14000, Juno Beach, FL 33408-0420 JANUARY 2 5 1989 L-89-025 U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the December 1988.

progress summary of the Select System Assessment.

Should there be any questions regarding this information, please contact us.

Very truly yours, W.

F,.

Con Senior Vi e President Nuclear WFC/TCG/gp Attachment cc:

Malcolm L. Ernst, Acting Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 89020i0i64 890i25 PDR ADOCK 05000250 R

PDC

SELECT'YSTEM REVIEW DECEMBER 1988 PROGRESS Desi n Basis Reconstitution Design Basis Verification activities for the original fifteen select systems continues in accordance with the Integrated Schedule Completion of this activity is scheduled for May 8, 1989.

Design Basis Verification activities for Area Radiation Monitoring System (ARMS), Process Radiation Monitoring System (PRMS) and normal containment cooling systems will proceed in accordance with the Integrated Schedule.

Completion of this activity is scheduled for June 1, 1989.

Va13cdawns Small Bore Pipin'g and Tubing (ARMS, PRMS and normal containment cooling systems)

Unit 4

inside Containment complete reviews.

including functionality Unit 3,

4 and Common area outside Containment in progress in accordance with the Integrated Schedule for completion by February 28, 1989.

Unit 3

inside Containment complete reviews.

including functionality P

& ID (ARMS PRMS and normal containment cooling systems)

Unit 3

inside Containment will be performed during the next Unit 3

refueling outage in accordance with the Integrated Schedule.